Bids Are invited for Annual Maintenance Service-Air Conditioner - Annual Comprehensive Maintenance And Repair Of The Following Rating Window Acs, Split Acs, Cassette Type Acs, Including Attending Preventive & Breakdown Maintenance, Providing Necessar
Tender Overview
Project Description
Bids Are invited for Annual Maintenance Service-Air Conditioner - Annual Comprehensive Maintenance And Repair Of The Following Rating Window Acs, Split Acs, Cassette Type Acs, Including Attending Preventive & Breakdown Maintenance, Providing Necessary Spares, Consumables, Etc., Providing Reparing/Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components Like Relay & Switches, Motor, Capacitor Etc. With Original Components I/C Repair & Maintenance Of Stabiliser Etc. Complete As Required , Annual Comprehensive Maintenance And Repair Of The Following Rating Inverter Split Acs, Including Attending Preventive & Breakdown Maintenance, Providing Necessary Spares, Consumables, Etc., Providing Reparing/Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components Like Relay & Switches, Motor, Capacitor Etc. With Original Components I/C Repair & Maintenance Of Stabiliser Etc. Complete As Required , Annual Comprehensive Maintenance And Repair Of The Following Rating Water Cooler, ( 40/80 Ltrs & 60/120 Ltrs ) Including Attending Preventive Maintenance Activity & Breakdown Maintenance, Providing Repairing/ Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components With Original Components I/C Repair & Maintenance Of Voltage Stabilizer Etc. Complete As Required Etc. , Annual Comprehensive Maintenance And Repair Of The Reverse Osmosis(Ro) System Of Acqua Fresh Make Having Capacity 50 Lph I/C Supply & Replacement Of All Spares & Part Pump & Membranes Complete As Required , Annual Comprehensive Maintenance Contract Of Reverse Osmosis System Model-Zero B Commercial 25 Lph I/C Supply & Replacement Of All Spares & Part Pump & Membranes Complete As Required , Deployment Of 1 No. Ac Technician (Skilled) (Epf, Esi & Bonus On Reimbursement Basis ) For Day-To-Day Repair/Maintenance Of The Split Acs, Cassette Type Acs, Water Cooler, Ro Water Purifier, Etc. & All Equipment Under This Contract, Including Attending Preventive & Breakdown Maintenance In General Shift On All Days But Excluding Weekly Off And National Holidays As Required. , Supply And Laying Of Copper Refrigerant Piping With Insulation (Nitrile Rubber With Silver Foil), Comprising Suction And Discharge Pipes, For Air-Conditioning Units Of 1.5 Tr/2.0 Tr Capacity, Including Provision Of Suitably Sized Interconnecting Cables Between The Indoor And Outdoor Units, Complete In All Respects As Required. , Supply And Laying Of Pvc Piping (25 Mm) Etc. As Required For Ac Drain Piping Complete As Required. , Installation , Testing And Commissioning Of Capacity 1.5/2.0 Tr All Type Make High Wall Split/Cassette Air Conditioner Unit Including Fixing Of Existing Refrigerant Pipe With Insulation & Suitable Flexible Copper Conductor Cable Between Evaporator And Condenser Units And Topping Up Suitable Refrigerant Gas Etc Complete As Required .
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Annual Comprehensive Maintenance and repair of the following rating Window ACs, Split ACs, Cassette type ACs, including attending preventive & breakdown maintenance, providing necessary spares, consumables, etc., providing reparing/replacement of defective compressor by same company compressor & replacement of other defective components like relay & switches, motor, capacitor etc. with original components i/c repair & maintenance of stabiliser etc. complete as required | Annual Comprehensive Maintenance and repair of the following rating Window ACs, Split ACs, Cassette type ACs, including attending preventive & breakdown maintenance, providing necessary spares, consumables, etc., providing reparing/replacement of defective compressor by same company compressor & replacement of other defective components like relay & switches, motor, capacitor etc. with original components i/c repair & maintenance of stabiliser etc. complete as required |
| 2 | Annual Comprehensive Maintenance and repair of the following rating INVERTER Split ACs, including attending preventive & breakdown maintenance, providing necessary spares, consumables, etc., providing reparing/replacement of defective compressor by same company compressor & replacement of other defective components like relay & switches, motor, capacitor etc. with original components i/c repair & maintenance of stabiliser etc. complete as required | Annual Comprehensive Maintenance and repair of the following rating INVERTER Split ACs, including attending preventive & breakdown maintenance, providing necessary spares, consumables, etc., providing reparing/replacement of defective compressor by same company compressor & replacement of other defective components like relay & switches, motor, capacitor etc. with original components i/c repair & maintenance of stabiliser etc. complete as required |
| 3 | Annual Comprehensive Maintenance and repair of the following rating WATER COOLER, ( 40/80 Ltrs & 60/120 Ltrs ) including attending preventive maintenance activity & breakdown maintenance, providing repairing/ replacement of defective compressor by same company compressor & replacement of other defective components with original components i/c repair & maintenance of voltage stabilizer etc. complete as required etc. | Annual Comprehensive Maintenance and repair of the following rating WATER COOLER, ( 40/80 Ltrs & 60/120 Ltrs ) including attending preventive maintenance activity & breakdown maintenance, providing repairing/ replacement of defective compressor by same company compressor & replacement of other defective components with original components i/c repair & maintenance of voltage stabilizer etc. complete as required etc. |
| 4 | Annual Comprehensive Maintenance and repair of the Reverse Osmosis(RO) System of Acqua fresh make having capacity 50 LPH i/c supply & replacement of all spares & part pump & membranes complete as required | Annual Comprehensive Maintenance and repair of the Reverse Osmosis(RO) System of Acqua fresh make having capacity 50 LPH i/c supply & replacement of all spares & part pump & membranes complete as required |
| 5 | Annual Comprehensive maintenance Contract of Reverse Osmosis System Model-Zero B commercial 25 LPH i/c supply & replacement of all spares & part pump & membranes complete as required | Annual Comprehensive maintenance Contract of Reverse Osmosis System Model-Zero B commercial 25 LPH i/c supply & replacement of all spares & part pump & membranes complete as required |
| 6 | Deployment of 1 No. AC Technician (Skilled) (EPF, ESI & Bonus on Reimbursement basis ) for day-to-day repair/maintenance of the Split ACs, Cassette type ACs, water cooler, RO Water purifier, etc. & all equipment under this contract, including attending preventive & breakdown maintenance in general shift on all days but excluding weekly off and national holidays as required. | Deployment of 1 No. AC Technician (Skilled) (EPF, ESI & Bonus on Reimbursement basis ) for day-to-day repair/maintenance of the Split ACs, Cassette type ACs, water cooler, RO Water purifier, etc. & all equipment under this contract, including attending preventive & breakdown maintenance in general shift on all days but excluding weekly off and national holidays as required. |
| 7 | Supply and laying of copper refrigerant piping with insulation (Nitrile rubber with silver foil), comprising suction and discharge pipes, for air-conditioning units of 1.5 TR/2.0 TR capacity, including provision of suitably sized interconnecting cables between the indoor and outdoor units, complete in all respects as required. | Supply and laying of copper refrigerant piping with insulation (Nitrile rubber with silver foil), comprising suction and discharge pipes, for air-conditioning units of 1.5 TR/2.0 TR capacity, including provision of suitably sized interconnecting cables between the indoor and outdoor units, complete in all respects as required. |
| 8 | Supply and Laying of PVC piping (25 mm) etc. as required for AC drain piping complete as required. | Supply and Laying of PVC piping (25 mm) etc. as required for AC drain piping complete as required. |
| 9 | Installation , testing and commissioning of capacity 1.5/2.0 TR all type make high wall split/cassette air conditioner unit including fixing of existing refrigerant pipe with insulation & suitable flexible copper conductor cable between evaporator and condenser units and topping up suitable refrigerant gas etc complete as required . | Installation , testing and commissioning of capacity 1.5/2.0 TR all type make high wall split/cassette air conditioner unit including fixing of existing refrigerant pipe with insulation & suitable flexible copper conductor cable between evaporator and condenser units and topping up suitable refrigerant gas etc complete as required . |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender