Tender For Procurement Of Services Regarding Operationalization Of The Biogas Plant Under The Rkvy Project Development And Popularization Of Eco-Friendly Technology For Paddy Straw Management For The Department Of Rbee, Coae&T, Ccshau Hisar
Tender Overview
Project Description
Tender for Procurement Of Services Regarding Operationalization Of The Biogas Plant Under The Rkvy Project Development And Popularization Of Eco-Friendly Technology For Paddy Straw Management For The Department Of Rbee, Coae&T, Ccshau Hisar
BOQ
| Sl. No. | Item Description |
| 1 | DIGESTER SYSTEM |
| 2 | DIGESTER DOUBLE MEMBRANE REMOVAL AND REINSTALLATION (MAKE: SATTLER) |
| 3 | SUPPORTING NET AND STRIP REPAIR |
| 4 | INSPECTION OF INTERNAL PARTS |
| 5 | DIGESTER LATERAL ENTRY AGITATOR SERVICING AND OIL TOP-UP (MAKE: STERISAL) |
| 6 | SUBMERSIBLE AGITATOR SERVICING AND GREASING (MAKE: STERISAL) |
| 7 | VALVE INSPECTION |
| 8 | SENSOR CALIBRATION (BASIC RATE OF ALL SENSORS REQUIRED MAY BE FILLED ACCORDINGLY) |
| 9 | ELECTRICAL INSULATION TESTING AND TERMINATION CHECK |
| 10 | CONTROL PANEL INSPECTION AND FUNCTIONAL CHECKING (MAKE: BIOGEST Gmbh, AUSTRIA) |
| 11 | GAS LEAKAGE RECTIFICATION |
| 12 | PIPELINE FLUSHING |
| 13 | WORKING AREA CLEANING |
| 14 | DIGESTER SYSTEM COMMISSIONING |
| 15 | ANY OTHER WORK RELATED TO DIGESTER SYSTEM |
| 16 | UTILITIES AND AUXILIARY SYSTEMS |
| 17 | SUBMERSIBLE SLUDGE PUMP SERVICING AND GREASING (DELAVAL) |
| 18 | SUBMERSIBLE AGITATOR SERVICING AND GREASING (DELAVAL) |
| 19 | SOLID LIQUID SEPARATOR SERVICING AND GREASING (DELAVAL) |
| 20 | MOISTURE REMOVAL SYSTEM (CHILLER) SERVICING (GASTECHNIK HIMMEL GmbH) |
| 21 | MOISTURE REMOVAL HEAT EXCHANGER INSPECTION AND SERVICE (GASTECHNIK HIMMEL GmbH) |
| 22 | MOISUTRE TRAP INSPECTION AND CLEANING (GASTECHNIC HIMMEL GmbH) |
| 23 | BIOGAS BLOWER INSPECTION AND SERVICING (GASTECHNIK HIMMEL GmbH) |
| 24 | EMERGENCY FLARE INSPECTION AND SERVICING (GASTECHNIK HIMMEL GmbH) |
| 25 | PRESSURE/SUCTION RELIEF VALVE SERVICING (GASTECHNIK HIMMEL GmbH) |
| 26 | ANY OTHER WHICH IS NECESSARY TO RUN THE DIGESTER AND CHP |
| 27 | MAN CHP COMMISSIONING AND ELECTRICAL WORKS |
| 28 | MAN EC836 LE302 ENGINE INSPECTION |
| 29 | BARRING AND CRANK ROTATION CHECK |
| 30 | SPARK PLUG INSPECTION |
| 31 | IGNITION SYSTEM CHECKING |
| 32 | TURBOCHARGER INSPECTION |
| 33 | EXHAUST LINE INSPECTION |
| 34 | TEMPERATURE CONTROL VERIFICATION |
| 35 | EXHAUST HEAT RECOVERY CHECKING |
| 36 | GAS TRAIN INSPECTION |
| 37 | PUMP CHECKING |
| 38 | JACKET WATER CIRCUIT TESTING |
| 39 | ALTERNATOR TESTING (STAMFORD UCI274F2) |
| 40 | AUTOMATIC VOLTAGE REGULATOR CHECKING |
| 41 | PROTECTION RELAY TESTING |
| 42 | MAIN CIRCUIT CONTROL CHECKING |
| 43 | SENSOR CALIBRATION |
| 44 | PLC/HMI CHECKING |
| 45 | CABLE MEGGER TESTING |
| 46 | EARTHING VERIFICATION |
| 47 | SYNCHRONIZATION PANEL CHECKING |
| 48 | CABLE LUG TIGHTENING AND TERMINATION CHECKING |
| 49 | CONTROL PANEL CLEANING AND TESTING (MAKE: IET GmbH) |
| 50 | ENGINE OIL FLUSHING AND REPLACEMENT |
| 51 | COOLANT CIRCULATION AND RADIATOR CHECKING |
| 52 | PLATE HEAT EXCHANGER INSPECTION AND SERVICING (TRANTER GLD-013PR) |
| 53 | TRIAL RUN AND NO-LOAD TESTING |
| 54 | LOAD TESTING |
| 55 | BIOGAS TUNING |
| 56 | EMISSION CHECKING |
| 57 | EFFICIENCY VERIFICATION |
| 58 | ANY OTHER CHECK NECESSARY TO FUNCTIONALIZE AND RUN THE COMPLETE CHP UNIT |
| 59 | INCLUSIONS (PRICES SHOULD BE INCLUDED IN THE SERVICES MENTIONED ABOVE) |
| 60 | Crane/hydra required to perform the services as given above |
| 61 | Manpower required for the services and feeding the digester with 300 ton cattle dung for initial commissioniong |
| 62 | Batteries |
| 63 | Spark plugs (spare) for MAN EC836 LE302 engine (Complete Set) |
| 64 | Flexible hoses |
| 65 | Any other consumable required except mentioned in the subsequent point 5 |
| 66 | EXCLUSIONS (NEED BASED, WILL BE PROVIDED BY THE UNIVERSITY) |
| 67 | Civil repair/maintenance |
| 68 | Engine spare replacement |
| 69 | Any equipment or part replacement/reapir |
| 70 | Power supply for site |
| 71 | Water supply at site |
| 72 | Cattle dung/paddy straw |
| 73 | Servo transformer 200 kVA servicing |
| 74 | Lube oil specific for MAN EC836 LE302 engine |
| 75 | Coolant for MAN EC836 LE302 engine |
| 76 | Filters for MAN EC836 LE302 engine |
| 77 | Gaskets for MAN EC836 LE302 engine |
| 78 | Sensors |
| 79 | COMPLETE OPERATION OF BIOGAS PLANT AND CHP PLANT INCLUDING SUPPLY OF MANPOWER FOR MINIMUM 6 MONTHS' PERIOD AND DEMONSTRATION TRAINING TO THE ATTACHED UNIVERSITY OFFICIALS AND STAFF (PRICE SHOULD BE QUOTED IN THE TENDER SEPARATELY) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.