Tender For Kursai Pukhru Barota Road Km 0/00 To 1/800 (Sh:- Construction Of Retaining Wall At Rd 1/241 To 1/256 And At Rd 1/274 To 1/292 And Protection Retaining Wall At Km 0/700 To 0/705 And Laying Cement Concrete Work At Km 1/372 To 1/382 And Barot
Tender Overview
Project Description
Tender for Kursai Pukhru Barota Road Km 0/00 To 1/800 (Sh:- Construction Of Retaining Wall At Rd 1/241 To 1/256 And At Rd 1/274 To 1/292 And Protection Retaining Wall At Km 0/700 To 0/705 And Laying Cement Concrete Work At Km 1/372 To 1/382 And Barota To Kudi Ghat Cement Concrete Work At Km 0/700 To 0/829.50).(Under Sdrf/Ndrf ).
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and MORD technical specification 2014 clause 305 ( Three zero five ) and as per direction of the Engineer-in-Charge .The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 2 | Cutting in earth work for road formation in all heights and depths in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary oil ,soft rocks,hard rocks,chiseling/wedging out of rock (where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines,graded with cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the M.O.R.D. technical specification clause 1603.1 and sorting out useful material and stacking the same in all leads and lifts in acquired width of the road and transportation of unuseful material for filling in road,ways,camber, embankments for grade improvements and disposal of all in useful materials to required width of the road or approved dumping sites by Engineer-in-charge through all modes of transportation including head load or animals transport or mechanical means,along with its leveling fine dressing using machineries,materials, tools equipments and safety measures and incidentals necessary to complete the work by mechanicalmeans and/or labour if required.Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per direction of Engineer-in-charge including carriage of material with in all leads and lifts. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 3 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:4:8 (One Cement is to four coarse sand is to eight crushed graded stone aggregate) 40 mm (forty millimetre) nominal size as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 4 | Back filling with granular material behind retaining walls, abutment wing wall and return wall complete as per drawings and MORD technical specification 2014 Clause 1204.3.8 and as per direction of Engineer-in-Charge including carriage of materials with with in all leads and lifts and other incidental. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 5 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm (one hundered milimeter ) dia PVC pipe of working pressure not less than 4kg/sqcm ( four kilogram per square centimeter) extending through the full width of the structures with slope of 1(V) (one vertical) :20(H) ( twenty horizontal) towards drawing face complete as per drawings and MORD technical specification 2014 Clauses 614, 709, 1204.3.7 . The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 6 | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 7 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement is to one point five coarse sand is to three graded crushed stone aggregate 20 mm (twenty milimetre) nominal size.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. |
| 8 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : (C.C. 1:3:6)(One cement is to three Coarse sand is to six crushed graded stone aggregate) 20 mm (twenty millimeter) nominal size including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.