Tender For Upgradation Of The 10 Numbers Of Hostel Room At Cab, Rbi, Pune.
Tender Value
49.12 Lakhs
Estimated cost
Bid Submission
08 Oct 2026
7 days left
EMD
98244
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Upgradation Of The 10 Numbers Of Hostel Room At Cab, Rbi, Pune.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of brick walls including dado, plaster, all fittings & fixtures, plumbing line (all types of G.I, C.I, & PVC lines) up to vertical duct, flooring, wash basin, false ceiling, sunken area, filled material, doors including frames, etc. in Toilet block area of hostel room.Carefully dismantling of the above said items up to the desire surface i.e. RCC slab or up to the brick wall. after dismantling cleaning the horizontal and vertical surfaces of the walls / sunken area, inclusive of racking out joints in brick masonry works after disconnecting and removing existing G.I., C.I. pipes (both exposed and concealed ) etc. up to vertical stack along with G.I / C.I. fittings and fixtures such as bib cocks, stop cocks, flush cocks, wash basins with all fittings including brackets, flush tank, ewc/iwc/owc, P or S traps, nahani traps, towel rod, mirror, soap holder etc. completed as directed by Bank's Engineers. Brick wall - approximate quantity 1.40 CmtDado tiles dismantling - approximate quantity 13.50 SqmFalse Ceiling - approximate quantity 15.00 SqmFlooring dismantling including filled up materials upto slab level, approximate depth 0.23 to 0.30 mt. and area 4.50 Sqm |
| 2 | Integral Water-Proofing Treatment: Providing and laying integral cement based water-proofing treatment in sunken area of Toilet blocks as per following specifications:i) Thoroughly cleaning of RCC surfaces, raking out joints of brickwork and carrying out necessary cement grouting if required in RCC slab and in floor-wall joints wherever required as directed by Bank’s Engineer.ii) If any cracks may found in the RCC slab of bath / w/c / kitchen shall be treated by making V groove and filled with cement grout mixed with SBR/ Polymer modified mortar as per the manufacturer’s specifications.iii) Providing and applying cement slurry duly mixed with approved waterproofing compound in recommended proportion as per manufacturer’s specification to horizontal and vertical surfaces of sunken area all over the surface as per site requirement.iv) Applying average 20 mm thick smooth finished waterproof cement plaster in cement mortar 1:3 admixed with approved waterproofing compound/admixture (1kg per 50 kg of cement) to sunken area (all faces) including providing rounding at junction of floor & wall and finishing the plastered surface, all necessary tools, labour, watering, curing, etc. The treatment shall be continued above floor level up to a minimum height of 300 mm on the walls. The waterproof plaster as above shall also be done on the top of waterproof brick bat coba, before flooring tiles are laid.v) Providing and applying waterproof chemical coating in two coats with approved waterproofing compound as per manufacturer`s specifications on finished waterproof plaster surface.vi) The waterproof surface shall be left for testing by ponding water in treated area for at least 72 hrs so as to ensure that no leakages or seepage of water is seen from treated areavii) The entire sunken portion shall be filled by providing and laying brickbat coba in cement mortar of 1 : 4 proportion (1 part cement : 4 parts screen sand) using well burnt brickbats in required layers and properly admixed with approved quality integral waterproofing compound / liquid admixture as per the manufacturer’s specifications. The joints of brick-bats shall be suitably staggered.viii) The rate shall be inclusive of all required material, labour, transportation, loading-unloading, scaffolding, tools & plants, wastage if any, making good damages to match with surroundings surface, carrying out work in workman like manner at all lead and lift,, curing wherever required, carting away debris out of the premises and dispose the same at the approved places/ site as per local laws without any cost to the Bank etc. complete as directed. The performance Guarantee of 10 years as stamp paper for entire treated area for waterproofing hence to be furnished by the contractor as per Bank’s Performa which will reckon from the date of completion of the work. Please Enable Macros to View BoQ information |
| 3 | Integral Water-Proofing Treatment: Providing and laying integral cement based water-proofing treatment in sunken area of Toilet blocks as per following specifications:i) Thoroughly cleaning of RCC surfaces, raking out joints of brickwork and carrying out necessary cement grouting if required in RCC slab and in floor-wall joints wherever required as directed by Bank’s Engineer.ii) If any cracks may found in the RCC slab of bath / w/c / kitchen shall be treated by making V groove and filled with cement grout mixed with SBR/ Polymer modified mortar as per the manufacturer’s specifications.iii) Providing and applying cement slurry duly mixed with approved waterproofing compound in recommended proportion as per manufacturer’s specification to horizontal and vertical surfaces of sunken area all over the surface as per site requirement.iv) Applying average 20 mm thick smooth finished waterproof cement plaster in cement mortar 1:3 admixed with approved waterproofing compound/admixture (1kg per 50 kg of cement) to sunken area (all faces) including providing rounding at junction of floor & wall and finishing the plastered surface, all necessary tools, labour, watering, curing, etc. The treatment shall be continued above floor level up to a minimum height of 300 mm on the walls. The waterproof plaster as above shall also be done on the top of waterproof brick bat coba, before flooring tiles are laid.v) Providing and applying waterproof chemical coating in two coats with approved waterproofing compound as per manufacturer`s specifications on finished waterproof plaster surface.vi) The waterproof surface shall be left for testing by ponding water in treated area for at least 72 hrs so as to ensure that no leakages or seepage of water is seen from treated areavii) The entire sunken portion shall be filled by providing and laying brickbat coba in cement mortar of 1 : 4 proportion (1 part cement : 4 parts screen sand) using well burnt brickbats in required layers and properly admixed with approved quality integral waterproofing compound / liquid admixture as per the manufacturer’s specifications. The joints of brick-bats shall be suitably staggered.viii) The rate shall be inclusive of all required material, labour, transportation, loading-unloading, scaffolding, tools & plants, wastage if any, making good damages to match with surroundings surface, carrying out work in workman like manner at all lead and lift,, curing wherever required, carting away debris out of the premises and dispose the same at the approved places/ site as per local laws without any cost to the Bank etc. complete as directed. The performance Guarantee of 10 years as stamp paper for entire treated area for waterproofing hence to be furnished by the contractor as per Bank’s Performa which will reckon from the date of completion of the work. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysOct 09, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender