Tender For Providing Services For Tube Cleaning Of Evaporator Sets, Vacuum Pans, Tubular Juice Heaters & Equipment Cleaning Of Juice Sulphiter, Syrup Sulphiter, Sulphur Furnace & Repairing Of Tool Head Cutter & Flexible Shaft At Hbl Plant Sugauli, Un
Tender Overview
Project Description
Tender for Providing Services For Tube Cleaning Of Evaporator Sets, Vacuum Pans, Tubular Juice Heaters & Equipment Cleaning Of Juice Sulphiter, Syrup Sulphiter, Sulphur Furnace & Repairing Of Tool Head Cutter & Flexible Shaft At Hbl Plant Sugauli, Under Distt. - East Ch Aran, Bihar.
BOQ
| Sl. No. | Item Description |
| 1 | PART - A : SUGAULI - Tube cleaning jobs of Old Evaporator set & Vacuum Pans: |
| 2 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 1 having heating surface area-1000 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. |
| 3 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 2 having heating surface area-1100 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. |
| 4 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 3 having heating surface area-550 sq. m,. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. |
| 5 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 4 having heating surface area-550 sq. m . Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. |
| 6 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 5 having heating surface area-400 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. |
| 7 | Opening, box up of manholes, sight glass and tubes cleaning of vacuum pans (40 Ton). Contractor have to run 3 shaft in one time and cleaning should be completed within 4 hrs. |
| 8 | Opening, box up of manholes, sight glass and tubes cleaning of vacuum pans (60 Ton). Contractor have to run 3 shaft in one time and cleaning should be completed within 4 hrs. |
| 9 | Tube cleaning job of New Evaporator set & Juice Heaters |
| 10 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 1 having heating surface area-2650 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. |
| 11 | Opening, box up of manholes, sight glass and tubes cleaning evaporator body no. 2 having heating surface area-2400 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. |
| 12 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 3 having heating surface area-1100 sq. m,. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. |
| 13 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 4 having heating surface area-700 sq. m,. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. |
| 14 | Opening, box up of manholes, sight glass and tubes cleaning of evaporator body no. 5 having heating surface area-400 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. |
| 15 | Opening and box up of top and bottom cover and tube cleaning of tubular juice heater (H.S. - 240 sq. m). Contractor have to run 2 shaft in one time and cleaning should be completed within 8 hrs. |
| 16 | Opening and box up of top and bottom cover and tube cleaning of condensate juice heater (H.S. - 265 sq. m). Contractor have to run 2 shaft in one time and cleaning should be completed within 8 hrs. |
| 17 | Equipment’s cleaning, chemicals shifting & filling job. |
| 18 | Opening, box up of manholes, sight glass and cleaning of juice sulphiter including gas line, should be completed within 8 hrs. |
| 19 | Opening, box up of manholes, sight glass cleaning of syrup sulphiter including gas line, should be completed within 8 hrs. |
| 20 | Cleaning of Sulphur furnace & it's gas line, cleaning should be completed within 4 hrs. |
| 21 | Shifting of chemical bags (50 kgs) from ware house to different bodies of evaporator set & filling of chemical in respective bodies. Job should be completed within 4 hrs. after evacuation of evaporator set. |
| 22 | Repairing of shaft, Cutter etc. |
| 23 | Repairing of tool head cutter, job includes providing and replacement of cutter beeds, arm pin, lock pin, spring straight cutter, hinge etc. |
| 24 | Repairing of flexible shaft, job include providing and replacement of inner core, hand pieces, motor side nipple, shaft end nipple, coupling, jointing outer casing of flexible shaft/razing sockets and inner core etc. |
| 25 | PART - B : LAURIYA - Tube cleaning job of old evaporator set & Vacuum Pan 40 T |
| 26 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 1 having heating surface area-1000 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 27 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 2 having heating surface area-1100 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 28 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 3 having heating surface area-550 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 29 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 4 having heating surface area-550 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. Job basis |
| 30 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 5 having heating surface area-400 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 31 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of vacuum pans (40 Ton). Contractor have to run 3 shaft in one time and cleaning should be completed within 2 hrs. Job Basis |
| 32 | Tube cleaning job of New evaporator set, Juice Heater & Vacuum Pan 60 T |
| 33 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 1 having heating surface area-2650 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 34 | Opening & Box up of Both Manhole, Sight glass and Tube cleaning evaporator body no. 2 having heating surface area-2400 sq. m. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 35 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 3 having heating surface area-1100 sq. m,. Contractor have to run 3 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 36 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of evaporator body no. 4 having heating surface area-700 sq. m,. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 37 | Opening & Box up of Both Manhole, Sight glass Cleaning tubes of evaporator body no. 5 having heating surface area-400 sq. m. Contractor have to run 2 shaft in one time and cleaning should be completed within 24 hrs. Job Basis |
| 38 | Opening & Box up of Both Manhole, Sight glass and Cleaning tubes of vacuum pans (60 Ton). Contractor have to run 3 shaft in one time and cleaning should be completed within 2 hrs. Job Basis |
| 39 | Opening & Box up Top, Bottom Manhole and Cleaning tubes of tubular juice heater (H.S.-240sqm). Contractor have to run 2 shaft in one time and cleaning should be completed within 2 hrs. Job Basis |
| 40 | Opening & Box up Top, Bottom Manhole and Tube cleaning for condensate juice heater (H.S.-265sqm). Contractor have to run 2 shaft in one time and cleaning should be completed within 2 hrs. Job Basis |
| 41 | Equipment cleaning , chemicals shifting & filling job. |
| 42 | Opening & Box Up Manhole, gas line dummy and Cleaning of juice sulphiter, cleaning should be completed within 3 hrs. Job Basis |
| 43 | Opening & Box Up Manhole, gas line dummy and Cleaning of syrup sulphiter should be completed within 4 hrs. Job Basis |
| 44 | Opening & Fitting Gasline Dummy and Cleaning of Sulphur furnace & it's gas line, cleaning should be completed within 2 hrs. Job Basis |
| 45 | Shifting of chemical bags (50 kgs) from ware house to different bodies of evaporator set & filling of chemical in respective bodies. Job should be completed within 4 hrs. after evacuation of evaporator set job basis |
| 46 | Repairing of shaft & cutter |
| 47 | Repairing of tool head cutter. Job includes providing and replacement of cutter beeds, arm pin, lock pin, spring, straight cutter, hinge etc Job Basis |
| 48 | Repairing of flexible shaft. Job include providing and replacement of inner core, hand pieces, motor side nipple, shaft end nipple, coupling, jointing outer casing of flexible shaft, brazing sockets and inner core etc. Job Basis Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender