Supply, Installation, Testing & Commissioning of Complete Set comprising of Automation of Acid Dilution, Filling & Neutralization Process of LMLA Battery during POH at Battery/Cell Section at C & W Workshop, Eastern RAilway, Liluah.
Tender Overview
Project Description
Tender for Supply, Installation, Testing & Commissioning Of Complete Set Comprising Of Automation Of Acid Dilution, Filling & Neutralization Process Of Lmla Battery During Poh At Battery/Cell Section At C & W Workshop, Eastern Railway, Liluah. , - (I) Supply ,Installation , Testing & Commissioning Of Automation Of Sulphuric Acid Dilution Plant Of Capacity 1000 Liters Mixes Concentrated Sulfuric Acid (Typically 98%) With Demineralized Water To Produce Customized Lower Concentrations.(A) Dilution Chamber/Mixer: Blends The Concentrated Acid And Water Under Controlled Turbulence.(B) Heat Exchanger: Cools The Highly Exothermic (Heat-Releasing) Mixture, Often Using Graphite Or Shell-And-Tube Designs Paired With A Chiller Or Cooling Tower. (C) Metering Pumps & Valves: Accurately Dose Precise Ratios Of Acid And Distilled Water. (D) Control Panel (Plc/Hmi): Automated The Dilution Process And Monitoring Parameters Like Concentration, Density And Temperature In Real Time.(S= 2280000.00, L= 0.00 ) , - (Ii) Supply ,Installation , Testing & Commisioning Of Automation Of Sulphuric Acid Neutralization Plant Of Capacity 1000 Ltrs.: Designed To Treat Acidic Waste Water Or Waste Streams Containing Sulphuric Acid By Adding Alkaline Chemicals To Raise The Ph To A Safe & Regulated Level. (A) Automated Control: Systems Use Continuous Ph Meters And Automated Chemical Metering Pumps For Precise Bi-Directional Ph Control. (B) Exothermic Management: Because Mixing Concentrated Acid And Water Generates Extreme Heat, Designs Incorporate High-Temperature Resilience And Process Cooling. (S= 1400000.00, L= 0.00) , - (Iii) Supply ,Installation , Testing & Commisioning Of Semi-Automated Acid Filling Machine: (A) Acid Filling Orifice:6 Nos. (B) Acid Filling Mode: Measure Cup (C) Manual Mode: Adjust Acid Orifice Position And Check Acid Filling Capacity (D) Automatic Mode: Fill Acid Automatically Acid Filling Capacity: 1000 10000 Ml. (E)12V Single Battery At Time (F) Machine Body Structure: Ss 316L (G) Acid Tank: Pp Or Pvc (S= 1050000.00, L= 0.00) Note: The Awarded Firm Has To Submit The Detailed Drawing Based On The Joint Survey Report Drawn Between The Firm & The Railway Representative At The Battery Section Within Premises Of This Workshop. After Approval Of The Detailed Drawingthe Commissioning Work Of The Complete Set Will Commence Work Of The Complete Set Will Be Commenced; A Number Of Trial Runs Of The Complete Sets Are To Be Done In The Presence Of The Railway Authority. If The Railway Authority Requires Any Customisation, The Firm Must Incorporate It At The Railway Premises, Along With All Necessary Accessories For The Installation Site, And The Cost For The Modifications Is Already Included In The Offered Rate. After Successful Trial Runs By Your Representative, Railway Staff Will Be Trained For The Complete Procedure. , - Gst @ 18%
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender