Supply Of ARRANGEMENTS OF STIFFNER IN TRAIN18 COAC => Limited
Tender Overview
Project Description
Supply Of arrangements of stiffner in train18 coac , arrangement of stiffner, as per drawing: col ii of emu/m/3ph/hl 7-6-006, packin g instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it s hould be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: both (1) & (2) to be followed as stated above. for other ite ms except underframes: only (2) need to followed. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permit ed: max 8 lacs ] ] , arrangements of stiffner in train18 coaches, as per drawing: train18/mc/ac 7 -6-005, packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be follo wed. (2) it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: both (1) & (2) to be followed as stated above. for other i tems except underframes: only (2) need to followed. [ warranty period: 30 months after th e date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | ARRANGEMENT OF STIFFNER, as per Drawing: COL II OF EMU/M/3PH/HL 7-6-006, Packin g Instruction: PI042 VER 3.0 (1) DRAWING NO. ICF/J&T/MISC-2487 ALT. `B? TO BE FOLLOWED. (2) IT S HOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE, IF ANY, SHALL BE AT THE COST OF SUPPLIER. FOR UNDERFRAMES: BOTH (1) & (2) TO BE FOLLOWED AS STATED ABOVE. FOR OTHER ITE MS EXCEPT UNDERFRAMES: ONLY (2) NEED TO FOLLOWED. [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permit ed: Max 8 lacs ] ] |
| 2 | ARRANGEMENTS OF STIFFNER IN TRAIN18 COACHES, as per Drawing: TRAIN18/MC/AC 7 -6-005, Packing Instruction: PI042 VER 3.0 (1) DRAWING NO. ICF/J&T/MISC-2487 ALT. `B? TO BE FOLLO WED. (2) IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE, IF ANY, SHALL BE AT THE COST OF SUPPLIER. FOR UNDERFRAMES: BOTH (1) & (2) TO BE FOLLOWED AS STATED ABOVE. FOR OTHER I TEMS EXCEPT UNDERFRAMES: ONLY (2) NEED TO FOLLOWED. [ Warranty Period: 30 Months after th e date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender