Tender For Reconstruction Of Damaged Compound Wall At D.G.Pudur, Erode B.A
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Oct 2026
9 days left
EMD
7330
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Reconstruction Of Damaged Compound Wall At D.G.Pudur, Erode B.A
BOQ
| Sl. No. | Item Description |
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 3 | a) In cement mortar |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 5 | a) All kinds of soil. |
| 6 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. |
| 7 | a) Ordinary rock |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 10 | a) 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 11 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : |
| 12 | a) 1:2:4 (1 cement: 2 M.sand : 4 graded stone aggregate 20 mm nominal size) |
| 13 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 14 | a)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 16 | a) Foundations, footings, bases of columns, etc. for mass concrete |
| 17 | b) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 18 | C) Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 19 | d) Columns, Pillars, Piers, Abutments, Posts and Struts |
| 20 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 21 | a) Hot rolled deformed bars |
| 22 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). |
| 23 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 24 | a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 25 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 26 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approvedmanufacturer in foundation and plinth in: |
| 27 | a)Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 28 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level |
| 29 | a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 30 | Credit for unserviceable steel reinforcement recovered from the demolished roof top tower RCC foundation etc all directed by the E-in-c |
| 31 | Cutting and removing the tree roots penetrated in side the compound wall areas from the neary by trees and disposal of the roots etc, all as directed by the E-in-c Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 24, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysOct 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender