Tender For Infrastructure Development Of Industrial Estate In Tripura/ Sh: Electrical Power System Development Dewanpassa Industrial Estate,Kumarghat Industrial Estate And Dharmanagar Industrial Estate (Adb Project/Package :13)
Tender Overview
Project Description
Tender for Infrastructure Development Of Industrial Estate In Tripura/ Sh: Electrical Power System Development Dewanpassa Industrial Estate,Kumarghat Industrial Estate And Dharmanagar Industrial Estate (Adb Project/Package :13)
BOQ
| Sl. No. | Item Description |
| 1 | LOCATION:Dewanpasa Industrial Estate |
| 2 | Additional Installation of 5 mVA 33/11 KV Power Transformer and Construction of new 33 KV and 11 KV Bay. LAND & CIVIL WORK of related items as below |
| 3 | MS SIGN BOARD, BAY INDICATION BOARD & RYB PHASE INDICATION BOARD |
| 4 | 5 MVA Transformer BaseConcrete: 1:1.5:3 Ratio-5.634 cmt, concrete :1:5:8 Ratio-7.545 cmt., M.S. Flat/rod-324.87 kg and Base filling by Kopra in case of Black cotton soil 3.1*3.1*0.5m= 4.8 cmt]Base filling by Kopra -1.92 cmt., concreting, curing and back filling of pits. All complete works |
| 5 | Yard Equipment Base including CT, PT, Isolator, LA etc |
| 6 | CONCRETING (1:3:6) OF VCB STRUCTURES 3.5 cmt per VCB |
| 7 | LED Yard Lighting 80 Watt Flood Light |
| 8 | PROVIDING & FIXING PERFORATED CABLE TRAY 300 mm WIDE & 2 mm THICK FIXED ON 45X45X5 mm m.S. ANGLE STAND GROUTED IN C.C 1:24 |
| 9 | PROVIDING AND FIXING EARTH PIT OF BRICK mASSONERY 0.6 X 0.6 m INNER SIZE WITH FLAG STONE COVER FOR WATERING SYSTEm FOR 18 No EARTH PITS |
| 10 | Costruction of retaining wall 1.5 m high as per site requirement |
| 11 | 1000 LITER P/F SINTEX OVERHEAD TANK & GI PIPE (WITH LENGTH OF 125 m) FITTING FOR WATER SUPPLY INCLUDING WATER TAP(17 No) NEAR TRANSFORmER NEUTRAL EARTHING |
| 12 | Supply & installation(PROVIDING AND FIXING 5HP SUBmERSIBLE PUmP ) |
| 13 | Supply & Installation of VRLA Battery Set 110 Volt, 240 AH (Trickle & Boost Charging) |
| 14 | Substation Battery charger 240 AH, 110 Volt |
| 15 | Supply & Installation of 110 V DC Distribution Board |
| 16 | Supply, installation, testing & commissioning of wall mounted A.C. Sub distribution board (ACDB-2), comprising of 200 A mCCB I/C, PIL, 200/5A CT (3 Nos.) A+AS, V+VS, Outgoing- 32A TPN mCB 2 Nos., 63A TPN mCB 2 Nos, 16A SPN mCB 9 Nos. |
| 17 | Supply of Safety items,Furnitures & Testing tools as given below |
| 18 | Furniture for control room Table 600mmx 900mm- 1No, Chair- 3No, Computer table 1No (Godrej or equivalent ) |
| 19 | Fire extinguisher ABC Type 6 Kg |
| 20 | Sand buckets 2 Nos. on each earth stand with caNopy |
| 21 | First Aid Boxes |
| 22 | 33 KV Hand Gloves |
| 23 | 11 KV Hand Gloves |
| 24 | Safety Shoes |
| 25 | Safety Helmet |
| 26 | Earth Discharge Rod -33 KV |
| 27 | Rubber Mat for 33 KV 6 x 4 feet (thickness as per IS 15652) |
| 28 | Insulation Tester (megger make) 5000 V |
| 29 | Earth Tester |
| 30 | mili Amp AC Clamp meter (make motwani) |
| 31 | Digital multimeter |
| 32 | Laptop for reading in Control & Protection Panel room |
| 33 | DELL 12Generation Intel @ Core i5-1235U Window 11 Home single language intel@ Iris Xe Graphics RAm:-16GB,8GBx2,DDR4,2666mT/s,HARD Disk :-512GB,m.2,PCIe,NVme.SSD.Display size:- 39.6 C.m.Full HD (1920 x 1080),Weight :1.65 Kg |
| 34 | Supply & Installation of DP Structure for 33 KV Incoming with all accessories & support items as below. |
| 35 | H- BEAm 11 mETER 152 X 152 mm 37.1 Kg/mETER = 408.1 Kg |
| 36 | DC.CROSS ARmS 8`CENTRE TO CENTRE 100X50X6 mm CHANNEL (each weight-26.32 Kg) (ONE SET FOR FEEDER AND ONE SET FOR ISOLATOR/mE) |
| 37 | Clamp suitable for 152 X 152 mm., 37.1 Kg/m H-Beam ( each weight 3.2 Kg) (1 Set= 2Nos.) |
| 38 | HORIZONATAL & CROSS BRACING 8' CENTRE (wt of each X-BRACING-64.29 Kg |
| 39 | Back Clamp suitable for H-Beam (mS Flat 65x8 mm)- each weight 1.92 Kg |
| 40 | 33 KV Polymer composite 70 KN Disc Insulator |
| 41 | 33 KV Strain hardware (T&C type) fittings |
| 42 | 33 KV 900 mm CD Polymer Composite pin insulator |
| 43 | Stay set 20 mm. complete without Stay wire (Hot Dipped galvanized) |
| 44 | Clamp suitable for 152 X 152 mm., 37.1 Kg/m H-Beam ( each weight 3.2 Kg)( 1 Set=2Nos.) |
| 45 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 46 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 47 | CONCRETING (1:3:6) OF H-BEAm @ 0.7 CmT.PER POLE INCLUDING muffing |
| 48 | CONCRETING (1:3:6) OF STAY @ 0.3 CmT. PER STAY (20mm) |
| 49 | EARTHING COIL OF 115 TURNS OF 50 mm.DIA AND 2.5 m LEAD OF 4.0 mm G.I WIRE |
| 50 | Supply & installation of 33KV & 11KV STRUCTURES AND BUS-BAR ARRANGEmENTS with all accessories & support items as below |
| 51 | H- BEAm 9 mETER 152 X 152 mm 37.1 Kg/mETER = 333.9 Kg FOR 33KV GANTRY STRUCTURE |
| 52 | H- BEAm 9 mETER 152 X 152 mm 37.1 Kg/mETER = 333.9 Kg FOR 11KV GANTRY STRUCTURE |
| 53 | H- BEAm 7 mETER 152 X 152 mm 37.1 Kg/mETER = 259.7 Kg FOR 5' CENTER JUmPER SUPPORT FOR 33 & 11KV SIDE |
| 54 | D.C. CHANNEL 4.8 m CENTRE 100X50X6mm FOR 33KV BUS BAR (each weight-99.90 Kg)( 1 Set=2Nos.) |
| 55 | D.C. CHANNEL 4.8 m CENTRE 100X50X6mm FOR 11KV BUS BAR (each weight-99.90 Kg)( 1 Set=2Nos.) |
| 56 | D.C.cross- arm of 100 X 50 X 6 mm. ISmC channel suitable for 5' centre (65.09 Kg each)( 1 Set=2Nos.) |
| 57 | Clamp suitable for 152 X 152 mm., 37.1 Kg/m H-Beam ( each weight 3.2 Kg)( 1 Set=2Nos.) |
| 58 | STRAIN PLATE (IS MS FLAT 65X8X250MM) 0.65 Kg each |
| 59 | ACSR PANTHER CONDUCTOR 0.20 SQ. INCH (200 SQ.mm AL.EQ.) |
| 60 | 33 KV 900 mm CD Polymer Composite pin insulator |
| 61 | 11 KV, 5KN PIN COmPOSITE POLYmER INSULATOR |
| 62 | 33 KV Polymer composite 70 KN Disc Insulator |
| 63 | 33 KV COmPOSITE POLYmER STRAIN SET WITH HARD WARE SUITABLE FOR PANTHER CONDUCTOR (FOR 33KV SIDE) |
| 64 | 11 KV , 45 KN 16mm FRP with 25mm per KV Creepage DISC POLYmER LONG ROD TYPE T&C INSULATOR (FOR 11KV SIDE) |
| 65 | 33 KV COmPOSITE POLYmER STRAIN SET WITH HARD WARE SUITABLE FOR PANTHER CONDUCTOR (FOR 11KV SIDE) |
| 66 | CONCRETING (1:3:6) OF H-BEAm @ 0.70CmT.PER POLE INCLUDING muffing |
| 67 | H- BEAm 11 mETER 152 X 152 mm 37.1 Kg/mETER = 408.1 Kg |
| 68 | DC.CROSS ARmS 8` CENTRE TO CENTRE 100X50X6 mm CHANNEL (each weight-56.32 Kg)( 1 Set=2Nos.) |
| 69 | 11 KV STRAIN HARDWARE (T&C TYPE) FITTINGS |
| 70 | HORIZONATAL & CROSS BRACING 8' CENTRE (wt of each X-BRACING-64.29 Kg ( 1 Set=2Nos.) |
| 71 | Back Clamp suitable for H-Beam (mS Flat 65x8 mm)- each weight 1.92 Kg( 1 Set=2Nos.) |
| 72 | Stay set 20 mm. complete without Stay wire (Hot Dipped galvanized) |
| 73 | Clamp suitable for 152 X 152 mm., 37.1 Kg/m H-Beam ( each weight 3.2 Kg)( 1 Set=2Nos.) |
| 74 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 75 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 76 | CONCRETING (1:3:6) OF H-BEAm @ 0.70 CmT.PER POLE INCLUDING muffing |
| 77 | CONCRETING (1:3:6) OF STAY @ 0.3 CmT. PER STAY (16mm) |
| 78 | EARTHING COIL OF 115 TURNS OF 50 mm.DIA AND 2.5 m LEAD OF 4.0 mm G.I WIRE |
| 79 | Supply & installation of 33 KV EQUIPmENTS with all accessories & support items as below |
| 80 | 33/11 KV Power transformer , OFTC Type 5000 KVA Loss (4 KW + 23 KW) |
| 81 | 33 KV VCB, outdoor PORCELAIN CLAD TYPE WITH COmPLETE STRUCTURE AND ACCESSORIES |
| 82 | 33KV CT Outdoor as below |
| 83 | 33 KV CTs.(out door oil filled type) 200-100/1-1 Amps Single Phase, Dual Core |
| 84 | 33 KV Control & Relay Panel for Transformer with IEC 61850 compliant differential relay, numerical type with static TVm |
| 85 | 33KV Post Insulator (Polymeric) |
| 86 | Supply & Installation of 11 KV Cables & EQUIPmENTS with all accessories & support items as below |
| 87 | 11 KV 630 Amp, 25kA Indoor VCB Panel Complete with CT PT, Relays etc. all accessories |
| 88 | Erection, testing & commissioning of 11 KV, 1250Amps, 25 KA for 3 seconds, 350 mVA rupturing capacity Indoor Vaccum Circuit Breaker, complete with Control & Relay Pannel Simplex type with 3Phase pannel topmounted PT of ratio: 11000 /110Volt,110 Volt DC actuated electrical closing mechanism and internal wiring, Numerical as well as electromechanical protection by 2-Over current & 1-earth fault combined ( micom or other reputed make) digital & electromechanical relays forintegrated protection,! Noelectromechanical AREVAmaster Trip Relay, auxiliary relays as required,! NoL&T / SECURE make \\"Tri- Vector\\" meter(SCADA compatible) 3- Ammeter, 1 -Voltmeter, 1 -C.T operated static KW meter, with panel bus mounted C.T andintegral earthing facility including inernal arc testedpanel conforming to relevant ISS/IEC as reqd.includingstandard indication facilities as per requirement detailed in bid document. |
| 89 | Erection, testing &commissioning of 11 KV, 800 Amps continues rated current, 350 mVA rupturing capacity Indoor Vaccum Circuit Breaker) for outgoing feeder) , complete with 1 set of CT of ratio 200/1- 1, Control & Relay Pannel Simplex type with 110 Volt DC actuated electrical closing/tripping mechanism and internal wiring, 2-Over current & 1-earth fault combined micom digital relay,1 Noelectromechanical AREVA master Trip Relay, auxiliary relays as required,! NoL&T / SECURE make \\"Tri- Vector\\" meter(SCADA compatible), 3- Ammeter, 1 -Voltmeter, 1 -C.T operated static KW meter, with panel bus mounted C.T andintegral earthing facility including inernal arc testedpanel Conforming to relevant ISS/IEC as reqd.includingstandard indication facilities as per requirement detailed in bid document. |
| 90 | Supply & laying of 11KV UG Cable 185 sq.mm XLPE |
| 91 | Outdoor heat shrinkable cable end jointing kit with lugs for 11 kV grade XLPE cable for 3 core 185 sq mm(1 Set=3Nos.) |
| 92 | Indoor heat shrinkable cable end jointing kit with lugs for 11 kV grade XLPE cable for 3 core 185 sq mm(1 Set=3Nos.) |
| 93 | Supply & Installation of 33KV SWITCHYARD EQUIPmENTS as below |
| 94 | 33 KV ISOLATOR 1200 A.(1 Set=3Nos.) |
| 95 | 11 KV ISOLATOR 800 Amp (1 Set=3Nos.) |
| 96 | 33 KV LA POLYmER TYPE GAPLESS /mETAL OXIDE SUBSTATION TYPE(1 Set=3 Nos.) |
| 97 | 11 KV LA POLYmER TYPE GAPLESS /mETAL OXIDE SUBSTATION TYPE(1 Set=3 Nos.) |
| 98 | 33 KV / 0.11 kv SINGLE PHASE PTS OIL ImmERSED, outdoor with marshling box |
| 99 | For substation metering- 3 phase 4 wire 3x63.5 volts lb=5 amps Imax = 10 amp, HT trivector meter class of accuracy 0.5s, DLmS Compliant category A meters along with GSm (GPRS compatible ) modems, |
| 100 | Supply & Erection of Galvanized steel material for gantry structures of Switchyard as per approved design & bill of materials. |
| 101 | COPPER CONTROL CABLE 12 CORE, 2.5 SQmm PVC UNARmOURED |
| 102 | COPPER CONTROL CABLE 8 CORE, 2.5 SQmm PVC UNARmORED |
| 103 | COPPER CONTROL CABLE 4 CORE, 2.5 SQmm PVC UNARmOURED |
| 104 | COPPER CONTROL CABLE 2 CORE, 2.5 SQmm PVC UNARmOURED |
| 105 | T CLAmP ALUmINUm FOR BUS BAR PANTHER RUN PANTHER TAP |
| 106 | BImETALLIC CLAmPS FOR POWER TRANSFORmER 11KV SIDE |
| 107 | Supply of OTHER MISCELLANEOUS ITEMS |
| 108 | PVC CABLE 2 CORE ARmOURED 2.5 SQmm ALUmINIUm CONDUCTOR |
| 109 | PVC CABLE 4 CORE ARmOURED 16 SQmm ALUmINIUm CONDUCTOR |
| 110 | m S BOLT WITH NUT 16X250 mm |
| 111 | m S BOLT WITH NUT 16X200 mm |
| 112 | m S BOLT WITH NUT 16X165 mm |
| 113 | m S BOLT WITH NUT 16X140 mm |
| 114 | m S BOLT WITH NUT 16X90 mm |
| 115 | m S BOLT WITH NUT 16X40 mm |
| 116 | RED-OXIDE PAINT |
| 117 | ALUmINUm PAINT |
| 118 | DANGER BOARD ENAmELED 33 KV AND 11 KV |
| 119 | Supply and Laying of UG 11 KV XLPE 185 sqmm Cable from TFDC feeder to IE with supply & installation of all support items as below |
| 120 | Supply of 3 phase 3 core 11 kv XLPE 185 sqmm Al power cable |
| 121 | Laying of 3 phase 3 core 11 kv XLPE 185 sqmm Al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 122 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 400 mm od |
| 123 | Supply and erection of p80. Pn6, 400 mm od hdpe pipe |
| 124 | Coiling of excess 185 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand / Duct |
| 125 | Outdoor cable termination with heat shrinkable jointing kit 185 sqmm (1 Set=3 Nos.) |
| 126 | Route marker complete with danger sign |
| 127 | 11 kv danger plate |
| 128 | MS nuts & bolts assorted size |
| 129 | Bi metallic lugs 185 sqmm |
| 130 | Ht kiosks complete |
| 131 | 8 swg gi wire |
| 132 | Route survey of existing line and proposed network |
| 133 | Replacement of Existing 11 KV OH line by ACSR Racoon Covered Conductor with supply, Erection & installation of all accessories & support items with dismentalling cost up to 0.5 Km |
| 134 | Replacement of Full Galvanized Tubular Pole 11 m Long with supply,erection & installation. |
| 135 | Dismentalling of Full Galvanized Tubular Pole 11 m Long |
| 136 | Replacement of 11 KV 'V' cross-arms 75x75x6 mm mS Angle -each weight 24.60 Kg with supply,erection & installation |
| 137 | Dismentalling of V cross arm 100x50x50x6 mm mS channe |
| 138 | Replacement of Back Clamp (mS Flat 65x8 mm) - each wt 1.92 Kg |
| 139 | 11 KV Top clamps 75x75x6 mm Angle ( each weight 3.58 Kg) |
| 140 | Dismentalling of 11KV single Disc insulator set along with necessary fitting |
| 141 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 m lead of 4.0 mm. G.I wire) |
| 142 | Replacement of 11 KV Pin Insulator(Polymer) composite 10KN FRP Dia 33.5mm with supply & erection |
| 143 | Dismentalling of Pin insulator along with Pin |
| 144 | ACSR Racoon Covered conductor (70 sq.mm. Al.Eq.), 11 KV |
| 145 | Dismentalling of ACSR Racoon Covered conductor |
| 146 | Jointing Sleeves suitable for 70 Sq.mm. conductor |
| 147 | Replacement of Stay set 20 mm. painted complete with turn buckles with supply & erection |
| 148 | Dismentalling of Stay set from the earth complete with 19mm x 1800mm long stay rod,anchor platof size 300 x 300 x 8mm,thimble,turn buckle,7/3.15 mm dia G.I. standard stay wire and stain insulator etc.And making complete in all respect. |
| 149 | Replacement of Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) with supply & erection |
| 150 | Dismantalling of mS angle Cross-Arm bracket of 2/3/4 wire upto 1100m long 50x50x6mm/65/65/6mm with supply & erection |
| 151 | Clamp (3.04 Kg each) |
| 152 | Stay Insulators 90X65mm |
| 153 | Concreting of pole @ 0.9 cmt. per pole including muffing |
| 154 | Red oxide paint |
| 155 | Aluminium paint |
| 156 | Anti-climbing devices (barbed wire 2.24 mm dia. (14 swg) (3.5 kg. Wire per pole) |
| 157 | Danger Boards Enamalled Type 11KV |
| 158 | Binding wire and tape |
| 159 | m.S.Nuts and Bolts |
| 160 | Route Survey of existing line and proposed network |
| 161 | Dismantling of LT lines with all accessories up to 0.8 Km |
| 162 | Dismantling for LT line of 7.0m,8m & 9 m length of steel Tubular Pole at any kind of soil ,including excavation of earth,refilling the pit with soil upto the ground level |
| 163 | Dismantalling of Conductor ACSR 6/1/2.59 mm dia WEASEL including Coiling etc. complete as required. |
| 164 | Street light Dismantalling with all accessories up to 0.3 Km |
| 165 | Transport Charges from site to TSECL Store |
| 166 | Supply & installation for 11 KV OH new Line from New 33 KV S/s inside Dewanpasa IE laid by ACSR Racoon Covered Conductor on 11 m mS Poles up to 2.2 Km |
| 167 | Line supports mS Tubular Pole 11 m Long |
| 168 | 11 KV 'V' cross-arms 75x75x6 mm mS Angle -each weight 24.60 Kg |
| 169 | Back Clamp (mS Flat 65x8 mm) - each wt 1.92 Kg |
| 170 | 11 KV Top Brackets 75x75x6 mm Angle 0.3 m Long ( each weight 3.58 Kg) |
| 171 | 11 KV Single Pole Cut Point Channal (100x50x6mm mS Channel) 2.2 m Long |
| 172 | 11 KV Side cross arm (100x50x6mm mS Channel) |
| 173 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 m lead of 4.0 mm. G.I wire) |
| 174 | 11 KV Pin Insulator(Polymer) composite 10KN FRP Dia 33.5mm |
| 175 | ACSR Racoon Covered conductor (70 sq.mm. Al.Eq.), 11 KV |
| 176 | Jointing Sleeves suitable for 70 Sq.mm. conductor |
| 177 | Stay set 20 mm. painted complete with turn buckles |
| 178 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 179 | Clamp (3.04 Kg each) |
| 180 | Stay Insulators 90X65mm |
| 181 | Concreting of pole @ 0.9 cmt. per pole including muffing |
| 182 | Red oxide paint |
| 183 | Aluminium paint |
| 184 | Anti-climbing devices (barbed wire 2.24 mm dia. (14 swg) (3.5 kg. Wire per pole) |
| 185 | Danger Boards Enamalled Type 11KV |
| 186 | m.S.Nuts and Bolts |
| 187 | Route Survey of existing line and proposed network |
| 188 | Supply and Installation of 500 KVA, 11/0.4 KV DTR |
| 189 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 500 KVA Distribution Transformer (As per IS 1180, latest amendment) |
| 190 | Full GI Tubular Pole 11 m Long |
| 191 | D.o.cross-arm of 100 x50x 6 mm. x 2.8 m Long |
| 192 | 11 kv (45kn) 16mm frp with 25mm per kv creepage disc insulator polymer |
| 193 | 11kv strain hardware fitting |
| 194 | 11 kv d.o. fuse & lightening arrestor mounting channel (75x 40 x 6 mm.) |
| 195 | Back clamp for h-beam size-480 mm ,wt-1.92 Kg using 65x8 ms flat |
| 196 | 11 kv d.o. fuse unit (Porcelin)(1 Set=3Nos.) |
| 197 | 9 kv gapless type LA ( 5ka) polymer for dtr |
| 198 | Supply & CIVIL work for Transformer Base (R.C.C.) as per TSECL approved drawings |
| 199 | Clamp for size- ,wt-3.2 Kg using 65x8 ms flat(1Set=2Nos.) |
| 200 | Stay set 20 mm. painted complete with turn buckles |
| 201 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 202 | Concreting of pole/ h-beam @ 0.70 cmt. Per pole with muffing (1:3:6) |
| 203 | Acsr conductor rabbit for jumper |
| 204 | Danger boards enamalled type 11kv |
| 205 | Anti climbing devices (barbed wire 2.24 mm dia (14 swg) (3.5 Kg Wire per pole) |
| 206 | Red oxide paint |
| 207 | Aluminium paint |
| 208 | m.s.nuts and bolts |
| 209 | Distribution box mounting channel (75x40x6 mm.) |
| 210 | L.t. distribution box suitable for 500 kva transformer (without tpn switches) with mccb on incoming and pf units on outgoing side made of smc |
| 211 | LT 300 sq.mm.,3.5 core xlpe armoured aluminium conductor cable |
| 212 | LT Al Lugs 300 sqmm |
| 213 | 11 kv a.b. switch 400 Amp(1Set=3Nos.) |
| 214 | DTR S/s fencing (Total 37 feet running meter max.) of 6' height with chain link fencing on MS Angle(50x50x6mm) support 7 nos. 7' height. |
| 215 | Earthing with G.l. earth pipe 4.5 m long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr |
| 216 | Supply and Installation of 315 KVA, 11/0.4 KV DTR |
| 217 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 315 KVA Distribution Transformer (As per IS 1180 latest amendment) |
| 218 | Full GI Tubular Pole 11 m Long |
| 219 | DC.CROSS ARmS 8` CENTRE TO CENTRE 100X50X6 mm CHANNEL (each weight-56.32 Kg)( 1 Set=2Nos.) |
| 220 | 11 kv (45kn) 16mm frp with 25mm per kv creepage disc insulator polymer |
| 221 | 11kv strain hard ware fitting |
| 222 | 11 kv d.o. fuse & lightening arrestor mounting channel (75x 40 x 6 mm.) |
| 223 | Back clamp for h-beam size-480 mm ,wt-1.92 Kg using 65x8 ms flat |
| 224 | 11 kv d.o. fuse unit |
| 225 | 9 kv gapless type LA ( 5ka) polymer for dtr |
| 226 | Supply & CIVIL work for Transformer Base as per TSECL approved drawing. |
| 227 | Stay set 20 mm. painted complete with turn buckles |
| 228 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 229 | Concreting of h-beam @ 0.70 cmt. Per pole with muffing (1:3:6) |
| 230 | Concreting of stay @ 0.2 cmt. Per stay (1:3:6) |
| 231 | Acsr conductor rabbit for jumper |
| 232 | Danger boards enamalled type 11kv |
| 233 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 234 | Bi-metallic clamps suitable for 12mm dia stud LT side |
| 235 | Anti climbing devices (barbed wire 2.24 mm dia (14 swg) (3.5 Kg Wire per pole) |
| 236 | Red oxide paint |
| 237 | Aluminium paint |
| 238 | m.s.nuts and bolts |
| 239 | Distribution box mounting channel (75x40x6 mm.) |
| 240 | L.t. distribution box suitable for 315 kva transformer (without tpn switches) with mccb on incoming and pf units on outgoing side made of smc |
| 241 | LT 300 sq.mm.,3.5 core xlpe armoured aluminium conductor cable |
| 242 | LT Al Lugs 300 sqmm |
| 243 | 11 kV A.B switch (1 Set=3Nos.), 400A with complete fitting. |
| 244 | DTR S/s fencing (Total 37 feet running meter max.) of 6' height with chain link fencing on MS Angle(50x50x6mm) support 7 nos. 7' height. |
| 245 | Earthing with G.l. earth pipe 4.5 m long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr |
| 246 | Supply and Installation of 200 KVA, 11/0.4 KV DTR with all accessories & support items. |
| 247 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 200 KVA Distribution Transformer (As per IS 1180 latest amendment) |
| 248 | Full GI Tubular Pole 11 m Long |
| 249 | D.c.cross-arm of 100 x50x 6 mm. 2.8 m long(1Set=2Nos.) |
| 250 | 11 kv (45kn) 16mm frp with 25mm per kv creepage disc insulator polymer |
| 251 | 11kv strain hard ware fitting |
| 252 | 11 kv d.o. fuse & lightening arrestor mounting channel (75x 40 x 6 mm.) |
| 253 | Back clamp for h-beam size-480 mm ,wt-1.92 Kg using 65x8 ms flat |
| 254 | 11 kv d.o. fuse unit |
| 255 | 9 kv gapless type LA ( 5ka) polymer for dtr |
| 256 | Transformer Base as per TSECL approved drawings & Engineer Incharge instructions (R.C.C.) |
| 257 | Clamp for h-beam size- ,wt-3.2 Kg using 65x8 ms flat(1Set=2Nos.) |
| 258 | Stay set 20 mm. painted complete with turn buckles |
| 259 | Stay wire 7/4.0 mm. (8.5 Kgstay wire per stay set ) |
| 260 | Stone block/pre cast block for base pedding 450x450x75mm |
| 261 | Concreting of h-beam @ 0.70 cmt. Per pole with muffing (1:3:6) |
| 262 | Concreting of stay @ 0.2 cmt. Per stay (1:3:6) |
| 263 | Acsr conductor rabbit for jumper |
| 264 | Danger boards enamalled type 11kv |
| 265 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 266 | Bi-metallic clamps suitable for 12mm dia stud LT side |
| 267 | Anti climbing devices (barbed wire 2.24 mm dia (14 swg) (3.5 Kg Wire per pole) |
| 268 | Red oxide paint |
| 269 | Aluminium paint |
| 270 | m.s.nuts and bolts |
| 271 | Distribution box mounting channel (75x40x6 mm.) |
| 272 | L.t. distribution box suitable for 200 kva transformer (without tpn switches) with mccb on incoming and pf units on outgoing side made of smc |
| 273 | LT 185 sq.mm.,3.5 core xlpe armoured aluminium conductor cable |
| 274 | LT Al Lugs 185 sqmm |
| 275 | 11 kV A.B switch (1 Set=3Nos.), 400A with complete fitting. |
| 276 | DTR S/s fencing (Total 37 feet running meter max.) of 6' height with chain link fencing on MS Angle(50x50x6mm) support 7 nos. 7' height. |
| 277 | Earthing with G.l. earth pipe 4.5 m long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr |
| 278 | Supply & installation for Construction of New LT Feeder with ABC 150 sq mm Cable with all accessories & support items up to 3.00 Km. |
| 279 | Full GI Tubular Pole 11 m Long |
| 280 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 m lead of 4.0 mm. G.I wire) |
| 281 | Painted Stay set 20 mm. complete with turn buckles |
| 282 | Stay wire 7/4.0 mm. (10 Kgstay wire per stay set ) |
| 283 | Clamp suitable ( each weight 3.2 Kg ms flat 65x8mm) |
| 284 | Concreting of Pole @0.9 cmt per pole (including muffing) |
| 285 | Red oxide paint |
| 286 | Aluminium paint |
| 287 | Anti-climbing devices (barbed wire 2.24 mm dia. (14 swg) (3.5 kg. Wire per pole) |
| 288 | Binding wire and tape |
| 289 | m.S.Nuts and Bolts |
| 290 | A.B Cable tension clamps (Galvanized) |
| 291 | Suspension Clamp with attachment |
| 292 | Piercing connector Type-I for single phase/three phase(main 70-150 sq.mm. tape- of 50-95 sq.mm) |
| 293 | Piercing connector Type-II (main 70-150 sq.mm. tape- of 50-95 sq.mm) |
| 294 | 1100 Volts Grade Aerial bunched XLPE Cable 3 X 150 + 1 X 35 + 1 X 95 sq.mm. (insulated nuetral massenger) |
| 295 | Feeder pillars complete |
| 296 | Supply and Installation of Street Light LED Lamps on Street Light Poles |
| 297 | Clamps / Arm Brackets / fixing arrangement for Street Light fittings suitable for LED Fixture |
| 298 | Supply and Installation LED Lamp Fitting, for Street Light 100 Watt, with polycarbonate glass cover with IP66 enclosure and complete fittings and connection from Pole Junction Box |
| 299 | 3 Core 1.5 sq mm unarmoured Cable for Street Light connection |
| 300 | Junction Box |
| 301 | Supply and Laying of Street Light Cable 4 Core 16 sq mm armoured underground inside 32 mm mDPE Pipe pipe PN6 |
| 302 | 32 mm HDPE Pipe pipe PN6 for laying of cable |
| 303 | Supply and fixing of Post Top LED lamp in main gate with GI Pipe and loop box LED Lamp 120 Watt |
| 304 | Supply & installation of Timer Switch |
| 305 | Excavation of soil 30cmX75cm for cable laying |
| 306 | Route Survey |
| 307 | Supply and Installation of High mast Lighting with all accessories & support items |
| 308 | Supply of 20 m high mast shaft suitable for 39 m/sec wind speed, with all accessories including foundation bolts, aviation light, feeder pillar & suitable as per illumination design Wiring material,power cables between panel and mast, mCB in base compartment are Not included & shall be in the scope of erection. |
| 309 | Supply of Non-integral floodlight luminaries LED 250 Watts, 8 No in each pole HPI/T Plus lamps and its control gear boxes. |
| 310 | Provision of GI pipe earthing for High mast with 2.5 m long 40 mm dia GI Pipe including connection to High mast earth terminal with 25 x 3 mm GI flats with all materials and labour. (2Nos per mast required) |
| 311 | Supply & installation of Power and Control Panel Outdoor and Environment Protection |
| 312 | Construction of shallow foundation with m20 grade concrete for the highmast considering the safe soil bearing capacity at site as 10 T/sqm at 2 metre depth with all materials and labour. |
| 313 | Erection and Commissioning of the high mast with all wiring materials. |
| 314 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Ambient Air Quality Monitoring, . Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 2 locations, once a quarter (10 samples) of two sector/Component |
| 315 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Water quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 2 locations, once a quarter (10 samples) of two sector/Component |
| 316 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Noise level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 2 locations, once a quarter (10 samples) of two sector/Component |
| 317 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 2 locations, once a quarter (10 samples) of two sector/Component |
| 318 | Provision for carrying out environmental monitoring within IE through NABET Accredited Laboratory Ambient Air Quality Monitoring, . Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 319 | Provision for carrying out environmental monitoring within IE through NABET Accredited Laboratory Water quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 320 | Provision for carrying out environmental monitoring within IE through NABET Accredited Laboratory Noise level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 321 | Provision for carrying out environmental monitoring within IE through NABET Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 322 | LOCATION:KUMARGHAT INDUSTRIAL STATE |
| 323 | Supply & installtion for Replacement of old 33 KV OH Dog conductor by covered Dog conductor from PK Bari 132 KV S/s to Kumarghat 33 KV S/s with all accessories & related items as below including Dismantlling up to 6KM |
| 324 | Replacement of Full GI Tubular Pole 11 m Long with MS Pole with Supply & erections. |
| 325 | Dismantling of 10M,11M & 12 M long STP Pole at any kind of soil, including excavtion of earth,refilling the pit with soil upto the ground level,ramming and making complete in all respect. |
| 326 | Replacement of 33 KV 'V' cross-arms angle type (65x65x6 mm MS angle) |
| 327 | Dismantling of V Cross-Arm, 65x65x6mm MS Angle/75x40x40x6mm MS Channel |
| 328 | Back Clamp (MS Flat 65x8 mm)- each weight 1.92 Kg |
| 329 | 33 KV Top Bracket type 100x50x6 mm & 0.35 M length |
| 330 | 33 KV Single pole cut point fitting 100x50x6 mm channel(1 Set=2No) |
| 331 | 33 KV Side cross arm 75x40x6 mm Channel |
| 332 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 M. lead of 4.0 mm. G.I wire) |
| 333 | Dismantling33KV Disc insulator set for 33KV line along with necessary fittings(1Set = 3No.) |
| 334 | Replacement of 33 KV Pin Insulator(Polymer) composite 10KN FRP Dia 33.5mm |
| 335 | Dismantling of 33 KV Pin Insulator(Polymer) composite 10KN FRP Dia 33.5mm |
| 336 | ACSR Covered Dog Conductor with 3 % Sag |
| 337 | Jointing Sleeves suitable for 80 Sq. mm.Al. |
| 338 | Painted Stay set 20 mm. complete with turn buckles |
| 339 | Stay wire 7/4.0 mm. (10 kg.stay wire per stay set ) |
| 340 | Dismantling of GI Wire(10/8SWG) including coiling etc. Complete as required. |
| 341 | ACSR 6/7/4.72/1.57 mm dia DOG including coiling etc. complete as required. |
| 342 | MS channel cross arm exceeding 2.8 M long 100x50x50x6mm |
| 343 | Dismantling of Stay set from the earth complete with 19mmx1800 mm long stay rod,anchor plate of size 300x300x8mm,thimble,turn bukle,7/3.15 mm dia G.I. standard stay wire and stain insulator etc.and making complete in all respect |
| 344 | Clamp suitable ( each weight 3.2 kg ms flat 65x8mm) |
| 345 | Stay Insulators 90X65mm |
| 346 | Concreting of Pole @0.9 cum per pole (including Muffing) |
| 347 | Anti-climbing devices (Barbed wire 2.24 mm dia. 14 SWG) |
| 348 | Danger Boards Enamalled Type 33KV |
| 349 | M.S.Nuts and Bolts |
| 350 | Dismentalling Cost |
| 351 | Route Survey of existing line and proposed network |
| 352 | Supply and Laying of UG 33 KV XLPE 185 sqmm Cable from Kumarghat SS to Kumarghat IE and 33 KV LILO System with supply & erections of all accessories & related items up to 4KM |
| 353 | Route survey |
| 354 | Supply of 3 phase 3 core 33 kv xlpe 185 sqmm AL U.G. cable |
| 355 | Laying of 3 phase 3 core 33 kv xlpe 185 sqmm al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 356 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 400 mm od |
| 357 | Supply and erection of p80. Pn6, 400 mm od hdpe pipe |
| 358 | Gi / hdpe pipe for raiser up to 400 sqmm |
| 359 | Coiling of excess 185 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand |
| 360 | Outdoor cable termination with heat shrinkable jointing kit 185 sqmm 33 KV(1 Set=3No.) |
| 361 | Supply Installation and Commissioning of Indoor 33 KV 3 Panel VCB Breaker Panel (Including One Incomer & Two Outgoing) with inbuilt Line CT, PT, Power Pack and Feeder Protection etc all complete as per approved drawing for LILO operation |
| 362 | Full GI MS Tubular Pole 11 m Long |
| 363 | Stay set 20 mm. painted complete with turn buckles |
| 364 | Stay wire 7/4.0 mm. (8.5 kg.stay wire per stay set ) |
| 365 | Clamp (3.04 kg each) |
| 366 | Stay Insulators 90X65mm |
| 367 | Ab switch 33kv 400 amp, manually gang operated |
| 368 | LA 30 kv, 10 KA , metal oxide gapless surge type |
| 369 | Supply and erection of earthing set as per IS 3043-2018. 2.5 M long GI pipe (ISI marked) of 40mm diameter). Galvanized nuts & bolts along with alternate layers of salt & charcoal including supply of 4.0 M long, 12mm dia. PVC pipe for each earthing set etc. |
| 370 | GI flat 50x6 sq.mm. and laying 0.5 m below GL, excavation, welding of joint etc. |
| 371 | Route markers complete with danger sign |
| 372 | ACSR Dog Covered Conductor with 3 % Sag |
| 373 | Protective guarding with 8 SWG GI wire |
| 374 | Laying and stringing of 8 SWG GI wire |
| 375 | Supply of 8 SWG GI wire |
| 376 | Supply and erection of Polymer pin insulator 33 kv |
| 377 | Polymer disc insulator with ball & socket type disc fitting, 33 kV |
| 378 | Supply of ms channel 100x50x50x6 mm |
| 379 | Supply of ms channel 75x40x40x6 mm |
| 380 | Supply of MS angle 65x65x6 mm |
| 381 | Erection of ms channel cross arm 1.3 to 2.8 m long, 75x40x40x6 mm with nuts and bolts |
| 382 | Erection of ms channel cross arm 0.6 to 2.8 m long, 100x50x50x6 mm with nuts and bolts |
| 383 | Erection of ms anglel cross arm 1.0 to 2.8 m long, 65x65x6 mm with nuts and bolts |
| 384 | Fabrication od cross arm with ms channel |
| 385 | Red oxide primer |
| 386 | 33 kV danger plate |
| 387 | Grouting of st pole with 1:2:4 cement concrete |
| 388 | Fabricated clamp 50x6 mm |
| 389 | Ms nuts & bolts assorted size |
| 390 | Bi metallic lugs 185 sqmm 33 kv |
| 391 | Tapping arrangement for 33 KV feeder at Kumarghat S/s with 4 Pole structure and AB Switch |
| 392 | Supply & Installation of all accessories & support items as below for Construction of new 33/11 KV S/s with 2X3.15 MVA Power Transformers .LAND & CIVIL WORK Items are below |
| 393 | Fencing of s/s land (for area covering 33/11kv substation) with barbed wire. (As per TSECL specifications/drawings) |
| 394 | MS MAIN AND WICKET GATE ON RCC COLUMN |
| 395 | YARD FENCING WITH CHAIN LINK MESH OVER RCC BEAM |
| 396 | Boundary wall with RCC column and Brick work (For Area covering substation, control room etc.). Boundary Wall shall be as per TSECL specifications/drawings) |
| 397 | MS SIGN BOARD, BAY INDICATION BOARD & RYB PHASE INDICATION BOARD |
| 398 | Yard Leveling by Kopra filling |
| 399 | Procedure to avoid grass in sub-station yard - Black Cotton (for area covering 33/11kV substation) by laying stone crusher dust as per below.1st layer: Providing & laying stone crusher dust (free from organic matter and foreign matters etc.) of average thickness 100 mm including spreading watering so as to attain desired degree of moisture for optimum compaction, compaction by light roller, making top surface levelled, even and smooth etc. for all lead & lift including cost of all material, transportation, royalty, taxes, levies, labour charges, T&P and other consumable etc. complete as directed Engineer-in-charges.2nd layerProviding & laying mixture of stone crusher dust (free from organic matter and foreign matters etc.) and cement in ratio of 1:4 (1 cement : 14 stone crusher dust, the quantity of cement shall not be less than 1 standard bag of 50 kg in 0.5 cum of stone crusher dust) of minimum thickness 50 mm including mixing of stone crusher dust and cement in mixer with desired water cement ration, laying, vibration, curing etc. complete to give a perfect cohesive, smooth & even surface, finishing as per requirement, cleaning etc. including all lead & lift and cost of all material, transportation, royalty, taxes, levies. labour charges, T&P and other consumable etc. complete as directed by Engineer-in-charge |
| 400 | 3.15 MVA Transformer BaseConcrete: 1:1.5:3 Ratio-5.634 cmt, concrete :1:5:8 Ratio-7.545 cmt., M.S. Flat/rod-324.87 kg and Base filling by Kopra in case of Black cotton soil 3.1*3.1*0.5m= 4.8 cmtBase filling by Kopra -1.92 cmt., concreting, curing and back filling of pits. All complete works |
| 401 | Full GI Tubular Pole 11 m Long with 2.5m Arm Bracket |
| 402 | LED Yard Lighting 80-Watt Flood Light |
| 403 | Providing & fixing perforated cable tray 300 mm wide & 2 mm thick fixed on 45x45x5 mm m.s. angle stand grouted in c.c 1:24 |
| 404 | Providing and fixing earth pit of brick massonery 0.6 x 0.6 m inner size with flag stone cover for watering system for 18 no earth pits. |
| 405 | Construction of retaining wall 1.5 M high as per site requirement. |
| 406 | For Earthing of New 33/11 KV s/s,Required Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS 7181/86) of No.minal dia 125 mm and 2.75 M long inside the pit including supply and fixing RCC collars 0.75 M dia(OD) 50mm thick and 0.6 M long inside the pit, back fill the pit in the 25 mm size granules of BH coke for full depth of the pit with alternate layers of BH coke and salt of 300 mm thick around the earth pipe of 150 mm on all the sides of the pipe including cost and conveyance of BH Coke,Salt,Clamps,CI pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete and including cost of CI pipe. |
| 407 | Earthing of Station Transformer /40 mm Dia (For Murrum soil) (1 Set=4No.) (Black Cotton Soil) |
| 408 | Earthing of Station Transformer /40 mm Dia (For Murrum soil) (1 Set=4No.)(For Hard rock soil) |
| 409 | Supply & Civil work for Substation Control Room Building |
| 410 | SUB HEAD -Earth work |
| 411 | Earth work in excavation over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. |
| 412 | Earth work in excavation in foundation trench |
| 413 | Filling available excavated earth |
| 414 | Sand filling |
| 415 | Supplying camical emultion |
| 416 | Diluting and injecting chemical emulsion |
| 417 | SUB HEAD - CEMENT CONCRETE WORK |
| 418 | PCC 1:4:8 (1 Cement: 4 fine sand : 8 graded stone 40 mm Nomonal size) |
| 419 | PCC 1:3:6 (1 Cement: 3 fine sand : 6 graded stone 40 mm Nomonal size) |
| 420 | PCC 1:2:4 (1 Cement: 2 fine sand : 4 graded stone 20 mm Nomonal size) |
| 421 | Sub Head-RCC work |
| 422 | RCC all work upto plinth level , 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 423 | RCC in wall , 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 424 | RCC in Column, 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 425 | RCC in suspended floor 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 426 | RCC in beams, lintel, staircases etc 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 427 | RCC inkerbs steps 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 428 | precast rcc 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone 20 mm Nomonal size) |
| 429 | Ccentering and shuttering |
| 430 | centering and shuttering, in foundation with timber plank (PCC) |
| 431 | in walls , pilester with shuttering ply |
| 432 | suspended floor with shuttering ply |
| 433 | Lintels, beams with shuttering ply |
| 434 | Column Pillars with shuttering ply |
| 435 | Vertical and horizontal fins individually or forming box louvers band, facias and eaves boards. |
| 436 | Reinforcement steel |
| 437 | BRICK WORK |
| 438 | First class brickwork in foundation in 1:4 |
| 439 | First class brickwork in Superstructure in 1:4 |
| 440 | Half brick masonry work in in superstructure 1:4 |
| 441 | extra for providing & placing in position 20 No 6 mm MS bar |
| 442 | Extra for providing and placing 2 No 6mm bar after every 4 th course |
| 443 | WOOD WORK |
| 444 | Wood work in frame karai wood |
| 445 | ISI marked flusf door |
| 446 | MS grills fixed to opening/ wooden frames |
| 447 | 40x5 mm flat iron hold fast 40 cm long |
| 448 | 100 mortice latch and lock with 6 levers |
| 449 | aluminium sliding door bolts, 300 x 16 mm |
| 450 | aluminium tower bolt, 300 x 10 mm |
| 451 | aluminium handle 125 mm |
| 452 | aluminium hanging floor door stopper |
| 453 | PVC door frame |
| 454 | Providing and fixing to existing door frames. |
| 455 | 30mm thick factory made solid both side prelam panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for styles, top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture . M.S. frame covered with 5mm thick heat moulded prelam PVC ‘C channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 45degree angle on either side forming stiles; and 5mm thick, 95mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered in 45 degree on the inner side to form top and bottom rail and 115mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered on both sides to form lock rail. Top, button and lock rails shall be provided either side of the panel. 10mm (5mm x 2 ) thick, 20mm wide cross PVC sheet be provided as gap insert for top rail & bottom rail, panelling of 5mm thick both side Prelam PVC sheet to be fitted in the M.S. frame welded/ sealed to the stiles & rails with 7mm side, and joined together with solvent cement adhesive. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ‘C Channel using PVC solvent adhesive etc. complete as per direction of Engineer-in-charge. manufacturer’s specification & drawing.(5mm+2mm) thick x 15mm wide PVC sheet beading |
| 456 | STEEL WORK |
| 457 | structural steel work in single section |
| 458 | Collapsible steel shutter |
| 459 | Angle iron frames for doors |
| 460 | 1 mm thick MS sheet door |
| 461 | Rolling shutter door |
| 462 | ball bearing for rooling shutter |
| 463 | Fan clamp |
| 464 | Steel work welded in builtup section/ frame work |
| 465 | Flooring work |
| 466 | Virtified floor tiles |
| 467 | Precast checquered cement tiles |
| 468 | 1 quality ceramic glazed wall tiles |
| 469 | 1st quality ceramic glazed floor tiles |
| 470 | marble stone in floor over 20 mm thick bed , pink plain marble |
| 471 | Extra for prefinished Noing to tread of steps |
| 472 | ALUMINIUM WORK |
| 473 | Aluminium work for doors |
| 474 | for shutters /sliding shutters |
| 475 | Glazing in aluminium door, 5.5 mm |
| 476 | glazing 4 mm |
| 477 | filling gap between aluminium frame to wall |
| 478 | 3 layer particle board |
| 479 | Aluminium window fastener |
| 480 | aluminium tubular handle |
| 481 | 100mm brass locks |
| 482 | ROOFING WORK |
| 483 | Rigid PVC rain water pipe, 110 mm oD |
| 484 | 75 mm Od |
| 485 | PVC accessories, 110 MM Coupler |
| 486 | 75 mm Od |
| 487 | Single Tee, 75x75x75 |
| 488 | Single Tee, 110x110x110 |
| 489 | sinfle tee, 75x75x75 |
| 490 | 110x110x110 |
| 491 | bend 75 mm |
| 492 | bend 110 mm |
| 493 | PVC pipe clip 75 mm |
| 494 | 110 mm |
| 495 | FINISHING WORK |
| 496 | 12 mm Cement plaster in 1:4 |
| 497 | 15 mm Plaster in 1:4 |
| 498 | 6 MM cement plaster in 1:3 |
| 499 | Neat cement punning |
| 500 | Extra for providing water profing materials in cement plaster |
| 501 | 2 mm putty |
| 502 | water thinnable cement primer |
| 503 | Acrylic smooth exterion paint |
| 504 | Primer on wood |
| 505 | Primer on steel |
| 506 | Epoxy paint on steel |
| 507 | Wall painting with plastic emulsion paint ( two or more coats ) of required colour of approved brand and manufacture on new work to give an even shade. |
| 508 | Anticorrosive bitumastic paint |
| 509 | SANITARY WORK |
| 510 | Indian type WC pan |
| 511 | European type W.C. pan |
| 512 | Half stall urinal |
| 513 | Wash basin |
| 514 | Pedestal for wash basin |
| 515 | PVC waste pipe |
| 516 | 600x 450 mm bevelled edge mirror |
| 517 | 600x120x5 mm glass shelf |
| 518 | PTMT towel rail |
| 519 | PTMT liquid shop container |
| 520 | UPVC pipe 75 mm OD |
| 521 | 110 mm OD |
| 522 | fabricated UPVC bend 75 mm OD |
| 523 | 110 mm OD |
| 524 | UPVC equel TEE 90 x 90 |
| 525 | 110x110 mm |
| 526 | UPVC end cap, 90 mm |
| 527 | 110x 110 mm |
| 528 | WATER SUPPLY |
| 529 | GI pipes, 15 mm, internal work |
| 530 | 20 mm |
| 531 | External work in trenching 25 mm |
| 532 | 40 mm |
| 533 | Making connection of GI distribution branch |
| 534 | 7.5x7.5 cm in walls |
| 535 | Sintex |
| 536 | CP brass bib cock |
| 537 | Long body bib cock |
| 538 | stop cock |
| 539 | Ball valve 15 mm |
| 540 | 20 mm |
| 541 | 25 mm |
| 542 | Gun matel gate valve, 40 mm |
| 543 | Gun matel Non return valve |
| 544 | GI union 15 mm Nominal bore |
| 545 | 20 mm Nominal bore |
| 546 | 25 mm Nominal bore |
| 547 | 40 mm Nominal bore |
| 548 | PTMT grating 100 mm |
| 549 | SEWERAGE & DRAINAGE |
| 550 | Construction of masonry chamber, 455 x 610 mm |
| 551 | 500x 700 mm |
| 552 | CI cover manhole |
| 553 | Making soak pit 2.5 m dia |
| 554 | applying cement slurry on old cc/RCC/brick work |
| 555 | Providing, fitting & fixing in position 4mm thick aluminium composite panel (ACP) cladding of approved make, fabricated to flat, smooth curved to required radius,circular ring cladding to shape as per requirement( exterior / interior surface), in metalic colours using prefabricated aluminium extruded profiles of alloy-6063 T6 in chromatized finish to withstand the design wind pressure of 200 Kg/ sqm. The fastening brackets of aluminium/ hot dip galvanised with SS-304 screws, fasteners and anchor bolts complete with nylon seperators to prevent bi-metallic contacts. ACP sheets will be fixed with both ways Norton tape and Dow coring 995 structured sealant, including necessary scaffolding complete, as per approved architectural drawing, design and direction of the Engineer -in charge. |
| 556 | Providing and fixing hand rail using structural steel etc. of approved size by welding etc. to steel ladder railing, balcony railing and staircase railing etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete as required:- |
| 557 | M.S. tube |
| 558 | Providing 10mm thick plaster of Paris (gypsum anhydrous) ceiling up to a height of 5 m above floor level over first class wood strips 25x6 mm with 10 mm gap in between and reinforced with rabbit wire mesh fixed to wooden frame (frame work to be paid separately) |
| 559 | Flat surfaces |
| 560 | Supply & installation for Internal electrification work for control room |
| 561 | Wiring for light/fan/exhaustfan/callbell point with 1.5 sq.mm |
| 562 | Pvc insulated. Cu conductor cable in pvc casing capping etc. as reqd. a) Short Point:- |
| 563 | b)Medium Point |
| 564 | c)Long Point |
| 565 | Wiring for 3 pin 5/6 amps plug point with 1.5 sq mm pvc insu. allu. condo cable in pvc casing capping ilc providing & fixing 3 pin 5/6 amps socket outlet & 5/6 amps piaNo type switch earthing the 3rd pin etc. as reqd |
| 566 | Wiring for 3 pin 15/16 amps plug point with 4 sq mm pvc insu. allu. condo cable in pve casing capping ilc providing & fixing 3 pin 5/6 amps socket outlet & 5/6 amps piaNo type switch earthing the 3rd pin etc. as reqd |
| 567 | Supplying and fixing ofaccessories for PVC casing and capping in/c. necessary connection as required. Make: - Anchor / Precision / Cona (Nice) / SSK / J.J. Deluxe (Fancy), a) Ceiling rose. |
| 568 | b)Anglelampholder. |
| 569 | c)5/6Amp. piaNowitch. |
| 570 | Supplying and fixing ofaccessories for PVC casing and capping in/c. necessary connection as required, a) 102 mm X 102 mm, size wooden formica board with bakelite cover. |
| 571 | b)102 mm X 178 mm, size wooden formica board withbakelite cover. |
| 572 | c)152 mm X 203 mm, size wooden formica board withbakelite cover. |
| 573 | d)203 mm X 300 mm, size wooden formica board withbakelite cover. |
| 574 | e)254 mm X 300 mm, size wooden formica board withbakelite cover. |
| 575 | Wiring for circuital submainwiring with the following sizes pvc insulated ISI marked. Cu. cable in pvc casing capping etc. as reqd( FiNolex/Havells) a) 2 x 1.5 sq mm |
| 576 | b)2 x 4 sq mm |
| 577 | c)4 x 10 sq mm |
| 578 | d)2 x 6 . sq mm |
| 579 | Earthing with G.l. earth pipe 4.5 M long & 40 mm dia with masonary enclosure on the top etc as reqd. |
| 580 | Extra for using salt & charcoal, coke for pipe earth electrode as reqd |
| 581 | Providing & fixing of 4.06mm (8SWG) dia G.l. wire in 19 mm dia polythene pipe in recess for loop earthing |
| 582 | Supplying & drawing 4 sq mm Allu.. condo cable for loop earthing along with other wires as reqd |
| 583 | Supply, Installation, testing &commissioning of ceiling fan (48 inch sweep) with all accessories i/c speed regulator, caNopy, down rod of standard length) upto 30 cm )etc. as reqd and also required supplying, fixing and fabrication of extra down rod wherever necessary.(Usha / Khaitan/ Cromptom / Orient) |
| 584 | Supplying & fixing of busbarchamber with 4 strips busbar of length 300 mm made of allu. alloy or wrought alloy suitable for 100 amps capacity with all accessories i/c painting etc. as reqd (GECD make) |
| 585 | Supplying & fixing of 25mm x 25mm x 6mm size MS angle frame with 20 cm long 4 No legs grouted on wall by 1 :2:4 cc work i/c providing & fixing 25 mm gamair wooden plank ile painting etc as reqd |
| 586 | Supplying & fixing of following TPN main switch (rew) 450 volts i/c drilling holes on board/M.S. Clamp connections etc. as reqd.(cat-B) (Havells/HPL) a)100 ampsTPN |
| 587 | b) 63ampsTPN |
| 588 | Supplying & fixing of following metal enclosure for 240/415 volts MCB single pole or Isolator complete with busbar, earthbar, neutral link, dinrail etc i/cconn. as reqd (cat-B)(Havells/HPL) a) 8 way |
| 589 | b)6 way DB |
| 590 | c)4 wayDB |
| 591 | Supplying & fixing of 5 to 32amps rating 240 volts 'G' series MCB of' single pole in the existing MCB DB complete with connection etc; as reqd. (Cat:-B) |
| 592 | Supplying & fixing of 230 mm sweep exhaust fan in existing hole i/c conn |
| 593 | Supplying & fixing of necessary shutter for 230 mm sweep exhaust fan in existing hole i/c necessary conn, as reqd |
| 594 | Supplying & fixing of Ding Dong callbell i/c necessary conn, etc as reqd. |
| 595 | Supplying & fixing of electronic musical call bell i/c necessary conn, etc as reqd |
| 596 | Supplying & fixing of 32 amps DP switch (kitkat) i/c necessary connections as reqd. |
| 597 | Supplying and fixing of singlebox type FTL fittings completewith 1 No 40 / 36 watt copperballast, 40/36 watt flurosenttube, starter, holder, pfimproving capacitor etc. in/c. connection as required. (Make: - Phillips / Havells/ Crompton / Bajaj). |
| 598 | Supplying and fixing of doublebox type T 5 rated energy |
| 599 | Efficent FTL fittings complete with 2 No. 40 / 36 watt copper ballast, 2 No. 40/36 watt flurosent tube, starter, holder, pf improving capacitor etc. in/c. connection as required. (Make: - Phillips /Havells/ Crompton / Bajaj). |
| 600 | Supplying & fixing of fancybracket light tittings complete with 1 No 11 watt CFL light glass cover, holder etc i/c conn, as reqd:- (Crompton/Havells make) |
| 601 | Supply and Erection of IPDS Sign board with providing 1.6mm thickness MS Sheet (6X4) ft- (lengthX bradth) size of Iron sheet i/c painting of board by screen printing method,6ft height board from ground level,support L type angle(3\\" X3\\",6mm thickness),1.50 ft length of angle to be buried in the ground with 1ft hole pass inside with grouting etc as per approved drawing,design & technical specification and scope of work. |
| 602 | Others Items |
| 603 | 1000 LITER P/F SINTEX OVERHEAD TANK & GI PIPE (WITH LENGTH OF 125 M) FITTING FOR WATER SUPPLY INCLUDING WATER TAP(17 No) NEAR TRANSFORMER NEUTRAL EARTHING |
| 604 | PROVIDING AND FIXING 5HP SUBMERSIBLE PUMP with all accessories |
| 605 | Furniture for control room (1Set = Table 600mmx 900mm- 1No, Chair- 3No, Computer table 1No (Godrej or equivalent )) |
| 606 | VRLA Battery Set 110 Volt, 240 AH (1 Set=55 No.) |
| 607 | Sub station Battery charger 240 AH, 110 Volt |
| 608 | 110 V DC Distribution Boaed |
| 609 | Supply, installation, testing & commissioning of wall mounted A.C. Sub distribution board (ACDB-2), comprising of 200 A MCCB I/C, PIL, 200/5A CT (3 No.) A+AS, V+VS, Outgoing- 32A TPN MCB 2 No., 63A TPN MCB 2 No, 16A SPN MCB 9 No. |
| 610 | Laptop for reading in Control & Protection Panel room |
| 611 | DELL 12Generation Intel @ Core i5-1235U Window 11 Home single language intel@ Iris Xe Graphics RAM:-16GB,8GBx2,DDR4,2666MT/s,HARD Disk :-512GB,M.2,PCIe,NVMe.SSD.Display size:- 39.6 C.m.Full HD (1920 x 1080),Weight :1.65 Kg |
| 612 | Supply of Safety Items & Testing Tools |
| 613 | Fire extinguisher ABC Type 6 Kg |
| 614 | Sand buckets 2 No. on each earth stand with caNopy |
| 615 | First Aid Boxes |
| 616 | 33 KV Hand Gloves |
| 617 | 11 KV Hand Gloves |
| 618 | Earth Discharge Rod -33 KV |
| 619 | Rubber Mat for 33 KV 6 x 4 feet (Thickness as per IS 15652) |
| 620 | Insulation Tester (Megger Make) 5000 VA |
| 621 | Earth Tester |
| 622 | Mili Amp AC Clamp Meter (make Motwani) |
| 623 | Supply & installation of DP Structure for 33 KV Incoming with all accessories & support items as below |
| 624 | H- BEAM 11 METER 152 X 152 MM 37.1 KG/METER = 408.1 kg |
| 625 | DC.CROSS ARMS 8` CENTRE TO CENTRE 100X50X6 MM CHANNEL (each weight-26.32 Kg) (ONE SET FOR FEEDER AND ONE SET FOR ISOLATOR/ME)(1Set=2No.) |
| 626 | Clamp suitable for 152 X 152 mm., 37.1 Kg./M H-Beam ( each weight 3.2 kg)(1Set=2No.) |
| 627 | HORIZONATAL & CROSS BRACING 8' CENTRE (wt of each X-BRACING-64.29 Kg (1Set=2No.) |
| 628 | Back Clamp suitable for H-Beam (MS Flat 65x8 mm)- each weight 1.92 Kg |
| 629 | 33 KV Polymer composite 70 KN Disc Insulator |
| 630 | 33 KV Strain hardware (T&C type) fittings |
| 631 | 33 KV 900 mm CD Polymer Composite pin insulator |
| 632 | Stay set 20 mm. complete without Stay wire (Hot Dipped galvanized) |
| 633 | Clamp suitable for 152 X 152 mm., 37.1 Kg./M H-Beam ( each weight 3.2 kg)(1Set=2No.) |
| 634 | STAY WIRE 7/4.00 MM.(7/8 SWG)(8.5 kg./stay) |
| 635 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 636 | CONCRETING (1:3:6) OF H-BEAM @ 0.7 CMT.PER POLE INCLUDING muffing |
| 637 | CONCRETING (1:3:6) OF STAY @ 0.3 CMT. PER STAY (20MM) |
| 638 | EARTHING COIL OF 115 TURNS OF 50 MM.DIA AND 2.5 M LEAD OF 4.0 MM G.I WIRE |
| 639 | Supply & Installation for STRUCTURES AND BUS-BAR ARRANGEMENTS with all accessories & support items as below |
| 640 | H- BEAM 9 METER 152 X 152 MM 37.1 KG/METER = 333.9 kg. FOR 33KV GANTRY STRUCTURE |
| 641 | H- BEAM 9 METER 152 X 152 MM 37.1 KG/METER = 333.9 kg. FOR 11KV GANTRY STRUCTURE |
| 642 | H- BEAM 7 METER 152 X 152 MM 37.1 KG/METER = 259.7 kg. FOR 5' CENTER JUMPER SUPPORT FOR 33 & 11KV SIDE |
| 643 | D.C. CHANNEL 4.8 M CENTRE 100X50X6MM FOR 33KV BUS BAR (each weight-99.90 Kg) G.I |
| 644 | D.C. Channel (3.8 M) 65x65x6mm G.I. |
| 645 | D.C.cross- arm of 65 X 65X 6 mm. ISMC channel suitable for 5' centre (65.09 kg each) |
| 646 | ACSR PANTHER CONDUCTOR 0.20 SQ. INCH (200 SQ.MM AL.EQ.) |
| 647 | 33 KV 900 mm CD Polymer Composite pin insulator |
| 648 | 11 KV, 5KN PIN COMPOSITE POLYMER INSULATOR |
| 649 | 33 KV Polymer composite 70 KN Disc Insulator |
| 650 | 33 KV COMPOSITE POLYMER STRAIN SET WITH HARD WARE SUITABLE FOR PANTHER CONDUCTOR (FOR 33KV SIDE) |
| 651 | 33 KV COMPOSITE POLYMER STRAIN SET WITH HARD WARE SUITABLE FOR PANTHER CONDUCTOR (FOR 11KV SIDE) |
| 652 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 653 | CONCRETING (1:3:6) OF H-BEAM @ 0.70CMT.PER POLE INCLUDING muffing |
| 654 | Supply & installation for DP STRUCTURE OUT GOING 11 KV FEEDERs with all accessories & support items as below |
| 655 | H- BEAM 11 METER 152 X 152 MM 37.1 KG/METER = 408.1 kg |
| 656 | DC.CROSS ARMS 8` CENTRE TO CENTRE 100X50X6 MM CHANNEL (each weight-56.32 Kg) (1Set=2No.) |
| 657 | 11 KV STRAIN HARDWARE (T&C TYPE) FITTINGS |
| 658 | HORIZONATAL & CROSS BRACING 8' CENTRE (wt of each X-BRACING-64.29 Kg (1Set=2No.) |
| 659 | Back Clamp suitable for H-Beam (MS Flat 65x8 mm)- each weight 1.92 Kg |
| 660 | Stay set 20 mm. complete without Stay wire (Hot Dipped galvanized) |
| 661 | Clamp suitable for 152 X 152 mm., 37.1 Kg./M H-Beam ( each weight 3.2 kg)(1 Set=2No.) |
| 662 | Stay wire 7/4.0 mm. (8.5 kg.stay wire per stay set ) |
| 663 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 664 | CONCRETING (1:3:6) OF H-BEAM @ 0.70 CMT.PER POLE INCLUDING muffing |
| 665 | CONCRETING (1:3:6) OF STAY @ 0.3 CMT. PER STAY (16MM) |
| 666 | EARTHING Pipe OF 115 TURNS OF 50 MM.DIA AND 2.5 M LEAD OF 4.0 MM G.I WIRE |
| 667 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 33/0.433KV, 63 KVA Distribution Transformer (for S/s) as per IS 1180 latest amendment |
| 668 | DC.CROSS ARMS 8` CENTRE TO CENTRE 100X50X6 MM CHANNEL (each weight-26.32 Kg)(1Set=2No.) |
| 669 | 11 KV, 45 KN DISC T&C COMPOSITE POLYMER LONG ROD INSULATOR |
| 670 | 11 KV STRAIN HARDWARE (T&C TYPE) FITTINGS |
| 671 | 9 KV Gapless type LA ( 5KA) Polymer for DTR |
| 672 | 11 KV Drop out Fuse (Porcelin) |
| 673 | Transformer mounting dc cross-arm 100 x 50 x6 mm. Channel(1Set=2No.) |
| 674 | DANGER BOARD ENAMELED 11 KV |
| 675 | L.T.DISTRIBUTION BOX FOR 63 KVA TRANSFORMER (200 A. ISOLATOR & 6 SP MCCB OF 90 A.) made of SMC |
| 676 | Supply of 11KV 185 Sq.mm XLPE Cable |
| 677 | Laying of 11KV 185 Sq.mm XLPE Cable |
| 678 | CONCRETING (1:3:6) OF H-BEAM @ 0.6 CMT.PER POLE INCLUDING BASE PEDDING |
| 679 | Supply & Installation for 33 KV EQUIPMENTS |
| 680 | 33/11 KV Power transformer , OFTC Type , 3150 KVA (Loss 3+15 KW) |
| 681 | Design, Engineering,manufacturing, Supply, of33KV, 750 MVA rupturing capacity, 1250A, 31.5 KAfor 3 Sec. Metal Clad withdrawable type indoor VCB operative on 110 V DC, highly reliable , and totally enclosed product undercompartmentalised construction combined withpositive safety interlocks for safe draw in/draw out of VCB trolley/carriage including draw out type PT Compartment (with dual rating PT 33KV/1.732/110V/1.732-110 V/1.732) in VCB Trolley with standard integrated protection relays( both numerical & electromechanical) as per IEC62271-100/200, 12 window alarm & annunciation system and SCADA compatible control system,power pack,series trip arrangement, internal arc tested as per IEC62271-200 including integral earth switch and motor operated spring charged mechanism, mounted on truck carriage, complete with self contained mechanism with mechanical & electrical indications of operational status & auxiliary switch as required as per standard requirement specified in Technical specification section in the bid document including supply of INo 2.5 KVMotorised Meggar. a) Incoming Feeder (CTR: 300/1- 1A) |
| 682 | Supply & Installation 33 KV CTs.(out door oil filled type) 200-100/1-1 Amps Single Phase, Dual Core |
| 683 | Erection,Testing & Comissoining of 33 KV CTs.(out door oil filled type) 300/1-1 Amps Single Phase, Dual Core |
| 684 | 33 KV PT for Line (33/110 Volt) |
| 685 | 33KV Control & Relay Panel for Transformer with IEC 61850 compliant differential relay,numerical type with static TVM |
| 686 | 33KV Isolator double break with earth |
| 687 | 33KV side Post Insulator |
| 688 | 33KV Pin Insulator |
| 689 | T CLAMP ALUMINUM FOR BUS BAR PANTHER RUN PANTHER TAP |
| 690 | Supply & installation of11 KV EQUIPMENTS |
| 691 | Design, Engineering, Supply of 11 KV, 1250Amps, 25 KA for 3 seconds, 350 MVA rupturing capacity Indoor Vaccum Circuit Breaker, complete with Control & Relay Pannel Simplex type with 3Phase pannel topmounted PT of ratio: 11000 /110Volt,110 Volt DC actuated electrical closing mechanism and internal wiring, Numerical as well as electromechanical protection by 2-Over current & 1-earth fault combined ( Micom or other reputed make) digital & electromechanical relays forintegrated protection,1 Noelectromechanical AREVAMaster Trip Relay, auxiliary relays as required,! NoL&T /SECURE make \\"Tri- Vector\\" MeterfSCADA compatible with communication facility) 3- Ammeter, 1 -Voltmeter, 1 -C.T operated static KW meter, with panel bus mounted C.T and integral earthing facilityincluding inernal arc tested panel conforming to relevantISS/IEC as reqd.including standard indication facilities as per requirement detailed in bid document, a. Incoming pannel with (CTR:900-450/1-1-0.577A) |
| 692 | Supply of 11 KV Under-Ground XLPE armoured Cable 3X185 Sq.mm. |
| 693 | Laying of 11 KV Under-Ground XLPE armoured Cable 3X185 Sq.mm. |
| 694 | Indoor heat shrinkable cable end jointing kit with lugs for 11 kV grade XLPE cable for 3 core 185 sq mm(1Set=3 No.) |
| 695 | Supply & Installation for SWITCHYARD EQUIPMENTS |
| 696 | 33 KV ISOLATOR 630 A. (1Set=3 No.) |
| 697 | 11 KV ISOLATOR 800 Amp (1Set=3 No.) |
| 698 | 33 KV LA POLYMER TYPE GAPLESS /METAL OXIDE SUBSTATION TYPE(1Set=3 No.) |
| 699 | 11 KV LA POLYMER TYPE GAPLESS /METAL OXIDE SUBSTATION TYPE(1Set=3 No.) |
| 700 | For substation metering- 3 phase 4 wire 3x63.5 volts lb=5 amps Imax = 10 amp, HT trivector meter class of accuracy 0.5s, DLMS Compliant category A Meters along with GSM (GPRS compatible ) modems, |
| 701 | SHEET METAL METER BOX SUITABLE FOR H.T. STATIC TRAVECTOR METERS WITH TTB |
| 702 | COPPER CONTROL CABLE 12 CORE, 2.5 SQMM PVC UNARMOURED |
| 703 | COPPER CONTROL CABLE 8 CORE, 2.5 SQMM PVC UNARMORED |
| 704 | COPPER CONTROL CABLE 4 CORE, 2.5 SQMM PVC UNARMOURED |
| 705 | COPPER CONTROL CABLE 2 CORE, 2.5 SQMM PVC UNARMOURED |
| 706 | BIMETALLIC CLAMPS FOR POWER TRANSFORMER 11KV SIDE |
| 707 | Supply & erection of OTHER MISCELLANEOUS ITEMS |
| 708 | PVC CABLE 2 CORE ARMOURED 2.5 SQMM ALUMINIUM CONDUCTOR |
| 709 | PVC CABLE 4 CORE ARMOURED 16 SQMM ALUMINIUM CONDUCTOR |
| 710 | M S BOLT WITH NUT 16X250 MM |
| 711 | M S BOLT WITH NUT 16X200 MM |
| 712 | M S BOLT WITH NUT 16X165 MM |
| 713 | M S BOLT WITH NUT 16X140 MM |
| 714 | M S BOLT WITH NUT 16X90 MM |
| 715 | M S BOLT WITH NUT 16X40 MM |
| 716 | RED-OXIDE PAINT |
| 717 | ALUMINUM PAINT |
| 718 | DANGER BOARD ENAMELED 33 KV AND 11 KV |
| 719 | Supply and Laying of UG 11 KV XLPE 185 sqmm Cable for new 11 KV Feeders inside Kumarghat IE with all accessories & support items up to 3 KM |
| 720 | Supply of 3 phase 3 core 11 kv xlpe 185 sqmm al power cable |
| 721 | Laying of 3 phase 3 core 11 kv xlpe 185 sqmm al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 722 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 400 mm od |
| 723 | Supply and erection of p80. Pn6, 400 mm od hdpe pipe |
| 724 | Gi / hdpe pipe for raiser up to 400 sqmm |
| 725 | Coiling of excess 185 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand / Duct |
| 726 | Outdoor cable termination with heat shrinkable jointing kit 185 sqmm (1Set=3 No.) |
| 727 | Route marker complete with danger sign |
| 728 | 11 kv danger plate |
| 729 | MS nuts & bolts assorted size |
| 730 | Bi metallic lugs 185 sqmm |
| 731 | Ht kiosks complete |
| 732 | 8 swg gi wire |
| 733 | Route survey of existing line and proposed network |
| 734 | 11 kv 3 way rmu |
| 735 | 440V 4 way rmu |
| 736 | Supply and Installation of 500 KVA , 11/0.4 KV DTR at Kumarghat IE with all accessories & support items as below. |
| 737 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 500 KVA Distribution Transformer (As per IS 1180 latest amendment) |
| 738 | Full GI Tubular Pole 11 m Long |
| 739 | D.C.cross-arm of 100 x50x 6 mm. 2.8 M Long (1Set=2No.) |
| 740 | 11 kv (45kn) 16mm frp with 25mm per kv creepage disc insulator polymer |
| 741 | 11kv strain hardware fitting |
| 742 | 11 kv d.o. fuse & lightening arrestor mounting channel (75x 40 x 6 mm.) |
| 743 | Back clamp for h-beam size-480 mm ,wt-1.92 kg using 65x8 ms flat |
| 744 | 11 kv d.o. fuse unit (Porcelin) |
| 745 | 9 kv gapless type LA ( 5ka) polymer for dtr |
| 746 | Supply & Civil work for Construction of Transformer Base as per TSECL drawings/specifications |
| 747 | Clamp for size- ,wt-3.2 kg using 65x8 ms flat |
| 748 | Stay set 20 mm. painted complete with turn buckles |
| 749 | Stay wire 7/4.0 mm. (8.5 kg.stay wire per stay set ) |
| 750 | Stone block/pre cast block for base pedding 450x450x75mm |
| 751 | Concreting of pole/ h-beam @ 0.70 cmt. Per pole with muffing (1:3:6) |
| 752 | Concreting of stay @ 0.2 cmt. Per stay (1:3:6) |
| 753 | Acsr conductor rabbit for jumper |
| 754 | Danger boards enamalled type 11kv |
| 755 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 756 | Bi-metallic clamps suitable for 12mm dia stud LT side |
| 757 | Anti climbing devices (barbed wire 2.24 mm dia (14 swg) (3.5 kg. Wire per pole) |
| 758 | Red oxide paint |
| 759 | Aluminium paint |
| 760 | M.s.nuts and bolts |
| 761 | Distribution box mounting channel (75x40x6 mm.) |
| 762 | L.t. distribution box suitable for 500 kva transformer (without tpn switches) with mccb on incoming and pf units on outgoing side made of smc |
| 763 | LT 300 sq.mm.,3.5 core xlpe armoured aluminium conductor cable |
| 764 | LT Al Lugs 300 sqmm |
| 765 | 11 KV AB Switch, 400 Amp with Complete fitting |
| 766 | DTR S/s fencing (Total 37 feet running meter max.) of 6' height with chain link fencing on MS Angle(50x50x6mm) support 7 nos. 7' height. |
| 767 | Supply & Civil work for Construction of Transformer Base as per TSECL drawings/specifications |
| 768 | Supply and Installation of 315 KVA, 11/0.4 KV DTR at Kumarghat IE with all accessories & support items as below |
| 769 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 315 KVA Distribution Transformer (As per IS 1180 latest Amendment) |
| 770 | Full GI Tubular Pole 11 m Long |
| 771 | D.C.cross-arm of 100 x50x 6 mm,2.8 M Long(1Set=2No.) |
| 772 | 11 kv (45kn) 16mm frp with 25mm per kv creepage disc insulator polymer |
| 773 | 11kv strain hard ware fitting |
| 774 | Back clamp for h-beam size-480 mm ,wt-1.92 kg using 65x8 ms flat |
| 775 | 11 kv d.o. fuse unit |
| 776 | 9 kv gapless type LA ( 5ka) polymer for dtr |
| 777 | Supply & Civil work for Construction of Transformer Base as per TSECL drawings/specifications |
| 778 | Clamp for h-beam size- ,wt-3.2 kg using 65x8 ms flat |
| 779 | Stay set 20 mm. painted complete with turn buckles |
| 780 | Stay wire 7/4.0 mm. (8.5 kg.stay wire per stay set ) |
| 781 | Stone block/pre cast block for base pedding 450x450x75mm |
| 782 | Concreting of h-beam @ 0.70 cmt. Per pole with muffing (1:3:6) |
| 783 | Concreting of stay @ 0.2 cmt. Per stay (1:3:6) |
| 784 | Acsr conductor rabbit for jumper |
| 785 | Danger boards enamalled type 11kv |
| 786 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 787 | Bi-metallic clamps suitable for 12mm dia. stud LT side |
| 788 | Anti climbing devices (barbed wire 2.24 mm dia (14 swg) (3.5 kg. Wire per pole) |
| 789 | Red oxide paint |
| 790 | Aluminium paint |
| 791 | M.s.nuts and bolts |
| 792 | Distribution box mounting channel (75x40x6 mm.) |
| 793 | L.t. distribution box suitable for 315 kva transformer (without tpn switches) with mccb on incoming and pf units on outgoing side made of smc |
| 794 | LT 300 sq.mm.,3.5 core xlpe armoured aluminium conductor cable |
| 795 | LT Al Lugs 300 sqmm |
| 796 | 11 kV, A.B switch (Air Break), 400A with complete fitting. |
| 797 | DTR S/s fencing (Total 37 feet running meter max.) of 6' height with chain link fencing on MS Angle(50x50x6mm) support 7 nos. 7' height. |
| 798 | Earthing with G.l. earth pipe 4.5 M long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr |
| 799 | Supply and Laying of UG LT XLPE 300 sqmm Cable inside Kumarghat IE with all accessories as below |
| 800 | Supply of 3 phase 3.5 core LT xlpe 300 sqmm al power cable |
| 801 | Laying of 3 phase 3.5 core LT xlpe 300 sqmm al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 802 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 160 mm od |
| 803 | Supply and erection of p80. Pn6, 160 mm od hdpe pipe |
| 804 | Gi / hdpe pipe for raiser up to 400 sqmm |
| 805 | Coiling of excess 300 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand / Duct |
| 806 | Outdoor cable termination with heat shrinkable jointing kit 300 sqmm (1Set=3 No.) |
| 807 | Route marker complete |
| 808 | LT danger plate |
| 809 | Ms nuts & bolts assorted size |
| 810 | Bi metallic lugs 300sqmm |
| 811 | 8 swg gi wire |
| 812 | Route survey of existing line and proposed network |
| 813 | Feeder pillars complete |
| 814 | Supply and Laying of UG LT XLPE 185 sqmm Cable inside Kumarghat IE with all accessories |
| 815 | Supply of 3 phase 3.5 core LT xlpe 185 sqmm al power cable |
| 816 | Laying of 3 phase 3.5 core LT xlpe 185 sqmm al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 817 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 160 mm od |
| 818 | Supply and erection of p80. Pn6, 160 mm od hdpe pipe |
| 819 | Gi / hdpe pipe for raiser up to 400 sqmm |
| 820 | Coiling of excess 185 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand / Duct |
| 821 | Outdoor cable termination with heat shrinkable jointing kit 185 sqmm (1Set=3 No.) |
| 822 | Route marker complete |
| 823 | LT danger plate |
| 824 | Ms nuts & bolts assorted size |
| 825 | Al metallic lugs 185 sqmm |
| 826 | 8 swg gi wire |
| 827 | Route survey of existing line and proposed network |
| 828 | Feeder pillars complete |
| 829 | Supply and Laying of UG LT XLPE 95 sqmm Cable inside Kumarghat IE with all accessories as below |
| 830 | Supply of 3 phase 3.5 core LT xlpe 95 sqmm al power cable |
| 831 | Laying of 3 phase 3.5 core LT xlpe 95 sqmm al power cable in trench 350 mm x 1200 mm, sand cushioning 250x350 sqmm, brick protection 120 sqmm |
| 832 | Excavation of cable entry pit through hdpe pipe pe80 pn 6, 160 mm od |
| 833 | Supply and erection of p80. Pn6, 160 mm od hdpe pipe |
| 834 | Gi / hdpe pipe for raiser up to 400 sqmm |
| 835 | Coiling of excess 95 sqmm cable in pit size 2250 x 2250 sqmm minimimum by brick laying and 300 mm fine sand / Duct |
| 836 | Outdoor cable termination with heat shrinkable jointing kit 95 sqmm (1Set=3 No.) |
| 837 | Route marker complete |
| 838 | LT danger plate |
| 839 | Ms nuts & bolts assorted size |
| 840 | Al metallic lugs 95 sqmm |
| 841 | 8 swg gi wire |
| 842 | Route survey of existing line and proposed network |
| 843 | Feeder pillars complete |
| 844 | Supply and Installation of Street Light LED Lamps with all accessories and below items. |
| 845 | Full Glavanized Tubular Pole 11 m Long |
| 846 | Clamps / arm brackets / fixing arrangement for street light fittings suitable for led fixture |
| 847 | Concreting of pole @ 0.50 cmt. Per pole with muffing |
| 848 | Earthing coil ( coil of 115 turns of 50 mm.dia. And 2.5 M. Lead of 4.0 mm. G.i wire) |
| 849 | Supply and installation led lamp fitting, for street light 80 watt, with polycarbonate glass cover with ip66 enclosure and complete fittings and connection from pole junction box |
| 850 | 3 core 1.5 sq mm unarmoured cable for street light connection |
| 851 | Junction box |
| 852 | Supply and laying of street light cable 4 core 10 sq mm armoured |
| 853 | Supply and fixing of post top led lamp in main gate with gi pipe and loop box led lamp 120 watt |
| 854 | Timer switch for street light switching |
| 855 | Excavation for cable laying |
| 856 | Route Survey |
| 857 | Supply and Erection of High Mast Lighting with all accessories & below items |
| 858 | Supply of 20 M high mast shaft suitable for 39 m/sec wind speed, with all accessories including foundation bolts, aviation light, feeder pillar & suitable as per illumination design Wiring material,power cables between panel and mast, MCB in base compartment are Not included & shall be in the scope of erection. |
| 859 | Supply of Non-integral floodlight luminaries LED 250 Watts, 8 No in each pole HPI/T Plus lamps and its control gear boxes. |
| 860 | Provision of gi pipe earthing for high mast with 2.5 m long 50 mm dia gi pipe including connection to high mast earth terminal with 25 x 3 mm gi flats with all materials and labour. |
| 861 | Power and Control Panel Outdoor and Environment Protection |
| 862 | Construction of shallow foundation with m20 grade concrete for the highmast considering the safe soil bearing capacity at site as 10 t/sqM at 2 metre depth with all materials and labour. |
| 863 | Erection and commissioning of the high mast with all wiring materials. |
| 864 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Ambient Air Quality Monitoring, . Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component |
| 865 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Water quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component |
| 866 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Noise level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component |
| 867 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 locations, once a quarter (06 samples) of two sector/Component |
| 868 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Ambient Air Quality Monitoring, . Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component of four sector/Component |
| 869 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Water quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component of four sector/Component |
| 870 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Noise level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 871 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of two sector/Component |
| 872 | LOCATION: DHARMANAGAR IDUSTRIAL STATE |
| 873 | Supply & Erection of all items for Construction of 11 KV Bay at 132/11 KV Mission Tilla Sbstation. |
| 874 | Supply & Erection of 11 KV vacuum circuit breaker(VCB) with control and relay panel (outgoing), simplex type 800A continuous current rating, 250 MVA rupturing capacity with manual and motorised spring closing mechanism,electrical closing and opening arrangement and internal panel wiring with provisions of 2-over current & 1-earth fault combined relay, auxiliary relays, 1-Voltmeter, 3-Ammeter, 1 - CT operated static tri-vector meter(TVM). CTR = 200/ 1-1-0.577. PTR = 11000/√3 / 110/√3. |
| 875 | Design, engineering, supply, testing and commissioning of 11 kv adapter panel for 1250 ampwith allied accessories and cables |
| 876 | 11 kv isolator 800 a.(turn & twist type) |
| 877 | 11 kv la polymer type gapless /metal oxide 9 kv , 10 ka substation type |
| 878 | 11 kv single phase pts oil immersed |
| 879 | For substation metering- 3 phase 4 wire 3x63.5 volts lb=5 amps imax = 10 amp, ht trivector meter class of accuracy 0.5s, dlms compliant category a meters along with gsm (gprs compatible ) modems, |
| 880 | Sheet metal meter box suitable for h.t. static travector meters with ttb |
| 881 | Copper control cable 12 core, 2.5 sqmm pvc unarmoured |
| 882 | Copper control cable 8 core, 2.5 sqmm pvc unarmored |
| 883 | Copper control cable 4 core, 2.5 sqmm pvc unarmoured |
| 884 | Copper control cable 2 core, 2.5 sqmm pvc unarmoured |
| 885 | T clamp aluminum for bus bar panther run panther tap |
| 886 | Bimetallic clamps for power transformer 11kv side |
| 887 | Strain plate (IS MS flat 65x8x250mm) 0.65 kg each with stay set, Stay wire & Stay insulator |
| 888 | 11 kv, 5kn pin composite polymer insulator |
| 889 | 11 kv top Brackets 65x65x6mm angle type (each weight-3.0 kg) |
| 890 | 11 kv , 45 kn 16mm frp with 25mm per kv creepage disc polymer long rod type t&c insulator (for 11kv side) |
| 891 | 11 kv composite polymer strain set with hard ware suitable for panther conductor (for 11kv side) |
| 892 | Stone block/pre cast block for base pedding 450x450x75mm |
| 893 | Concreting (1:3:6) of h-beam @ 0.70cmt.per pole including muffing |
| 894 | Concreting (1:3:6) of vcb structures 3.5 cmt per vcb |
| 895 | Concreting (1:3:6) of isolator support structure @ 0.1 cmt. Per structure |
| 896 | M s bolt with nut assorted size |
| 897 | Red-oxide paint |
| 898 | Aluminum paint |
| 899 | 11 KV Hand Gloves (1 Pair=2Nos) |
| 900 | Safety Shoes (1 Pair=2Nos) |
| 901 | Safety Helmet (1 Pair=2Nos) |
| 902 | Earth Discharge Rod -11 kv |
| 903 | Danger board enameled11 kv |
| 904 | Supply & installation of items for 11 KV new Line inside Dharmanagar IE |
| 905 | Full Glavanized Iron Tubular Pole 11 m Long |
| 906 | 11 KV 'V' cross-arms 75x75x6 mm MS Angle -each weight 24.60 Kg |
| 907 | Erection of 100 X 50 X 50 X 6 mm. Galvanised channel duly galvanised as per relevant I.S. on Steel Tubular Pole with supply of clamp (made of 50x6 mm. Gl flat Flat duly galvanised as per relevant I.S), nuts and bolts as required as perdirection of Eng-ln-Charge. (a) Single pole top bracket 0.3 mtr. Long |
| 908 | (b) Double pole line bracket2.20 mtr. Long |
| 909 | Erection of V-cross-arm madeof 70 X 40 X 40 X 6 mm. channel duly galvanised as per relevant I.S. on Steel Tubular Pole with supply of clamp (made of 50x6 mm. Gl flat Flat duly galvanised as per relevant I.S), nuts and bolts as required as per direction of Eng-ln-Charge. |
| 910 | Erection of 65 X 65 X 6 mm. MSangle duly galvanised as perrelevant I.S. on Steel TubularPole srtucture with supply of clamp (made of 50x6 mm. Gl flat duly galvanised as per relevant I.S), nuts and bolts as required as per direction ofEng-ln-Charge (a) 1.6mtr long for single pole guard |
| 911 | (b)2.5 mtr long for double pole guard |
| 912 | (c)1.8 mtr long for horizontal bracing |
| 913 | (d)3.2 mtr long for cross bracing |
| 914 | Erection of Galvanised Stay Set complete direct in earth with 16 mm. dia. 1.8 mtr. long Gl stay rod, anchor plate of size 300 X 300 X 8 mm. thick, turn buckle of length 356 mm. with 300 mm. long threaded adjustable 16 mm. dia. Gl rod , thimble, guy insulator as per IS specification, hot dip (heavy duty) galvanized stay stranded wire of size 7/2.5 mm. fastened with stay clamps as required. ( including supply of Gl clamp & Nuts & Bolts as reqd) and Grouting of stay set with CC of ratio 1 :3:6 (1 cement: 3 river sand: 6 jhama brick aggregate of 20 mm. Nominal size) ilc supply of cement, sand and brick aggregate complete withexcavation, refilling of earth, ramming alongwith centering and shuttering as required ( @ 0.119 Cum per stay set as per TSECLspecification). |
| 915 | Erection of Disc Insulators ( 45 KN as per rlelevant IS) with fittings(2U Bolt type) |
| 916 | Erection of 11 KV pin insulator with Gl pin as per rlelevant IS |
| 917 | Back Clamp (MS Flat 65x8 mm) - each wt 1.92 Kg |
| 918 | 11 KV Top clamps 75x75x6 mm Angle ( each weight 3.58 Kg) |
| 919 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 Mtrs. lead of 4.0 mm. G.I wire) |
| 920 | 11 KV Pin Insulator(Polymer) composite 10KN FRP Dia 33.5mm |
| 921 | ACSR Weasel Covered conductor (50 sq.mm. Al.Eq.) |
| 922 | Jointing Sleeves suitable for 50Sq.mm. conductor |
| 923 | Stay set 20 mm. painted complete with turn buckles |
| 924 | Stay wire 7/4.0 mm. (8.5 kg.stay wire per stay set ) |
| 925 | Clamp (3.04 kg each) |
| 926 | Stay Insulators 90X65mm |
| 927 | Concreting of pole @ 0.9 cmt. per stay including muffing |
| 928 | Concreting of stay (20 mm / 25 mm) @ 0.3 cmt. per stay |
| 929 | Red oxide paint |
| 930 | Aluminium paint |
| 931 | Anti-climbing devices (Barbed wire 2.24 mm dia. 14 SWG) |
| 932 | Danger Boards Enamalled Type 11KV |
| 933 | Binding wire and tape |
| 934 | M.S.Nuts and Bolts |
| 935 | Route Survey of existing line and proposed network |
| 936 | Supply and Installation of below items for installation of 315 KVA, 11/0.4 KV DTR |
| 937 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) 11/0.433KV, 315 KVA Distribution Transformer(As per IS 1180 latest amendment) |
| 938 | Full GI Tubular Pole 11 m Long |
| 939 | D.o.cross-arm of 100 X50X 6 mm. 2.8 Mtr long |
| 940 | Clamp using 65X8 Ms Flat |
| 941 | 11 KV (45KN) 16mm FRP with 25mm per KV creepage Disc Insulator Polymer |
| 942 | 11KV Strain hard ware fitting |
| 943 | 11 KV D.O. fuse & Lightening Arrestor mounting channel (75X 40 X 6 mm.) |
| 944 | 11 KV D.O. fuse unit |
| 945 | 9 KV LA Gapless type ( 5KA) Polymer for DTR |
| 946 | Stay set 16 mm. painted complete with turn buckles |
| 947 | Stay wire 7/3.15 mm. (7.5 kg.stay wire per stay set ) |
| 948 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 949 | Concreting of pole @ 0.50 cmt. per pole with muffing |
| 950 | Concreting of Stay @ 0.2 cmt. per stay |
| 951 | ACSR Conductor Racoon conductor for jumper |
| 952 | Danger Boards Enamalled Type 11KV |
| 953 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 954 | Bi-metallic clamps suitable for 12mm dia. stud LT side |
| 955 | Anti climbing devices (Barbed wire 2.24 mm Dia (14 SWG) (3.5 Kg. wire per pole) |
| 956 | Red oxide paint |
| 957 | Aluminium paint |
| 958 | M.S.Nuts and Bolts |
| 959 | Distribution Box mounting channel (75x40x6 mm.) |
| 960 | L.T. Distribution box suitable for 315 KVA transformer (without TPN switches) with MCCB on incoming and PF units on outgoing side made of SMC |
| 961 | 150 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable |
| 962 | 300 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable |
| 963 | 11 kV, A.B switch (Air Break), 400A with complete fitting. |
| 964 | Earthing with G.l. earth pipe 4.5 mtrs long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr (1 Set= 4Nos) |
| 965 | Supply and erection of all below items for installation of 200 KVA, 11/0.4 KV DTR |
| 966 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New), 11/0.433KV, 200 KVA Distribution Transformer (As per IS 1180 latest amendment) |
| 967 | Full GI Tubular Pole 11 m Long |
| 968 | D.C.cross-arm of 100 X50X 6 mm. 2.8 Mtr long flat channel |
| 969 | Clamp using 65X8 Ms Flat |
| 970 | 11 KV (45KN) 16mm FRP with 25mm per KV creepage Disc Insulator Polymer |
| 971 | 11KV Strain hard ware fitting |
| 972 | 11 KV D.O. fuse & Lightening Arrestor mounting channel (75X 40 X 6 mm.) |
| 973 | 11 KV D.O. fuse unit |
| 974 | 9 KV Gapless type ( 5KA) Polymer for DTR |
| 975 | Transformer mounting DC cross-arm 100 X 50 X6 mm. angle channel |
| 976 | Transformer belting with 50 X 50 X 6 mm.angle with two cross fixing channels |
| 977 | Stay set 16 mm. painted complete with turn buckles |
| 978 | Stay wire 7/3.15 mm. (7.5 kg.stay wire per stay set ) |
| 979 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 980 | Concreting of pole @ 0.50 cmt. per pole with muffing |
| 981 | Concreting of Stay @ 0.2 cmt. per stay |
| 982 | ACSR Conductor Racoon conductor for jumper |
| 983 | Danger Boards Enamalled Type 11KV |
| 984 | Bi-metallic clamps Distribution Transformers Bushing HT side |
| 985 | Bi-metallic clamps suitable for 12mm dia. stud LT side |
| 986 | Anti climbing devices (Barbed wire 2.24 mm Dia (14 SWG) (3.5 Kg. wire per pole) |
| 987 | Red oxide paint |
| 988 | Aluminium paint |
| 989 | M.S.Nuts and Bolts |
| 990 | Distribution Box mounting channel (75x40x6 mm.) |
| 991 | L.T. Distribution box suitable for 200 KVA transformer (without TPN switches) with MCCB on incoming and PF units on outgoing side made of SMC |
| 992 | 150 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable |
| 993 | 300 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable |
| 994 | 11 kV, A.B switch (Air Break), 400A with complete fitting. |
| 995 | Earthing with G.l. earth pipe 4.5 mtrs long & 40 mm dia with masonary enclosure on the top etc as reqd. for Earthing of dtr (1 Set= 4Nos) |
| 996 | Supply & installation of items for Construction of New LT Feeder with ABC 150 sq mm Cable |
| 997 | Full GI MS Tubular Pole 8 m Long |
| 998 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 Mtrs. lead of 4.0 mm. G.I wire) |
| 999 | Painted Stay set 20 mm. complete with turn buckles |
| 1000 | Stay wire 7/4.0 mm. (10 kg.stay wire per stay set ) |
| 1001 | Clamp suitable ( each weight 3.2 kg ms flat 65x8mm) |
| 1002 | Concreting of Pole @0.9 cmt per pole (including Muffing) |
| 1003 | Red oxide paint |
| 1004 | Aluminium paint |
| 1005 | Anti-climbing devices (Barbed wire 2.24 mm Dia. (14 SWG) (3.5 Kg. wire per pole) |
| 1006 | Binding wire and tape |
| 1007 | M.S.Nuts and Bolts |
| 1008 | A.B Cable tension clamps (Galvanized) |
| 1009 | Suspension Clamp with attachment |
| 1010 | Clamp for Neutral |
| 1011 | Piercing connector Type-I for single phase/three phase(Main 70-150 sq.mm. tape- of 50-95 sq.mm) |
| 1012 | Piercing connector Type-II (Main 70-150 sq.mm. tape- of 50-95 sq.mm) |
| 1013 | 1100 Volts Grade Aerial bunched XLPE Cable 3 X 70 + 1 X 50 + 1 X 65 sq.mm. (insulated nuetral massenger) |
| 1014 | 1100 Volts Grade Aerial bunched XLPE Cable 3 X 150 + 1 X 35 + 1 X 95 sq.mm. (insulated nuetral massenger) |
| 1015 | Supply and Installation of Street Light LED Lamps on Street Light Poles with all accessories as below |
| 1016 | Full GI Tubular Pole 11 m Long |
| 1017 | Concreting of pole @ 0.50 cmt. per pole with muffing |
| 1018 | Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 Mtrs. lead of 4.0 mm. G.I wire) |
| 1019 | Supply and Installation LED Lamp Fitting, for Street Light 100 Watt, with polycarbonate glass cover with IP66 enclosure and complete fittings and connection from Pole Junction Box |
| 1020 | Clamps / Arm Brackets / fixing arrangement for Street Light fittings suitable for LED Fixture |
| 1021 | 3 Core 1.5 sq mm unarmoured Cable for Street Light connection |
| 1022 | Junction Box |
| 1023 | Supply and Laying of Street Light Cable 4 Core 10 sq mm armoured underground inside 32 mm MDPE Pipe pipe PN6 |
| 1024 | 32 mm MDPE Pipe pipe PN6 for laying of cable |
| 1025 | Supply and fixing of Post Top LED lamp in main gate with GI Pipe and loop box LED Lamp 120 Watt |
| 1026 | Timer Switch |
| 1027 | Excavation for cable laying |
| 1028 | Route Survey |
| 1029 | Supply and Installation of High Mast Lighting |
| 1030 | Supply of 20 M high mast shaft suitable for 39 m/sec wind speed, with all accessories including foundation bolts, aviation light, feeder pillar & suitable as per illumination design Wiring material,power cables between panel and mast, MCB in base compartment are Not included & shall be in the scope of erection. |
| 1031 | Supply of Non-integral floodlight luminaries LED 250 Watts, 8 No. in each pole HPI/T Plus lamps and its control gear boxes. |
| 1032 | Provision of GI pipe earthing for High mast with 2.5 M long 40 mm dia GI Pipe including connection to High mast earth terminal with 25 x 3 mm GI flats with all materials and labour. (2Nos per mast required) |
| 1033 | Power and Control Panel Outdoor and Environment Protection |
| 1034 | Construction of shallow foundation with M20 grade concrete for the highmast considering the safe soil bearing capacity at site as 10 T/sqmtr at 2 metre depth with all materials and labour. |
| 1035 | Erection and Commissioning of the high mast with all wiring materials. |
| 1036 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Ambient Air Quality Monitoring, Monitoring locations shall cover once before construction and all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component. |
| 1037 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Water Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component. |
| 1038 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Noise Level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component. |
| 1039 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Construction phase-18 months of 1 location, once a quarter (06 samples) of two sector/Component. |
| 1040 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Ambient Air Quality Monitoring, . Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of four sector/Component of two sector/Component. |
| 1041 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Water Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of four sector/Component of two sector/Component. |
| 1042 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Noise Level Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of four sector/Component of two sector/Component. |
| 1043 | Provision for carrying out environmental monitoring within IE through NABL/MoEFCC Accredited Laboratory Soil Quality Monitoring. Monitoring locations shall cover all active construction sites, workforce camp site, material stack yard for Maintenance/ DLP phase- 60 months of 1 location, once in 6 months (10 samples) of four sector/Component of two sector/Component. |
| 1044 | Operation & Maintaince-TSECL works. |
| 1045 | For Dewanpassa Industrial Estate |
| 1046 | For Kumarghat Industrial Estate |
| 1047 | For Dharmanagar Industrial Estate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender