Drinking Water Supply and Sanitation Government Departments Closing in 12 days TDR #57673921

Tender For Estimate For Concrete Lining Of 1-R Disty From Rd 85300 - 92500 (Tail) Including Reconstruction Of Fall Cum Vr Bridge At Rd 85300 & Vr Bridge At Rd 87930 And Construction Of Fall At Rd 89750 Of 1-R Disty

Issued by Government Departments · Ludhiana, Punjab
Tender Value
1.50 Crore
Estimated cost
Bid Submission
08 Oct 2026
12 days left
EMD
3 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ludhiana → Punjab
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Estimate For Concrete Lining Of 1-R Disty From Rd 85300 - 92500 (Tail) Including Reconstruction Of Fall Cum Vr Bridge At Rd 85300 & Vr Bridge At Rd 87930 And Construction Of Fall At Rd 89750 Of 1-R Disty

BOQ

Name of Work:- Estimate for concrete lining of 1-R Disty from RD 85300 - 92500 (tail) including reconstruction of Fall cum VR Bridge at RD 85300 & VR Bridge at RD 87930 and construction of Fall at RD 89750 of 1-R Disty
Sl. No. Item Description
1Ordinary jungle clearance of both banks of running Disty. Minors and Drains includind boundary road with discharge upto 1.5 cumecs.
2Excavation of soil (any type) using hydraulic excavator and CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr.
3Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all lifts and leads (excluding royality.)
4Ordinary earth/clay taken from private land including compensiation but excludingroyality.
5Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing & including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions
6Dressing of Earthwork (New work or remodeling work.)
7Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
8Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 1.5 mtr depth but upto 3.0 m depth.
9Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.
10Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
11Dag Belling single kassi stroke complete in all respect
12Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes
13Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)(For Side Slopes)
14Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)(For Coping)
15Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)(For Sleepers)
16Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications.
17Filling of construction/Contraction Joints with sealing compound including supply, carriege of material complete in all respect as per design/ drawing and PWD specifications
18Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications
19Extra bitumen painting at 0.69 per sqm (on sleeper) . Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
20Providing & laying 250 mm wide LDPE Film 150 micron over sleepers
21Dismantling brick work, tile masonry or tile lining (in cement mortar)
22Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
23Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
24Dismantling of pre-stressed / RCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
25Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with excavated surplus soil Depth 0-3 mtr
26Sand Filling in Foundation Trenches as per Drawing & Technical Specification
27Plain cement concrete M-15 Grade in sub-structure complete as per drawing and Technical Specifications Height upto 5m.
28Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
29Plain/Reinforced cement concrete grade M25 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
30Plain/Reinforced cement concrete RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump in sub-structure complete as per drawing and Technical Specifications Height upto 5m
31Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
32Supplying, fitting and placing HYSD bar reinforcement in sub- structure complete as per drawing and Technical Specifications.
33Preparing watering and ramming surface for laying concrete, for irrigation channels horizontally.
34Providing & fixing 25 mm thick and 250 mm wide compressible fiber board in expansion joint complete as per drawing and technical clause 2605 of MORT&H specifications.
35Providing and filling joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings and technical clause 2605 of MORT&H specifications.
36Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
37Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. 110mm o/d PVC pipe of 2.5 Kgf. /sqcm
38Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
39Supplying & laying dry brick ballast
40Earth work for dismentalling or construction of new pipe outlet including Excavation, refilling, consolidation and dressing channel discharge upto 1.5 cum
41Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling, consolidation and dressing )
42Adjusting new APM Block in correct \\"y\\" & fixing in position (in case of new outlet where no dismentling and reconstructing of gollet wall is involved
43Laying cement concrete 1:4:8 with gauge 40mm mixing by mechanical means using concrete mixer volumetric type
44First class burnt brick work laid in cement sand mortar 1:4 in foundations & plinth
45Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
46Cold twisted detormed (Ribbed/ ToR Steel Bar) Bars (Fe 500 grade as per IS 1786-2005) , for R.C.C works, where not including in the complete rate of RCC including bending and biding placing in position complete
47Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
48Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.20 ft = 6.1 cm (min wt 65 kg))
49Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.25 ft= 7.6 cm (min wt 68 kg))
50Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.32 ft= 9.9 cm (min wt 72 kg))
51Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.40 ft= 12.2 cm (min wt 76 kg))
52Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 50mm i/d
53Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 65mm i/d
54Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 80mm i/d
55Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 100mm i/d
56Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. upto 100 mm inside diameter Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57673921
AUTHORITY Government Departments
TENDER VALUE 1.50 Crore
LAST DATE 08-10-2026
Authority
Authority Name Water Resources Department
Work Description Tender for Estimate For Concrete Lining Of 1-R Disty From Rd 85300 - 92500 (Tail) Including Reconstruction Of Fall Cum Vr Bridge At Rd 85300 & Vr Bridge At Rd 87930 And Construction Of Fall At Rd 89750 Of 1-R Disty
Basic Detail
Tender No 14/2026-27
Bidding Type Tender
Location
City Ludhiana
State Punjab
Key Dates
Publish Date 23 Sep 2026
Submission Date 08 Oct 2026
Open Date 08 Oct 2026
Finance
Tender Value 1.50 Crore
Tender Fee 2000
EMD 3 Lakhs
Exemption Available
Document List
b68c449c-6baf-4688-bf20-f965a133b335.html
BOQ_358338.xls
Tendernotice_1 (20).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 08, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Oct 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

b68c449c-6baf-4688-bf20-f965a133b335.html

xls

BOQ_358338.xls

pdf

Tendernotice_1 (20).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender