Bids Are invited for Custom Bid For Services - Triennial Contract For Electrical Maintenance At Ntecl Vallur (3X500 Mw) - Sw Yard/Dc/Dg/Pa/Protection , Switch Yard (400 Kv) Tightening , Switch Yard (400 Kv) Replacement , Switch Yard (400 Kv) Hotspot
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Triennial Contract For Electrical Maintenance At Ntecl Vallur (3X500 Mw) - Sw Yard/Dc/Dg/Pa/Protection , Switch Yard (400 Kv) Tightening , Switch Yard (400 Kv) Replacement , Switch Yard (400 Kv) Hotspot Rectifction , Conductors (<>) Jointing , Marsh.Box (400Kv) 52W Chks , Switch Yard (400 Kv) (Leakage Attending) , Switch Yard (400 Kv) Inspection , Switch Yard (400 Kv) Repl Dmgd Item , Switch Yard (400 Kv) Oil Filling , Switch Yard (400 Kv) Checking , Switch Yard (400 Kv) Cleaning , Maint Of Sf6 Gas Liquefication Machine , Switch Yard (400 Kv) Shifting , Switch Yard (400 Kv) Grass Cutting , Battery Bank (<>) Daily Chks , Battery Bank (220V) Inspectn&Cleaning , Battery Bank Cell (220V) Electrolyte Fil , Battery Bank (12V) Cleaning , Battery Bank (220V) Pm Job , Battery Bank (220V) Capacitance Test , Battery Bank (220V) 04W Chks , Battery Bank (12V) 02W Chks , Battery Bank Cell (220V) Replacement , Dcdb (<>) Earthfault Detection , Dg Sets (Alt) (<>) 24W Chks , Switch Yard (400 Kv) Pm Job , Fibre Optic Cables (<>) Jointing , Cable/Pipe Trench (<>) Jointing , Switch Yard (400 Kv) Hndlg & Tptn , Numerical Relay (<>) Repl , Control Panels (<>) Attend Breakdown , Protn Pnl (220Vdc) Pm Job , Switch Yard (400 Kv) Painting (Above 15M , Switch Yard (400 Kv) Tan Delta Test , Numerical Relay (<>) Testing , Stn Earthing System (<>)Maintenance Work , Pa System (<>) 04W Chks , Pa System Attend Breakdown , Switch Yard (400 Kv) Washing(Online) , Switchyard Hot Line Mobilisation Charges , Test Eqpt (Portable) Calibration , Switch Yard (400 Kv) Gantry Replacement , Switch Yard (Dbl Crt Tower) Painting , Generator (<>) Checking , Ht/Lt Switchgear Works , Switchgears (Breaker) 12W Chks , Switchgears (Module) 12W Chks , Vfd Sys (<>) 24W Chks , Vfd Sys (<>) Oh , Switchgears(0.4Kv)-Oh , Switchgears (6.6Kv) Oh , Switchgears (Breaker) Attend Breakdown , Esp/Area (<>) Checking , Switchgears (Mcc) Misc Works , Esp/Area (<>) Maintenance Works , Esp/Area (<>) Oh , Vfd Sys (<>) Attend Breakdown , Switchgears (Mcc) Maintenance Works , Switchgears (Mcc) Repl Dmgd Item , Workshop (<>) 01W Chks , Cables (<>) Connection , Ht And Lt Motor Works , Lt Motor (<>) 12W Chks , Lt Motor (<>) Oh , Lt Motor (<>) Attend Breakdown , Lt Motor (<>) Decpl/Cpl/Algn , Lt Motor (<>) Aligning , Lt Motor (<>) Misc Works , Lt Motor (<>) Repl Dmgd Item , Lt Motor (<>) Assembling , Ht Motors (>1500-2000Kw) 12W Chks , Ht Motors (>1500-2000Kw) Oh , Ht Motors (Bearing) Rpl-Brg , Ht Motors (>1500-2000Kw) Decpl/Cpl/Algn , Ht Motors (>1500-2000Kw) Maint Works , Ht Motors (>4000Kw) Oil Filling , Ht Motors (>2000-4000Kw) Replacement , Ht Motors (>2000-4000Kw) Oh , Ht Motors (Cooler) Repl Dmgd Item , Ht Motors (>2000-4000Kw) Replace-Brg , Ht Motors (Bearing) Inspection , Ht Motors (Stator) Loading , Ht Motors (>4000Kw) Inspection , Ht Motors (>4000Kw) Oh , Ht Motors(Brg Housing) Maintenance Work , Lt Motor (<=2.2Kw) Rewdg , Lt Motor (>2.2-5.5Kw) Rewdg , Lt Motor (>5.5-18.5Kw) Rewdg , Lt Motor (>18.5-37Kw) Rewdg , Lt Motor (>37-55Kw) Rewdg , Lt Motor (>55-90Kw) Rewdg , Lt Motor (>90Kw-135 Kw) Rewdg , Lt Motor (>135 Kw) Rewdg , Lt Motor Replace Dmgd Item:003 , Lt Motor Repair , Workshop (<>) Shifting , Workshop (<>) Transportation , Ht Motors (Rotor Shaft) Balancing , Lighting Hoist And Cable Works , Lighting System (Local Pnls) Maintenance , Lighting System (Local Pnls) Replace/Ere , Switch Board (<>) Maintenance Works , Lighting System (Weldg Recptcls) Attend , Local Control Panel (<>) Attend Defect , Lighting System Light Fitting/Fan Attend , Lighting System Light Fitting/Fan Erecti , Lighting System (Permanent) Wiring , Lighting System (Permanent) Circuit Faul , Lighting System (Temporary) Connection , Lighting System Street Light Pole Remova , Lighting System Street Light Pole Painti , Lighting System Lighting Hi Mast Misc Wo , Lighting System (Permanent) Minor Maint , Cables Below 85Mm Od Laying , Cables (<>) Laying On Ground , Cables Supply And End Termination , Cables Supply & Cable Jointing , Cables (<>) End Termination , Cables Stright Through Cable Joint , Cables (Hv) Termination , Cables (Hv) Jointing , Cables Replace Damaged Lug , Cable Trays Instal/Remove , Cables (<>) Laying Pipe For Cabling , Cables (<>) Earthing , Elec Hoists (<>) 24W Chks , Elec Hoists (<>) Cap.Test , Elec Hoists (<>) Attend Breakdown , Elec Hoists Apply Rope Compound , Eot/Cranes Oh , Eot/Cranes Testing , Eot/Cranes (<>) Attend Breakdown , Eot/Cranes (<>) Apply Rope Compound , Eot/Cranes Oh Of Wheel Mh,Ah,Lt,Ct , Elec Hoists (<>) Repl Dmgd Item , Eot/Cranes Replacement Of Wheel Bearing , Exhaust Fan (<>) 48W Chks , Exhaust Fan (<>) Attend Breakdown , Lighting System-Serial Light Supply/Erec , Boom Lift (<>) Attend Breakdown , Actuator And Soot Blower Maintenance , Motorized Actuators (<>) Attend Breakdow , Motorized Actuators Replacement , Motorized Actuators 48W Chks , Motorized Actuators (<>) Oh , Motorized Actuators Seal Replacement , Biweekly Inspect/Restore Act/Sb Earthing , Motorized Actuators (<>) Man.Dep.-Gangme , Ac ,Freezer,Refrigerator & Cooler Works , A/C System (<>) 04W Chks , Tower Type A/C (4Ton) 04W Chks , H2 Drier (<>) 04W Chks , A/C System (<>) Attend Breakdown , H2 Drier (<>) Attend Breakdown , A/C System (<>) Repair , A/C System (<>) Oh , Refriz (<>) 04W Chks , A/C System (<>) Instal/Remove , Transformer Maintenance , Transformer <> 48W Chks , Transformer <> Connection , Transformer <> Mb Check , Transformer <> Inspection , Transformer <> Water Washing , Transformer <> Reprocessing , Transformer <> Filtration , Transformer Service/Repair Replacement , Transformer <> Connection , Transformer <> Top Up , Transformer <> Testing , Transformer <> Attend Breakdown , Transformer <> He Drains Chkg , Transformer <> Repl Dmgd Item , Transformer <> Repl Dmgd Item , Transformer <> Repl Dmgd Item:003 , Transformer <> Shifting , Transformer <> Cleaning , Transformer <> Poly Cover , Transformer <> Scanning/Modelling , Esp/Area (Rectiformer) Repl , Esp/Area (Rectiformer) Attend Breakdown , Transformer <> Deweeding , Transformer <> Lt Trf , Transformer Gt Internal Inspection , Transformer <> Bus Vt Pm , Bus Ducts (<>) Attend Breakdown , Bus Ducts (<>) Checking , Bus Ducts (<>) Attend Defect , Oil Filtration M/C (<>) Hiring , Transformer Fabrication , Transformer <> Repl Dmgd Item:005 , Transformer <> Courier Service , Transformer <> Dismantle/Ovening , Man Power Assistance , Prov Supervisor For Elect Maint , Prov Asst Skilled Man.Dep-Sw , Prov Asst Semi-Skilled Man.Dep-Ssw , Spl.M/P.Dep (Ot-H Day) Attend Defect , Spl.M/P.Dep (<>) Man.Dep-Sw , Spl.M/P.Dep (<>) Man.Dep-Ssw , Spl.M/P.Dep (<>) Man.Dep-Usw , Auxillary Works For Emd , Electrical Equipment Cat B-Minor Repair , Electrical Equipment Cat B-Minor Repair , Hydra Cap <=20 Mt Hiring , Hydra (Cap-14T) Hiring , Tractor/Trolley Hiring , Truck (Full) Hiring , St 125Ft Boom Lift Hiring , St 60Ft Boom Lift Hiring , Matl (<>) Shifting , Scaffolding (<>) Fixing
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | SW YARD/DC/DG/PA/PROTECTION | SW YARD/DC/DG/PA/PROTECTION |
| 2 | Switch Yard (400 KV) TIGHTENING | Switch Yard (400 KV) TIGHTENING |
| 3 | Switch Yard (400 KV) REPLACEMENT | Switch Yard (400 KV) REPLACEMENT |
| 4 | Switch Yard (400 KV) HOTSPOT RECTIFCTION | Switch Yard (400 KV) HOTSPOT RECTIFCTION |
| 5 | Conductors (<>) Jointing | Conductors (<>) Jointing |
| 6 | MARSH.BOX (400KV) 52W CHKS | MARSH.BOX (400KV) 52W CHKS |
| 7 | Switch Yard (400 KV) (LEAKAGE ATTENDING) | Switch Yard (400 KV) (LEAKAGE ATTENDING) |
| 8 | Switch Yard (400 KV) INSPECTION | Switch Yard (400 KV) INSPECTION |
| 9 | Switch Yard (400 KV) REPL DMGD ITEM | Switch Yard (400 KV) REPL DMGD ITEM |
| 10 | Switch Yard (400 KV) OIL FILLING | Switch Yard (400 KV) OIL FILLING |
| 11 | Switch Yard (400 KV) Checking | Switch Yard (400 KV) Checking |
| 12 | Switch Yard (400 KV) Cleaning | Switch Yard (400 KV) Cleaning |
| 13 | Maint of SF6 Gas Liquefication Machine | Maint of SF6 Gas Liquefication Machine |
| 14 | Switch Yard (400 KV) SHIFTING | Switch Yard (400 KV) SHIFTING |
| 15 | Switch Yard (400 KV) GRASS CUTTING | Switch Yard (400 KV) GRASS CUTTING |
| 16 | Battery Bank (<>) Daily Chks | Battery Bank (<>) Daily Chks |
| 17 | Battery Bank (220V) INSPECTN&CLEANING | Battery Bank (220V) INSPECTN&CLEANING |
| 18 | Battery Bank Cell (220V) ELECTROLYTE FIL | Battery Bank Cell (220V) ELECTROLYTE FIL |
| 19 | Battery Bank (12V) Cleaning | Battery Bank (12V) Cleaning |
| 20 | Battery Bank (220V) PM JOB | Battery Bank (220V) PM JOB |
| 21 | Battery Bank (220V) CAPACITANCE TEST | Battery Bank (220V) CAPACITANCE TEST |
| 22 | Battery Bank (220V) 04W Chks | Battery Bank (220V) 04W Chks |
| 23 | Battery Bank (12V) 02W Chks | Battery Bank (12V) 02W Chks |
| 24 | Battery Bank Cell (220V) REPLACEMENT | Battery Bank Cell (220V) REPLACEMENT |
| 25 | DCDB (<>) EARTHFAULT DETECTION | DCDB (<>) EARTHFAULT DETECTION |
| 26 | DG SETS (ALT) (<>) 24W Chks | DG SETS (ALT) (<>) 24W Chks |
| 27 | Switch Yard (400 KV) PM JOB | Switch Yard (400 KV) PM JOB |
| 28 | Fibre Optic Cables (<>) Jointing | Fibre Optic Cables (<>) Jointing |
| 29 | CABLE/PIPE TRENCH (<>) JOINTING | CABLE/PIPE TRENCH (<>) JOINTING |
| 30 | Switch Yard (400 KV) Hndlg & Tptn | Switch Yard (400 KV) Hndlg & Tptn |
| 31 | NUMERICAL RELAY (<>) Repl | NUMERICAL RELAY (<>) Repl |
| 32 | Control Panels (<>) ATTEND BREAKDOWN | Control Panels (<>) ATTEND BREAKDOWN |
| 33 | PROTN PNL (220VDC) PM JOB | PROTN PNL (220VDC) PM JOB |
| 34 | Switch Yard (400 KV) PAINTING (ABOVE 15M | Switch Yard (400 KV) PAINTING (ABOVE 15M |
| 35 | Switch Yard (400 KV) TAN DELTA TEST | Switch Yard (400 KV) TAN DELTA TEST |
| 36 | NUMERICAL RELAY (<>) Testing | NUMERICAL RELAY (<>) Testing |
| 37 | Stn Earthing System (<>)MAINTENANCE WORK | Stn Earthing System (<>)MAINTENANCE WORK |
| 38 | PA System (<>) 04W Chks | PA System (<>) 04W Chks |
| 39 | PA System ATTEND BREAKDOWN | PA System ATTEND BREAKDOWN |
| 40 | Switch Yard (400 KV) WASHING(ONLINE) | Switch Yard (400 KV) WASHING(ONLINE) |
| 41 | SwitchYard hot line mobilisation charges | SwitchYard hot line mobilisation charges |
| 42 | TEST EQPT (PORTABLE) Calibration | TEST EQPT (PORTABLE) Calibration |
| 43 | Switch Yard (400 KV) GANTRY REPLACEMENT | Switch Yard (400 KV) GANTRY REPLACEMENT |
| 44 | Switch Yard (DBL CRT TOWER) PAINTING | Switch Yard (DBL CRT TOWER) PAINTING |
| 45 | GENERATOR (<>) Checking | GENERATOR (<>) Checking |
| 46 | HT/LT Switchgear Works | HT/LT Switchgear Works |
| 47 | SWITCHGEARS (BREAKER) 12W Chks | SWITCHGEARS (BREAKER) 12W Chks |
| 48 | SWITCHGEARS (MODULE) 12W Chks | SWITCHGEARS (MODULE) 12W Chks |
| 49 | VFD SYS (<>) 24W Chks | VFD SYS (<>) 24W Chks |
| 50 | VFD SYS (<>) OH | VFD SYS (<>) OH |
| 51 | Switchgears(0.4KV)-OH | Switchgears(0.4KV)-OH |
| 52 | SWITCHGEARS (6.6KV) OH | SWITCHGEARS (6.6KV) OH |
| 53 | SWITCHGEARS (BREAKER) ATTEND BREAKDOWN | SWITCHGEARS (BREAKER) ATTEND BREAKDOWN |
| 54 | ESP/Area (<>) Checking | ESP/Area (<>) Checking |
| 55 | SWITCHGEARS (MCC) MISC WORKS | SWITCHGEARS (MCC) MISC WORKS |
| 56 | ESP/Area (<>) MAINTENANCE WORKS | ESP/Area (<>) MAINTENANCE WORKS |
| 57 | ESP/Area (<>) OH | ESP/Area (<>) OH |
| 58 | VFD SYS (<>) ATTEND BREAKDOWN | VFD SYS (<>) ATTEND BREAKDOWN |
| 59 | SWITCHGEARS (MCC) MAINTENANCE WORKS | SWITCHGEARS (MCC) MAINTENANCE WORKS |
| 60 | SWITCHGEARS (MCC) REPL DMGD ITEM | SWITCHGEARS (MCC) REPL DMGD ITEM |
| 61 | Workshop (<>) 01W CHKS | Workshop (<>) 01W CHKS |
| 62 | Cables (<>) Connection | Cables (<>) Connection |
| 63 | HT and LT Motor Works | HT and LT Motor Works |
| 64 | LT MOTOR (<>) 12W Chks | LT MOTOR (<>) 12W Chks |
| 65 | LT MOTOR (<>) OH | LT MOTOR (<>) OH |
| 66 | LT MOTOR (<>) ATTEND BREAKDOWN | LT MOTOR (<>) ATTEND BREAKDOWN |
| 67 | LT MOTOR (<>) Decpl/Cpl/Algn | LT MOTOR (<>) Decpl/Cpl/Algn |
| 68 | LT MOTOR (<>) ALIGNING | LT MOTOR (<>) ALIGNING |
| 69 | LT MOTOR (<>) MISC WORKS | LT MOTOR (<>) MISC WORKS |
| 70 | LT MOTOR (<>) REPL DMGD ITEM | LT MOTOR (<>) REPL DMGD ITEM |
| 71 | LT MOTOR (<>) ASSEMBLING | LT MOTOR (<>) ASSEMBLING |
| 72 | HT MOTORS (>1500-2000KW) 12W Chks | HT MOTORS (>1500-2000KW) 12W Chks |
| 73 | HT MOTORS (>1500-2000KW) OH | HT MOTORS (>1500-2000KW) OH |
| 74 | HT MOTORS (BEARING) RPL-BRG | HT MOTORS (BEARING) RPL-BRG |
| 75 | HT MOTORS (>1500-2000KW) Decpl/Cpl/Algn | HT MOTORS (>1500-2000KW) Decpl/Cpl/Algn |
| 76 | HT MOTORS (>1500-2000KW) MAINT WORKS | HT MOTORS (>1500-2000KW) MAINT WORKS |
| 77 | HT MOTORS (>4000KW) OIL FILLING | HT MOTORS (>4000KW) OIL FILLING |
| 78 | HT MOTORS (>2000-4000KW) Replacement | HT MOTORS (>2000-4000KW) Replacement |
| 79 | HT MOTORS (>2000-4000KW) OH | HT MOTORS (>2000-4000KW) OH |
| 80 | HT MOTORS (COOLER) REPL DMGD ITEM | HT MOTORS (COOLER) REPL DMGD ITEM |
| 81 | HT MOTORS (>2000-4000KW) REPLACE-BRG | HT MOTORS (>2000-4000KW) REPLACE-BRG |
| 82 | HT MOTORS (BEARING) INSPECTION | HT MOTORS (BEARING) INSPECTION |
| 83 | HT MOTORS (STATOR) LOADING | HT MOTORS (STATOR) LOADING |
| 84 | HT MOTORS (>4000KW) INSPECTION | HT MOTORS (>4000KW) INSPECTION |
| 85 | HT MOTORS (>4000KW) OH | HT MOTORS (>4000KW) OH |
| 86 | HT MOTORS(BRG HOUSING) MAINTENANCE WORK | HT MOTORS(BRG HOUSING) MAINTENANCE WORK |
| 87 | LT MOTOR (<=2.2KW) Rewdg | LT MOTOR (<=2.2KW) Rewdg |
| 88 | LT MOTOR (>2.2-5.5KW) Rewdg | LT MOTOR (>2.2-5.5KW) Rewdg |
| 89 | LT MOTOR (>5.5-18.5KW) Rewdg | LT MOTOR (>5.5-18.5KW) Rewdg |
| 90 | LT MOTOR (>18.5-37KW) Rewdg | LT MOTOR (>18.5-37KW) Rewdg |
| 91 | LT MOTOR (>37-55KW) Rewdg | LT MOTOR (>37-55KW) Rewdg |
| 92 | LT MOTOR (>55-90KW) Rewdg | LT MOTOR (>55-90KW) Rewdg |
| 93 | LT MOTOR (>90KW-135 KW) Rewdg | LT MOTOR (>90KW-135 KW) Rewdg |
| 94 | LT MOTOR (>135 KW) Rewdg | LT MOTOR (>135 KW) Rewdg |
| 95 | LT MOTOR REPLACE DMGD ITEM:003 | LT MOTOR REPLACE DMGD ITEM:003 |
| 96 | LT MOTOR REPAIR | LT MOTOR REPAIR |
| 97 | Workshop (<>) SHIFTING | Workshop (<>) SHIFTING |
| 98 | Workshop (<>) TRANSPORTATION | Workshop (<>) TRANSPORTATION |
| 99 | HT MOTORS (ROTOR SHAFT) BALANCING | HT MOTORS (ROTOR SHAFT) BALANCING |
| 100 | Lighting Hoist and Cable Works | Lighting Hoist and Cable Works |
| 101 | Lighting System (LOCAL PNLS) MAINTENANCE | Lighting System (LOCAL PNLS) MAINTENANCE |
| 102 | Lighting System (LOCAL PNLS) REPLACE/ERE | Lighting System (LOCAL PNLS) REPLACE/ERE |
| 103 | SWITCH BOARD (<>) MAINTENANCE WORKS | SWITCH BOARD (<>) MAINTENANCE WORKS |
| 104 | Lighting System (WELDG RECPTCLS) ATTEND | Lighting System (WELDG RECPTCLS) ATTEND |
| 105 | LOCAL CONTROL PANEL (<>) Attend Defect | LOCAL CONTROL PANEL (<>) Attend Defect |
| 106 | Lighting System LIGHT FITTING/FAN ATTEND | Lighting System LIGHT FITTING/FAN ATTEND |
| 107 | Lighting System LIGHT FITTING/FAN Erecti | Lighting System LIGHT FITTING/FAN Erecti |
| 108 | Lighting System (Permanent) WIRING | Lighting System (Permanent) WIRING |
| 109 | Lighting System (Permanent) CIRCUIT FAUL | Lighting System (Permanent) CIRCUIT FAUL |
| 110 | Lighting System (Temporary) Connection | Lighting System (Temporary) Connection |
| 111 | Lighting System STREET LIGHT POLE REMOVA | Lighting System STREET LIGHT POLE REMOVA |
| 112 | Lighting System STREET LIGHT POLE Painti | Lighting System STREET LIGHT POLE Painti |
| 113 | Lighting System LIGHTING HI MAST MISC WO | Lighting System LIGHTING HI MAST MISC WO |
| 114 | Lighting System (Permanent) MINOR MAINT | Lighting System (Permanent) MINOR MAINT |
| 115 | Cables BELOW 85MM OD Laying | Cables BELOW 85MM OD Laying |
| 116 | Cables (<>) LAYING ON GROUND | Cables (<>) LAYING ON GROUND |
| 117 | Cables SUPPLY AND END TERMINATION | Cables SUPPLY AND END TERMINATION |
| 118 | Cables SUPPLY & CABLE JOINTING | Cables SUPPLY & CABLE JOINTING |
| 119 | Cables (<>) END TERMINATION | Cables (<>) END TERMINATION |
| 120 | Cables STRIGHT THROUGH CABLE JOINT | Cables STRIGHT THROUGH CABLE JOINT |
| 121 | Cables (HV) TERMINATION | Cables (HV) TERMINATION |
| 122 | Cables (HV) Jointing | Cables (HV) Jointing |
| 123 | Cables REPLACE DAMAGED LUG | Cables REPLACE DAMAGED LUG |
| 124 | Cable Trays Instal/Remove | Cable Trays Instal/Remove |
| 125 | Cables (<>) LAYING PIPE FOR CABLING | Cables (<>) LAYING PIPE FOR CABLING |
| 126 | Cables (<>) EARTHING | Cables (<>) EARTHING |
| 127 | ELEC HOISTS (<>) 24W Chks | ELEC HOISTS (<>) 24W Chks |
| 128 | ELEC HOISTS (<>) CAP.TEST | ELEC HOISTS (<>) CAP.TEST |
| 129 | ELEC HOISTS (<>) ATTEND BREAKDOWN | ELEC HOISTS (<>) ATTEND BREAKDOWN |
| 130 | ELEC HOISTS APPLY ROPE COMPOUND | ELEC HOISTS APPLY ROPE COMPOUND |
| 131 | EOT/CRANES OH | EOT/CRANES OH |
| 132 | EOT/CRANES Testing | EOT/CRANES Testing |
| 133 | EOT/Cranes (<>) ATTEND BREAKDOWN | EOT/Cranes (<>) ATTEND BREAKDOWN |
| 134 | EOT/CRANES (<>) APPLY ROPE COMPOUND | EOT/CRANES (<>) APPLY ROPE COMPOUND |
| 135 | EOT/CRANES OH OF WHEEL MH,AH,LT,CT | EOT/CRANES OH OF WHEEL MH,AH,LT,CT |
| 136 | ELEC HOISTS (<>) REPL DMGD ITEM | ELEC HOISTS (<>) REPL DMGD ITEM |
| 137 | EOT/CRANES REPLACEMENT OF WHEEL BEAring | EOT/CRANES REPLACEMENT OF WHEEL BEAring |
| 138 | EXHAUST FAN (<>) 48W Chks | EXHAUST FAN (<>) 48W Chks |
| 139 | EXHAUST FAN (<>) ATTEND BREAKDOWN | EXHAUST FAN (<>) ATTEND BREAKDOWN |
| 140 | Lighting System-SERIAL LIGHT SUPPLY/EREC | Lighting System-SERIAL LIGHT SUPPLY/EREC |
| 141 | BOOM LIFT (<>) ATTEND BREAKDOWN | BOOM LIFT (<>) ATTEND BREAKDOWN |
| 142 | Actuator and Soot Blower Maintenance | Actuator and Soot Blower Maintenance |
| 143 | Motorized Actuators (<>) ATTEND BREAKDOW | Motorized Actuators (<>) ATTEND BREAKDOW |
| 144 | Motorized Actuators Replacement | Motorized Actuators Replacement |
| 145 | Motorized Actuators 48W Chks | Motorized Actuators 48W Chks |
| 146 | Motorized Actuators (<>) OH | Motorized Actuators (<>) OH |
| 147 | Motorized Actuators SEAL REPLACEMENT | Motorized Actuators SEAL REPLACEMENT |
| 148 | Biweekly inspect/restore ACT/SB earthing | Biweekly inspect/restore ACT/SB earthing |
| 149 | Motorized Actuators (<>) MAN.DEP.-GANGME | Motorized Actuators (<>) MAN.DEP.-GANGME |
| 150 | AC ,Freezer,Refrigerator & Cooler Works | AC ,Freezer,Refrigerator & Cooler Works |
| 151 | A/C SYSTEM (<>) 04W Chks | A/C SYSTEM (<>) 04W Chks |
| 152 | TOWER TYPE A/C (4TON) 04W Chks | TOWER TYPE A/C (4TON) 04W Chks |
| 153 | H2 DRIER (<>) 04W Chks | H2 DRIER (<>) 04W Chks |
| 154 | A/C SYSTEM (<>) ATTEND BREAKDOWN | A/C SYSTEM (<>) ATTEND BREAKDOWN |
| 155 | H2 DRIER (<>) ATTEND BREAKDOWN | H2 DRIER (<>) ATTEND BREAKDOWN |
| 156 | A/C SYSTEM (<>) Repair | A/C SYSTEM (<>) Repair |
| 157 | A/C SYSTEM (<>) OH | A/C SYSTEM (<>) OH |
| 158 | REFRIZ (<>) 04W Chks | REFRIZ (<>) 04W Chks |
| 159 | A/C SYSTEM (<>) Instal/Remove | A/C SYSTEM (<>) Instal/Remove |
| 160 | Transformer Maintenance | Transformer Maintenance |
| 161 | TRANSFORMER <> 48W Chks | TRANSFORMER <> 48W Chks |
| 162 | TRANSFORMER <> Connection | TRANSFORMER <> Connection |
| 163 | TRANSFORMER <> MB CHECK | TRANSFORMER <> MB CHECK |
| 164 | TRANSFORMER <> INSPECTION | TRANSFORMER <> INSPECTION |
| 165 | TRANSFORMER <> WATER WASHING | TRANSFORMER <> WATER WASHING |
| 166 | TRANSFORMER <> REPROCESSING | TRANSFORMER <> REPROCESSING |
| 167 | TRANSFORMER <> FILTRATION | TRANSFORMER <> FILTRATION |
| 168 | TRANSFORMER SERVICE/REPAIR REPLACEMENT | TRANSFORMER SERVICE/REPAIR REPLACEMENT |
| 169 | TRANSFORMER <> Connection | TRANSFORMER <> Connection |
| 170 | TRANSFORMER <> TOP UP | TRANSFORMER <> TOP UP |
| 171 | TRANSFORMER <> Testing | TRANSFORMER <> Testing |
| 172 | TRANSFORMER <> ATTEND BREAKDOWN | TRANSFORMER <> ATTEND BREAKDOWN |
| 173 | TRANSFORMER <> HE DRAINS CHKG | TRANSFORMER <> HE DRAINS CHKG |
| 174 | TRANSFORMER <> REPL DMGD ITEM | TRANSFORMER <> REPL DMGD ITEM |
| 175 | TRANSFORMER <> REPL DMGD ITEM | TRANSFORMER <> REPL DMGD ITEM |
| 176 | TRANSFORMER <> REPL DMGD ITEM:003 | TRANSFORMER <> REPL DMGD ITEM:003 |
| 177 | TRANSFORMER <> SHIFTING | TRANSFORMER <> SHIFTING |
| 178 | TRANSFORMER <> Cleaning | TRANSFORMER <> Cleaning |
| 179 | TRANSFORMER <> POLY COVER | TRANSFORMER <> POLY COVER |
| 180 | TRANSFORMER <> SCANNING/MODELLING | TRANSFORMER <> SCANNING/MODELLING |
| 181 | ESP/Area (RECTIFORMER) Repl | ESP/Area (RECTIFORMER) Repl |
| 182 | ESP/Area (RECTIFORMER) ATTEND BREAKDOWN | ESP/Area (RECTIFORMER) ATTEND BREAKDOWN |
| 183 | TRANSFORMER <> DEWEEDING | TRANSFORMER <> DEWEEDING |
| 184 | TRANSFORMER <> LT TRF | TRANSFORMER <> LT TRF |
| 185 | TRANSFORMER GT Internal Inspection | TRANSFORMER GT Internal Inspection |
| 186 | TRANSFORMER <> BUS VT PM | TRANSFORMER <> BUS VT PM |
| 187 | Bus Ducts (<>) ATTEND BREAKDOWN | Bus Ducts (<>) ATTEND BREAKDOWN |
| 188 | Bus Ducts (<>) Checking | Bus Ducts (<>) Checking |
| 189 | Bus Ducts (<>) Attend Defect | Bus Ducts (<>) Attend Defect |
| 190 | OIL FILTRATION M/C (<>) Hiring | OIL FILTRATION M/C (<>) Hiring |
| 191 | TRANSFORMER Fabrication | TRANSFORMER Fabrication |
| 192 | TRANSFORMER <> REPL DMGD ITEM:005 | TRANSFORMER <> REPL DMGD ITEM:005 |
| 193 | TRANSFORMER <> Courier Service | TRANSFORMER <> Courier Service |
| 194 | TRANSFORMER <> DISMANTLE/OVENING | TRANSFORMER <> DISMANTLE/OVENING |
| 195 | Man Power Assistance | Man Power Assistance |
| 196 | Prov supervisor for Elect Maint | Prov supervisor for Elect Maint |
| 197 | PROV ASST SKILLED MAN.DEP-SW | PROV ASST SKILLED MAN.DEP-SW |
| 198 | PROV ASST SEMI-SKILLED MAN.DEP-SSW | PROV ASST SEMI-SKILLED MAN.DEP-SSW |
| 199 | SPL.M/P.DEP (OT-H DAY) Attend Defect | SPL.M/P.DEP (OT-H DAY) Attend Defect |
| 200 | SPL.M/P.DEP (<>) MAN.DEP-SW | SPL.M/P.DEP (<>) MAN.DEP-SW |
| 201 | SPL.M/P.DEP (<>) MAN.DEP-SSW | SPL.M/P.DEP (<>) MAN.DEP-SSW |
| 202 | SPL.M/P.DEP (<>) MAN.DEP-USW | SPL.M/P.DEP (<>) MAN.DEP-USW |
| 203 | Auxillary Works for EMD | Auxillary Works for EMD |
| 204 | ELECTRICAL EQUIPMENT CAT B-MINOR REPAIR | ELECTRICAL EQUIPMENT CAT B-MINOR REPAIR |
| 205 | ELECTRICAL EQUIPMENT CAT B-MINOR REPAIR | ELECTRICAL EQUIPMENT CAT B-MINOR REPAIR |
| 206 | HYDRA CAP <=20 MT Hiring | HYDRA CAP <=20 MT Hiring |
| 207 | HYDRA (CAP-14T) Hiring | HYDRA (CAP-14T) Hiring |
| 208 | TRACTOR/TROLLEY Hiring | TRACTOR/TROLLEY Hiring |
| 209 | Truck (Full) Hiring | Truck (Full) Hiring |
| 210 | ST 125FT BOOM LIFT Hiring | ST 125FT BOOM LIFT Hiring |
| 211 | ST 60FT BOOM LIFT Hiring | ST 60FT BOOM LIFT Hiring |
| 212 | MATL (<>) SHIFTING | MATL (<>) SHIFTING |
| 213 | SCAFFOLDING (<>) FIXING | SCAFFOLDING (<>) FIXING |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender