Power Government Departments Closing in 17 days TDR #57693726

Tender For Biennial Maintenance Contract For Routine / Preventive / Breakdown Maintenance Of Boiler Pressure Parts, Coal & Oil Burner Assemblies, Wind Box, Hp Valves, Safety Valves, Fans, Aphs, Esp, Ducting & Fuel Oil Pumps Etc. For 2X600 Mw Unit-I &

Issued by Government Departments · Hisar, Haryana
Tender Value
3.37 Crore
Estimated cost
Bid Submission
23 Oct 2026
17 days left
EMD
7.97 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Hisar → Haryana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Biennial Maintenance Contract For Routine / Preventive / Breakdown Maintenance Of Boiler Pressure Parts, Coal & Oil Burner Assemblies, Wind Box, Hp Valves, Safety Valves, Fans, Aphs, Esp, Ducting & Fuel Oil Pumps Etc. For 2X600 Mw Unit-I & Ii At Rgtpp, Khedar, Hisar

BOQ

Name of Work:- BIENNIAL MAINTENANCE CONTRACT FOR ROUTINE / PREVENTIVE / BREAKDOWN MAINTENANCE OF BOILER PRESSURE PARTS, COAL & OIL BURNER ASSEMBLIES, WIND BOX, HP VALVES, SAFETY VALVES, FANS, APHS, ESP, DUCTING & FUEL OIL PUMPS ETC. FOR 2X600 MW UNIT-I & II AT RGTPP, KHEDAR, HISAR
Sl. No. Item Description
1For Scope of work under Part-A, for First Year :Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (i.e. work of Boiler Pressure Parts, Boiler Rotary Parts & Common Activities as Per Scope of Work)
2For Scope of work under Part-B, for First Year (from 1.02 to 1.85)
3Mobilization & attending the boiler tube leakage / preventive maintenance of pressure parts tubes in boiler but excluding Platen Super Heater area, Divisional Super Heater area, Platen Re Heater area, Finish Reheater area, steam cooled SH spacer tubes and liquid cooled positioning tubes. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage. (i) Minor scaffolding (i.e. up to using 5 nos. jalies for height of 1 mtr from base will be in scope of contractor & no separate payment will be made. (ii) Attending tube leakages in radiant re-heater area from outside of furnace shall also be covered under this head.
4Mobilization & attending the boiler tube leakage / preventive maintenance of Platen Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor. (iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made.
5Mobilization & attending the boiler tube leakage / preventive maintenance of Final Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor. (iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made. (v) Stress relieving, Pre & Post Heat treatment of joints as per procedure shall be in the scope of contractor.
6Erection of boiler maintenance platform/ sky-climber/jhoola for attending tube leakages in Divisional SH panels, Platen SH panels, Panel RH tubes (if attended from inside the first pass of furnace), SH steam cooled spacer tubes and liquid cooled positioning tubes involving up-to 10 nos. HP joints. 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints.
7Attending tube leakages in pent house portions, connecting tubes of all pendant SH and RH panels, radiant roof tubes, any other miscellaneous pipeline as well as removal and re-fixing of hand hole caps of headers
8Radiography of up-to 10 nos. HP joints. Engagement of a qualified Level-II NDT expert who could interpret RT films correctly along with RT source/camera of appropriate strength shall also be in the scope of the contractor. NDT expert shall submit a detailed report clearly mentioning whether the welding joint is satisfactory or not.
9Carrying out Radiography of HP joints in addition to 10 nos. joints mentioned at Sr. No. 6 above.
10Carrying out HP joint in addition to 10 nos. joints mentioned at Sr. No. 1, 2, 3, 4 & 5 to above in boiler. It includes cutting, welding, fit-up, grinding and welding of one no. joint of tube of all sizes and any thickness of boiler in area covered under Sr. No. 1, 2, 3, 4 & 5 above.
11Metal build up on worn out boiler tubes in boiler including Platen Super Heater area, Divisional Super Heater area, Platen Reheater area, Finish Reheater area, Panel/wall Reheater area, SH spacer tubes and liquid cooled positioning tubes half round surface by HP welder up-to 100 MM length.
12Attending leakage by welding of HP Joints of outside the boiler including replacement of pipe up to 1 Mtr. Length / valve / bends by cutting, welding, grinding and fit-up work for each joint.NOTE: In case HP welder capable of doing the above work does not reach RGTPP within 4 Hrs. of verbal/written/ SMS instructions by EIC (i.e. AEE/AE Concerned) or higher authority & hence work could not be started or welder engaged is found incompetent then penalty of Rs.5000/- will be imposed on the contractor which will be in addition to other penalty clauses as applicable. Also work will be got carried out through outside agency which will cost approx minimum Rs.20000/- per day at the risk & cost of the contractor and hence deducted from his running bill/s. It is pertinent to mention that above value of risk & cost will be over & above the penalty amount.
13Stress relieving activity along with installation of pre-heating coils and post-heating coils as well. The supply and application of thermal insulation mattress must also be included in the scope of contractor.
14Replacements of gasket of man hole of boiler drum including minor repair/grinding, if any
15Repair, rectification & re-fixing of cassette baffles.
16Providing & Re-positioning of twisted shields/ Replacement of shielding plates/shrouds plated on various boiler tubes.
17Casting refractory on boiler.
18Providing skin casing with 3mm plate
19Providing buck stay pin / repairing of buck stay.
20Providing of scaffolding & platform in the inside/outside boiler area (height X length) with width of 2 nos. Jail (i.e. 2-3 feet approx)
21Replacement of steam tracing line.
22Internal water washing of goose neck area (i.e. rear arc area) and 2nd pass of boiler.
23External water washing of boiler from 42 Meters Approx to bottom ring header elevation
24External water washing of boiler from pent house to zero meter including 2nd pass
25Checking of Burner Tilt Mechanism and rectification thereof at one corner.a) Disconnections of all reach rods from burner tilt mechanism as per requirement.b) Dismantling of burner tilt mechanism including removal of drive shaft after disconnecting from burner tilt power cylinder. Removal of burner tilt power cylinder from its position if required by C & I mtc. And refitting of same & replacement of burner tilt shear pin/ other pins, if found damaged.c) Lubrication of pins, shafts, studs of reach rod etc. As per requirement.d) Repair/ replacement of reach rod turn buckle, pivot pins, pins of tilting mechanism as per requirement.e) Assembly & refitting of burner tilt mechanism.f) Connections of all reach rods to burner tilt mechanism and zero setting of all nozzle tips.g) Tilting trail of burner tilt. Ensure free operation of burner tilt upto +/ - 30 degree connecting with power cylinder and trail operation power cylinder.
26Rectification of jammed secondary air damper from inside wind box.a) Cleaning and removing of all the ash accumulated in SADC partition plate in all the four corners and cleaning shafts and bush with diesel/ restoline etc. As per requirement.b) Repair/ replacement of damper flaps, bush, glands, links and partition plate of damper compartment as per requirement.c) Making damper operation free & smooth.d) Providing damper movement indicators over the shaft as per requirement.e) Repairing secondary air damper lever & its connection with damper power cylinder if required.f) Removal of bush of drive end & non drive end along with bush housing in case of jamming of SADC if required & refitting of same after repairing or replacement by new.g) Repairing and replacement of stopper.NOTE: Scaffolding if required for above work will be paid extra as per unit rate under item No. 11.
27Rectification of jammed secondary air damper from outside wind box.
28Repairing of scanner guide assembly including its removal from panel, repair/replacement of worn out parts if required and checking its movement with tilting mechanism.
29Servicing / overhauling of oil gun assembly with Igniter including replacement of worn out parts if required.
30Opening/closing of oil gun/coal nozzle/air chamber for inspection
31Removal, refitting & servicing of burner isolating gate with replacement of gaskets etc. at furnace end. NOTE: All the associated works such as removal/ locking of fuel inlet elbow, removal of Victaulic coupling etc. Required for completion of above job is included in scope of work.In case work is not started within reasonable time after verbal/ written/ SMS instructions by EIC (i.e. AEE/AE concerned) or higher authority or manpower engaged is found incompetent then penalty of Rs. 5000/- per day will be imposed on the contractor which will be in addition to other penalty clauses as applicable. Also work will be got carried out through outside agency which will cost approx minimum Rs. 30,000/- plus taxes extra as applicable per day at the risk and cost of other agency of the contractor and hence deducted from his running bills. It is pertinent to mention that above value of risk will be over and above the penalty amount.
32Repairing of boiler seal trough dipping plate which includes lifting/lowering/bolting etc as per requirement.
33Repair/replacement of tie rod of any hanger in boiler area.
34Replacement of ss wire mesh in seal trough area
35Complete servicing of wall soot blower.
36Repairing/replacement of Chain of long retractable soot blower
37Complete servicing / Repairing of long retractable soot blower including Gear Box including lance, other spares replacement etc if required
38Repair, Servicing, replacement of damaged spares / gaskets & attending steam leakages of valves/ NRVs of size 600 mm & above
39Sealing of Bottom Ash Hopper from Z panel
40Refurbishment and modification of coal compartment assemblies of boiler
41Installation of coal compartment assemblies of boiler
42Replacement of complete rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of ID Fans, Model No. SAF 38.5-22.4-1
43Replacement of complete double stage rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of PA Fans, Model No. PAF 20.2-12.5-2
44Replacement of complete rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of FD Fans, Model No. FAF 25-13.3-1
45Dismantlement, Servicing and preparation of ID Fan rotor Assembly Model No. SAF 38.5-22.4-1
46Dismantlement, Servicing and preparation of double stage PA Fan rotor Assembly Model No. PAF 20.2-12.5-2
47Dismantlement, Servicing and preparation of FD Fan rotor Assembly Model No. Model No. FAF 25-13.3-1
48Decoupling & coupling after alignment of ID / FD / PA Fan with motor
49Replacement of blade pitch control system ( i.e. Hydraulic Cylinder) of ID/FD/PA Fan
50Opening & Re-fixing of top casing of ID/FD/PA Fan including removal/ replacement of fabric expansion joint of casing.
51Attending oil leakage of bearing housing of ID/FD/PA Fans excluding top cover opening.
52Attending oil leakage of blade pitch control system of ID Fans including removing/ replacement of cover plate
53Replacement of complete set of blades of ID fans excluding top cover opening.
54Replacement of complete set of blades of both impellers of PA fans excluding top cover opening.
55Replacement of lube oil pump or coupling of lube oil pump, including opening & re-fixing of Lube oil pump of ID / FD / PA Fan
56Removal of impeller of scanner air fan from motor shaft and its refitting.
57Attending cooler tube leakage of lube oil system of ID/FD/PA fans.
58Cleaning of oil coolers.
59Replacement of oil after thorough cleaning of oil chamber from inside.
60Servicing of ID fan blade bearing/rotor/impeller assembly
61Replacement of DE/NDE bearings of ID/PA fan motors
62Repairing of steam/ air lance of soot blower by welding
63Cleaning of lube oil coolers.
64Replacement of mechanical seal of lub oil pump of guide/ support bearing including dismantlement & assembly of pump.
65Water washing of APHs through washing system or Fire Fighting line.
66APH rotor level setting/alignment
67Coupling & decoupling of rapping mechanism gear boxes of ESP.
68Checking of ESP field
69Checking of rapping mechanism of one complete pass
70Removal of snapped emitting electrodes.
71Erection of new emitting electrodes
72Repairing/ replacement of shock bar, Repairing of guide bar
73Replacement of shaft insulator
74Replacement of plain fixed / free bearing
75Re-positioning / removal / replacement of deflection plate.
76Repairing of worn/ damaged manhole
77Cleaning of shaft insulators.
78Attending leakages of ash by welding from inside of hopper including cleaning of surface of hopper for pointing out leakage, formation of temporary platforms if required etc. Attending leakage from the Economizer hopper shall also be covered under this activity
79Fabrication, repair & fitment of Flap assembly of Mechanical Ash Level Indicators of ESP hoppers.
80Patch work on ducts up to 300mm x 300mm
81Repairing of duct with welding (welding in running meter)
82Repair / replacement of fabric expansion bellow in air/ flue gas duct or in any other area irrespective of width
83Replacement of cartridge of HFO / LDO pressurizing pump including replacement of mechanical seal, bearings, if required, including alignment and normalization.
84Replacement of mechanical seals of HFO/ LDO unloading pump/ transfer/ pressurizing pump
85Erection of temporary platform in the different auxiliary's area (Height X Length) up to width of 02 jali's. in addition to the work covered in Part-A.
86Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above. A gang of 1 no. Tech. & 1 no. Helper for attending any misc. Job for duration of 4 hours.
87Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above. A gang of 1 no. Rigger. & 1 no. Helper for attending any misc. Job for duration of 4 hours.
88Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above:A gang of 1 no. Painter & 1 no. Helper for doing any misc. Painting job for duration of 4 hours
89Fabrication & erection of Misc. steel structure
90Removal/re-fixing of any dislocated / bulged skin casing up to 01 Sqr. Meter in boiler.
91Deputation of 01 no. Class-II vibration analyst/service engineer for balancing/alignment of ID/FD/PA/seal air/scanner air fans. This includes transportation charge of service engineer.
92For Scope of work under Part-A, for Second Year :Lump Sum Monthly Charges for both Units-I & II for Main Scope of work under Part-A (i.e. work of Boiler Pressure Parts, Boiler Rotary Parts & Common Activities as Per Scope of Work)
93For Scope of work under Part-B, for Second Year (from 2.02 to 2.85)
94Mobilization & attending the boiler tube leakage / preventive maintenance of pressure parts tubes in boiler but excluding Platen Super Heater area, Divisional Super Heater area, Platen Re Heater area, Finish Reheater area, steam cooled SH spacer tubes and liquid cooled positioning tubes. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage. (i) Minor scaffolding (i.e. up to using 5 nos. jalies for height of 1 mtr from base will be in scope of contractor & no separate payment will be made. (ii) Attending tube leakages in radiant re-heater area from outside of furnace shall also be covered under this head.
95Mobilization & attending the boiler tube leakage / preventive maintenance of Platen Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor. (iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made.
96Mobilization & attending the boiler tube leakage / preventive maintenance of Final Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. joints. Note:- (i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. (ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor. (iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made. (v) Stress relieving, Pre & Post Heat treatment of joints as per procedure shall be in the scope of contractor.
97Erection of boiler maintenance platform/ sky-climber/jhoola for attending tube leakages in Divisional SH panels, Platen SH panels, Panel RH tubes (if attended from inside the first pass of furnace), SH steam cooled spacer tubes and liquid cooled positioning tubes involving up-to 10 nos. HP joints. 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints.
98Attending tube leakages in pent house portions, connecting tubes of all pendant SH and RH panels, radiant roof tubes, any other miscellaneous pipeline as well as removal and re-fixing of hand hole caps of headers
99Radiography of up-to 10 nos. HP joints. Engagement of a qualified Level-II NDT expert who could interpret RT films correctly along with RT source/camera of appropriate strength shall also be in the scope of the contractor. NDT expert shall submit a detailed report clearly mentioning whether the welding joint is satisfactory or not.
100Carrying out Radiography of HP joints in addition to 10 nos. joints mentioned at Sr. No. 6 above.
101Carrying out HP joint in addition to 10 nos. joints mentioned at Sr. No. 1, 2, 3, 4 & 5 to above in boiler. It includes cutting, welding, fit-up, grinding and welding of one no. joint of tube of all sizes and any thickness of boiler in area covered under Sr. No. 1, 2, 3, 4 & 5 above.
102Metal build up on worn out boiler tubes in boiler including Platen Super Heater area, Divisional Super Heater area, Platen Reheater area, Finish Reheater area, Panel/wall Reheater area, SH spacer tubes and liquid cooled positioning tubes half round surface by HP welder up-to 100 MM length.
103Attending leakage by welding of HP Joints of outside the boiler including replacement of pipe up to 1 Mtr. Length / valve / bends by cutting, welding, grinding and fit-up work for each joint.NOTE: In case HP welder capable of doing the above work does not reach RGTPP within 4 Hrs. of verbal/written/ SMS instructions by EIC (i.e. AEE/AE Concerned) or higher authority & hence work could not be started or welder engaged is found incompetent then penalty of Rs.5000/- will be imposed on the contractor which will be in addition to other penalty clauses as applicable. Also work will be got carried out through outside agency which will cost approx minimum Rs.20000/- per day at the risk & cost of the contractor and hence deducted from his running bill/s. It is pertinent to mention that above value of risk & cost will be over & above the penalty amount.
104Stress relieving activity along with installation of pre-heating coils and post-heating coils as well. The supply and application of thermal insulation mattress must also be included in the scope of contractor.
105Replacements of gasket of man hole of boiler drum including minor repair/grinding, if any
106Repair, rectification & re-fixing of cassette baffles.
107Providing & Re-positioning of twisted shields/ Replacement of shielding plates/shrouds plated on various boiler tubes.
108Casting refractory on boiler.
109Providing skin casing with 3mm plate
110Providing buck stay pin / repairing of buck stay.
111Providing of scaffolding & platform in the inside/outside boiler area (height X length) with width of 2 nos. Jail (i.e. 2-3 feet approx)
112Replacement of steam tracing line.
113Internal water washing of goose neck area (i.e. rear arc area) and 2nd pass of boiler.
114External water washing of boiler from 42 Meters Approx to bottom ring header elevation
115External water washing of boiler from pent house to zero meter including 2nd pass
116Checking of Burner Tilt Mechanism and rectification thereof at one corner.a) Disconnections of all reach rods from burner tilt mechanism as per requirement.b) Dismantling of burner tilt mechanism including removal of drive shaft after disconnecting from burner tilt power cylinder. Removal of burner tilt power cylinder from its position if required by C & I mtc. And refitting of same & replacement of burner tilt shear pin/ other pins, if found damaged.c) Lubrication of pins, shafts, studs of reach rod etc. As per requirement.d) Repair/ replacement of reach rod turn buckle, pivot pins, pins of tilting mechanism as per requirement.e) Assembly & refitting of burner tilt mechanism.f) Connections of all reach rods to burner tilt mechanism and zero setting of all nozzle tips.g) Tilting trail of burner tilt. Ensure free operation of burner tilt upto +/ - 30 degree connecting with power cylinder and trail operation power cylinder.
117Rectification of jammed secondary air damper from inside wind box.a) Cleaning and removing of all the ash accumulated in SADC partition plate in all the four corners and cleaning shafts and bush with diesel/ restoline etc. As per requirement.b) Repair/ replacement of damper flaps, bush, glands, links and partition plate of damper compartment as per requirement.c) Making damper operation free & smooth.d) Providing damper movement indicators over the shaft as per requirement.e) Repairing secondary air damper lever & its connection with damper power cylinder if required.f) Removal of bush of drive end & non drive end along with bush housing in case of jamming of SADC if required & refitting of same after repairing or replacement by new.g) Repairing and replacement of stopper.NOTE: Scaffolding if required for above work will be paid extra as per unit rate under item No. 11.
118Rectification of jammed secondary air damper from outside wind box.
119Repairing of scanner guide assembly including its removal from panel, repair/replacement of worn out parts if required and checking its movement with tilting mechanism.
120Servicing / overhauling of oil gun assembly with Igniter including replacement of worn out parts if required.
121Opening/closing of oil gun/coal nozzle/air chamber for inspection
122Removal, refitting & servicing of burner isolating gate with replacement of gaskets etc. at furnace end. NOTE: All the associated works such as removal/ locking of fuel inlet elbow, removal of Victaulic coupling etc. Required for completion of above job is included in scope of work.In case work is not started within reasonable time after verbal/ written/ SMS instructions by EIC (i.e. AEE/AE concerned) or higher authority or manpower engaged is found incompetent then penalty of Rs. 5000/- per day will be imposed on the contractor which will be in addition to other penalty clauses as applicable. Also work will be got carried out through outside agency which will cost approx minimum Rs. 30,000/- plus taxes extra as applicable per day at the risk and cost of other agency of the contractor and hence deducted from his running bills. It is pertinent to mention that above value of risk will be over and above the penalty amount.
123Repairing of boiler seal trough dipping plate which includes lifting/lowering/bolting etc as per requirement.
124Repair/replacement of tie rod of any hanger in boiler area.
125Replacement of ss wire mesh in seal trough area
126Complete servicing of wall soot blower.
127Repairing/replacement of Chain of long retractable soot blower
128Complete servicing / Repairing of long retractable soot blower including Gear Box including lance, other spares replacement etc if required
129Repair, Servicing, replacement of damaged spares / gaskets & attending steam leakages of valves/ NRVs of size 600 mm & above
130Sealing of Bottom Ash Hopper from Z panel
131Refurbishment and modification of coal compartment assemblies of boiler
132Installation of coal compartment assemblies of boiler
133Replacement of complete rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of ID Fans, Model No. SAF 38.5-22.4-1
134Replacement of complete double stage rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of PA Fans, Model No. PAF 20.2-12.5-2
135Replacement of complete rotor assembly (i.e. Main Bearing Housing with Shaft, Impeller and Hydraulic Cylinder) of FD Fans, Model No. FAF 25-13.3-1
136Dismantlement, Servicing and preparation of ID Fan rotor Assembly Model No. SAF 38.5-22.4-1
137Dismantlement, Servicing and preparation of double stage PA Fan rotor Assembly Model No. PAF 20.2-12.5-2
138Dismantlement, Servicing and preparation of FD Fan rotor Assembly Model No. Model No. FAF 25-13.3-1
139Decoupling & coupling after alignment of ID / FD / PA Fan with motor
140Replacement of blade pitch control system ( i.e. Hydraulic Cylinder) of ID/FD/PA Fan
141Opening & Re-fixing of top casing of ID/FD/PA Fan including removal/ replacement of fabric expansion joint of casing.
142Attending oil leakage of bearing housing of ID/FD/PA Fans excluding top cover opening.
143Attending oil leakage of blade pitch control system of ID Fans including removing/ replacement of cover plate
144Replacement of complete set of blades of ID fans excluding top cover opening.
145Replacement of complete set of blades of both impellers of PA fans excluding top cover opening.
146Replacement of lube oil pump or coupling of lube oil pump, including opening & re-fixing of Lube oil pump of ID / FD / PA Fan
147Removal of impeller of scanner air fan from motor shaft and its refitting.
148Attending cooler tube leakage of lube oil system of ID/FD/PA fans.
149Cleaning of oil coolers.
150Replacement of oil after thorough cleaning of oil chamber from inside.
151Servicing of ID fan blade bearing/rotor/impeller assembly
152Replacement of DE/NDE bearings of ID/PA fan motors
153Repairing of steam/ air lance of soot blower by welding
154Cleaning of lube oil coolers.
155Replacement of mechanical seal of lub oil pump of guide/ support bearing including dismantlement & assembly of pump.
156Water washing of APHs through washing system or Fire Fighting line.
157APH rotor level setting/alignment
158Coupling & decoupling of rapping mechanism gear boxes of ESP.
159Checking of ESP field
160Checking of rapping mechanism of one complete pass
161Removal of snapped emitting electrodes.
162Erection of new emitting electrodes
163Repairing/ replacement of shock bar, Repairing of guide bar
164Replacement of shaft insulator
165Replacement of plain fixed / free bearing
166Re-positioning / removal / replacement of deflection plate.
167Repairing of worn/ damaged manhole
168Cleaning of shaft insulators.
169Attending leakages of ash by welding from inside of hopper including cleaning of surface of hopper for pointing out leakage, formation of temporary platforms if required etc. Attending leakage from the Economizer hopper shall also be covered under this activity.
170Fabrication, repair & fitment of Flap assembly of Mechanical Ash Level Indicators of ESP hoppers.
171Patch work on ducts up to 300mm x 300mm
172Repairing of duct with welding (welding in running meter)
173Repair / replacement of fabric expansion bellow in air/ flue gas duct or in any other area irrespective of width
174Replacement of cartridge of HFO / LDO pressurizing pump including replacement of mechanical seal, bearings, if required, including alignment and normalization.
175Replacement of mechanical seals of HFO/ LDO unloading pump/ transfer/ pressurizing pump
176Erection of temporary platform in the different auxiliary's area (Height X Length) up to width of 02 jali's. in addition to the work covered in Part-A.
177Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above. A gang of 1 no. Tech. & 1 no. Helper for attending any misc. Job for duration of 4 hours.
178Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above. A gang of 1 no. Rigger. & 1 no. Helper for attending any misc. Job for duration of 4 hours.
179Deployment of below mentioned manpower as per requirement for the miscellaneous jobs which are not covered above:A gang of 1 no. Painter & 1 no. Helper for doing any misc. Painting job for duration of 4 hours
180Fabrication & erection of Misc. steel structure
181Removal/re-fixing of any dislocated / bulged skin casing up to 01 Sqr. Meter in boiler.
182Deputation of 01 no. Class-II vibration analyst/service engineer for balancing/alignment of ID/FD/PA/seal air/scanner air fans. This includes transportation charge of service engineer. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57693726
AUTHORITY Government Departments
TENDER VALUE 3.37 Crore
LAST DATE 23-10-2026
Authority
Authority Name Haryana Power Generation Corporation Limited
Work Description Tender for Biennial Maintenance Contract For Routine / Preventive / Breakdown Maintenance Of Boiler Pressure Parts, Coal & Oil Burner Assemblies, Wind Box, Hp Valves, Safety Valves, Fans, Aphs, Esp, Ducting & Fuel Oil Pumps Etc. For 2X600 Mw Unit-I & Ii At Rgtpp, Khedar, Hisar
Basic Detail
Tender No 2026A7E010E0 6C16 49EE BBB6 FA7BF60E82D2712PGC
Bidding Type Tender
Location
City Hisar
State Haryana
Key Dates
Publish Date 25 Sep 2026
Submission Date 23 Oct 2026
Open Date 27 Oct 2026
Finance
Tender Value 3.37 Crore
Tender Fee 1180
EMD 7.97 Lakhs
Exemption Available
Document List
BOQ_629933.xls
d81751bf-7584-4f5b-b97c-8856989e450b.html
Tendernotice_1 (20).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 25, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Oct 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_629933.xls

html

d81751bf-7584-4f5b-b97c-8856989e450b.html

pdf

Tendernotice_1 (20).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders