Drinking Water Supply and Sanitation Government Departments Closing in 4 days TDR #57664458

Tender For External Power Supply To Intakewell,Wtp And Pump Houses In Connection With The Work Augmentation Of Water Supply To Tusura Town.

Issued by Government Departments · Balangir, Odisha
Tender Value
4.20 Crore
Estimated cost
Bid Submission
07 Oct 2026
4 days left
EMD
4.20 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Balangir → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for External Power Supply To Intakewell,Wtp And Pump Houses In Connection With The Work Augmentation Of Water Supply To Tusura Town.

BOQ

Name of Work:- External power supply to Intakewell,WTP and pump houses in connection with the work Augmentation of water supply to Tusura Town.
Sl. No. Item Description
1A. INTAKE SITE -a)11 KV DP with 1 Nos ABS 11 mtr RSJ/PSC-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
2Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
3Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
4Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
5Supplying all materials ,labour T&P for Erection/fixing of Fish plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
6Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70KN including Transportation ,Stock ,storage and insurance all complete as per direction of EIC.
7Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
8Supplying all materials ,labour T&P for Erection/fixing of PG Clamp for 100mmsq AAA Conductor including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
9Supplying all materials ,labour T&P for Erection/fixing of GI Flat 50x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
10Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
11Supplying all materials ,labour T&P for Erection of 11 KV 400 Amp lsolator with earth switch including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
12Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
13Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
14Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
15Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
16Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
17Supplying all materials ,labour T&P for Erection/fixing of 7/8 SWG GI wire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
18Supplying all materials ,labour T&P for installation of 40MM G.I. Pipe Earthing 3mtr. Long (OD/ID-4 including transportation, Stock ,storage and insurance all complete as per direction of EIC.
19Supplying all materials ,labour T&P for laying of Pipe HDPE (25 mm) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
20Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 70 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
21Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 95 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
22Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
23Supplying all materials ,labour, T&P for masonry work for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
24Supplying charcoal,salt etc. for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
25Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
26Supplying all materials ,labour T&P for Erection/fixing of Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
27ESTIMATE OF SERVICES-11 KV DP with 1 Nos ABS 11 mtr RSJ/PSC.Supplying all materials ,labour T&P for Fabrication & Galvanisation work including transportation of materials all complete as per direction of EIC.
28Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
29Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
30b) 11kV Line AAAC tapping on RSJ/PSC Pole-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
31Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
32Supplying all materials ,labour T&P for Erection of 11KV V-cross Arm(MS)(10.2Kg each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
33Supplying all materials ,labour, T&P for Erection/fixing of Back CLAMP(1.70Kg) FOR V-cross Arm including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
34Supplying all materials ,labour, T&P for Erection/fixing of 11KV F CLAMP (2.9Kg/Each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
35Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
36Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
37Supplying all materials ,labour T&P for Erection/fixing of PG Clamp for 100mmsq AAA Conductor including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
38Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
39Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
40Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
41Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
42Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
43Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
44Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
45ESTIMATE OF SERVICES-11kV Line AAAC tapping on RSJ/PSC Pole-Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
46Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
47c)11 KV Line 55 Sqmm insulated AAAC-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
48Supplying all materials ,labour T&P for stringing of 55mm² AAAC Insulated Covered Conductor with All Common Material including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
49Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
50Supplying all materials ,labour T&P for Erection of 11KV V-cross Arm(MS)(10.2Kg each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
51Supplying all materials ,labour, T&P for Erection/fixing of Back CLAMP(1.70Kg) FOR V-cross Arm including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
52Supplying all materials ,labour, T&P for Erection/fixing of 11KV F CLAMP (2.9Kg/Each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
53Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
54Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) for Disc I including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
55Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
56Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
57Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
58Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
59Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
60Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
61Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
62Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
63Supplying all materials ,labour T&P for Erection/fixing of Pipe Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
64ESTIMATE OF SERVICES-11 KV Line 55 Sqmm insulated AAAC-Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
65Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
66Supplying all materials ,labour T&P for Fabrication & Galvanisation work all complete as per direction of EIC.
67d)11 KV Metering Unit on PSC/RSJ DP Structure-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
68Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
69Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
70Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
71Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
72Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) for Disc I including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
73Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
74Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
75Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
76Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
77Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
78Supplying all materials ,labour T&P for installation of 40MM G.I. Pipe Earthing 3mtr. Long (Medium gauge) including transportation, Stock ,storage and insurance all complete as per direction of EIC.
79Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
80Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
81Supplying all materials ,labour, T&P for masonry work for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
82Supplying charcoal,salt etc. for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
83Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
84Supplying all materials ,labour T&P for Erection/fixing of Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
85Supplying all materials ,labour, T&P for laying/Stringing of 2.5 mmsq 10 core Control cable including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
86ESTIMATE OF SERVICES-11 KV Metering Unit on PSC/RSJ DP Structure-Supplying all materials ,labour T&P for Fabrication & Galvanisation work all complete as per direction of EIC.
87Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
88Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
89e)Construction of plinth mounted Sub-Station (standby S/S) for installation of 160/250 KVA DTR- Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
90Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator( Polymer) 70KN including Transportation ,Stock ,storage and insurance all complete as per direction of EIC.
91Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (T&C) 45KN for Disc I including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
92Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator B&S(T&C) Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
93Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
94Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
95Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
96Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
97Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
98Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
99Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
100Supplying all materials ,labour T&P for Erection,testing,commissioning of 250 KVA,11/0.4KV(Cu)Transformer with tap changer, BIS Energy level-II including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
101Supplying all materials ,labour, T&P for Erection,commissioning of LT Distribution Box with MCCB, Aluminium Busbar for 6 Bay with kit kat fuse for 160KVA S/S including testing and commisioning,tranportation,Stock ,storage and insurance all complete as per direction of EIC.
102Supplying all materials ,labour T&P for Erection of 11 KV ,400 Amp,3Pole,50Hz with earth AB switch including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
103Supplying all materials ,labour T&P for Erection of 11 KV ,400 Amp,3Pole,50Hz DD Fuse with PI including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
104Supplying all materials ,labour T&P for Erection of 11 KV ,20 Amp,3Pole,50Hz DD Fuse link including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
105Supplying all materials ,labour T&P for Erection/fixing of 11 KV LA 12KV-10KA including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
106Supplying all materials ,labour T&P for Erection/fixing of GI Flat 50x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
107Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
108Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
109Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
110Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 70 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
111Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 95 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
112Supplying all materials ,labour T&P for Erection/fixing of Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
113Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing(2Kg per support) including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
114ESTIMATE OF SERVICES-Plinth mounted Sub-Station (standby S/S) for installation of 160/250 KVA DTR-Construction of Earthing Chamber including installation of earthing pipe.Making earthing Chamberincluding excavation, soil treatment with bentonide powder , calculation of earth resistance,including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe.
115Supplying all materials ,labour, T&P for laying/stringing of LT XLPE Cable as per IS 7098(Part 1) 1988( armoured)(Polycab/Havells/Finolex) including testing and commisioning,transportation,Stock ,storage and insurance all complete as per direction of EIC.
116Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
117Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
118Supplying all materials ,labour T&P for construction of ACB/LTDB Plinth all complete as per direction of EIC.
119Supplying all materials ,labour T&P for construction of boundary wall fencing with MS gate provision for 160/250 XVA Plinth mounted S/S all complete as per direction of EIC.
120Supplying all materials ,labour T&P for construction of Plinth for 250KVA transformer including transportation of materials all complete as per direction of EIC.
121B. WTP -a)11 KV DP with 1 Nos ABS 11 mtr RSJ/PSC-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
122Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
123Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
124Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
125Supplying all materials ,labour T&P for Erection/fixing of Fish plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
126Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70KN including Transportation ,Stock ,storage and insurance all complete as per direction of EIC.
127Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
128Supplying all materials ,labour T&P for Erection/fixing of PG Clamp for 100mmsq AAA Conductor including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
129Supplying all materials ,labour T&P for Erection/fixing of GI Flat 50x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
130Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
131Supplying all materials ,labour T&P for Erection of 11 KV 400 Amp lsolator with earth switch including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
132Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
133Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
134Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
135Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
136Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
137Supplying all materials ,labour T&P for Erection/fixing of 7/8 SWG GI wire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
138Supplying all materials ,labour T&P for installation of 40MM G.I. Pipe Earthing 3mtr. Long (OD/ID-4 including transportation, Stock ,storage and insurance all complete as per direction of EIC.
139Supplying all materials ,labour T&P for laying of Pipe HDPE (25 mm) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
140Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 70 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
141Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 95 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
142Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
143Supplying all materials ,labour, T&P for masonry work for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
144Supplying charcoal,salt etc. for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
145Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
146Supplying all materials ,labour T&P for Erection/fixing of Pipe Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
147ESTIMATE OF SERVICES-11 KV DP with 1 Nos ABS 11 mtr RSJ/PSC.Supplying all materials ,labour T&P for Fabrication & Galvanisation work including transportation of materials all complete as per direction of EIC.
148Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
149Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
150b) 11kV Line AAAC tapping on RSJ/PSC Pole-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
151Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm for straight cross arm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
152Supplying all materials ,labour T&P for Erection of 11KV V-cross Arm(MS)(10.2Kg each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
153Supplying all materials ,labour, T&P for Erection/fixing of Back CLAMP(1.70Kg) FOR V-cross Arm including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
154Supplying all materials ,labour, T&P for Erection/fixing of 11KV F CLAMP (2.9Kg/Each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
155Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
156Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
157Supplying all materials ,labour T&P for Erection/fixing of PG Clamp for 100mmsq AAA Conductor including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
158Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
159Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
160Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
161Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
162Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
163Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
164Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
165ESTIMATE OF SERVICES-11kV Line AAAC tapping on RSJ/PSC Pole-Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
166Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
167c) 11kV SP cutpoint 9 mtr long 300 KG PSC-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
168Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm for straight cross arm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
169Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
170Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
171Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
172Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
173Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
174Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
175Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
176Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
177Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
178ESTIMATE OF SERVICES-11kV SP cutpoint 9 mtr long 300 KG PSC-Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
179Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
180d)11 KV Line 55 Sqmm insulated AAAC-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
181Supplying all materials ,labour T&P for Stringing of 55mm² AAAC Insulated Covered Conductor with All Common Material including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
182Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
183Supplying all materials ,labour T&P for Erection of 11KV V-cross Arm(MS)(10.2Kg each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
184Supplying all materials ,labour, T&P for Erection/fixing of Back CLAMP(1.70Kg) FOR V-cross Arm including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
185Supplying all materials ,labour, T&P for Erection/fixing of 11KV F CLAMP (2.9Kg/Each) including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
186Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
187Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) for Disc I including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
188Supplying all materials ,labour T&P for Erection/fixing of 11KV Pin Insulator Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
189Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
190Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
191Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
192Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
193Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
194Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
195Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
196Supplying all materials ,labour T&P for Erection/fixing of Pipe Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
197ESTIMATE OF SERVICES-11 KV Line 55 Sqmm insulated AAAC-Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
198Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
199Supplying all materials ,labour T&P for Fabrication & Galvanisation work including transportation of materials all complete as per direction of EIC.
200Supplying all materials ,labour, T&P for erection,stringing of Cradle guard for road crossing including transportation of materials all complete as per direction of EIC.
201e)11 KV Metering Unit on PSC/RSJ DP Structure-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
202Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
203Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
204Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
205Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70KN including Transportation ,Stock ,storage and insurance all complete as per direction of EIC.
206Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
207Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
208Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
209Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
210Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
211Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
212Supplying all materials ,labour T&P for installation of 40MM G.I. Pipe Earthing 3mtr. Long (OD/ID-4 including transportation, Stock ,storage and insurance all complete as per direction of EIC.
213Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
214Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
215Supplying all materials ,labour, T&P for masonry work for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
216Supplying charcoal,salt etc. for Earthing Pit for Pipe Earthing including all complete as per direction of EIC.
217Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
218Supplying all materials ,labour T&P for Erection/fixing of Pipe Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
219Supplying all materials ,labour, T&P for laying/Stringing of 2.5 mmsq 10 core Control cable for MU including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
220ESTIMATE OF SERVICES-11 KV Metering Unit on PSC/RSJ DP Structure-Supplying all materials ,labour T&P for Fabrication & Galvanisation work all complete as per direction of EIC.
221Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
222Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
223f)Construction of plinth mounted Sub-Station (standby S/S) for installation of 160/250 KVA DTR-Supplying all materials ,labour T&P for Erection of 11mtr Long 150x150 RS Joist Pole(34.6Kg/Meter) ( SAIL/JINDAL/TATA Make)including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
224Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator, Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
225Supplying all materials ,labour T&P for Erection/fixing of 11KV HW Fitting (B&S Type) 70KN (Single) for Disc I including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
226Supplying all materials ,labour T&P for Erection/fixing of 11KV Disc Insulator B&S(T&C) Polymer 70 KN including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
227Supplying all materials ,labour T&P for Erection of MS Channel 100x50x6mm-4.5mtr. Long, 8 Nos including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
228Supplying all materials ,labour T&P for Erection of Bracing Channel 75x40x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
229Supplying all materials ,labour T&P for Erection of Bracing Channel 50x50x6mm- 8x4mtr. Long. including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
230Supplying all materials ,labour T&P for Erection/fixing of H.T.Stay set complete including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
231Supplying all materials ,labour T&P for Erection/fixing of HT Stay Insulator including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
232Supplying all materials ,labour T&P for Erection/fixing of HT Stay Clamp including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
233Supplying all materials ,labour T&P for Erection/fixing of 7/10 SWG Staywire including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
234Supplying all materials ,labour T&P for Erection,testing,commissioning of 250 KVA,11/0.4KV(Cu)Transformer with tap changer, BIS Energy level-II including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
235Supplying all materials ,labour, T&P for Erection,commissioning of LT Distribution Box with MCCB, Aluminium Busbar for 6 Bay with kit kat fuse for 160KVA S/S including testing and commisioning,tranportation,Stock ,storage and insurance all complete as per direction of EIC.
236Supplying all materials ,labour T&P for Erection of 11 KV ,400 Amp,3Pole,50Hz with earth AB switch including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
237Supplying all materials ,labour T&P for Erection of 11 KV ,400 Amp,3Pole,50Hz DD Fuse with PI including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
238Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
239Supplying all materials ,labour T&P for Erection/fixing of 11 KV LA 12KV-10KA including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
240Supplying all materials ,labour T&P for Erection/fixing of GI Flat 25x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
241Supplying all materials ,labour T&P for Erection/fixing of GI Flat 50x6mm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
242Supplying all materials ,labour T&P for Erection/fixing of GI Nuts, bolt & Washer including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
243Supplying all materials ,labour, T&P for Erection/fixing of EARTHING COIL including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
244Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 70 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
245Supplying all materials ,labour, T&P for fixing of Aluminium Cable Socket 95 sqmm including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
246Supplying all materials ,labour T&P for Erection/fixing of Danger Plate including Transportation,Stock ,storage and insurance all complete as per direction of EIC.
247Supplying all materials ,labour T&P for Erection/fixing of GI Barbered wire for anticlimbing(2Kg per support) including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.
248ESTIMATE OF SERVICES-Plinth mounted Sub-Station (standby S/S) for installation of 160/250 KVA DTR-Construction of Earthing Chamber including installation of earthing pipe.Making earthing Chamberincluding excavation, soil treatment with bentonide powder , calculation of earth resistance,including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe.
249Supplying all materials ,labour, T&P for laying/stringing of LT XLPE Cable as per IS 7098(Part 1) 1988( armoured)(Polycab/Havells/Finolex) including testing and commisioning,transportation,Stock ,storage and insurance all complete as per direction of EIC.
250Supplying all materials ,labour T&P for placing of Concrete materials for stay anchor plate including transportation of materials all complete as per direction of EIC.
251Supplying all materials ,labour T&P for construction of Padding and concreting materials for support including transportation of materials all complete as per direction of EIC.
252Supplying all materials ,labour T&P for construction of ACB/LTDB Plinth all complete as per direction of EIC.
253Supplying all materials ,labour T&P for Construction of boundary wall fencing with MS gate provision for 160/250 XVA Plinth mounted S/S all complete as per direction of EIC.
254Supplying all materials ,labour T&P for construction of Plinth for 250KVA transformer including transportation of materials all complete as per direction of EIC.
255Processing fee deposit
256Inspection fee for HT Line deposit
257Drawing approval deposit
258C. Breaker room and other ancilliary work at Intake well and WTP-Single under reamed pile foundation with RCC M25 using 20mm & downgrade size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel reinforcement by welding. Single under Ream Pile-a) 375 mm dia and 6.0 metre long
259Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge. Pile cap Rectangular portion
260Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour etc all complete as per direction of the Engineer-in-Charge.
261Cement concrete (1:3:6) with 4cm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete as per direction of the Engineer-in-Charge.
262R.C.C work in ground floor of M-25 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . Ground floor
2631st floor
264Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.Pile cap
265Column
266Waist slab
267Landing slab
2681st floor- Roof beam
269Roof slab
270Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification etc all complete as per direction of the Engineer-in-Charge. Ground floor
271First floor
272D.Automation for WTP & CWR Main Control PLC System-Supply & Installation,testing & Commissioning of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following technical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbidity Analyser, Measurement range-0.000 to 4000 NTU, Process temperature: 0 TO 60 C, Process pressure: 0 to 4 bar all complete as per specification and direction of Engineer-in-charge Make- Forbes Marshall, Tethys, Horiba, Siemens
273Design, Supply, Installation, Testing, Wiring, Programming & Commissioning of Indoor type PLC panel with standby processor and bus adapter for WTP Control Room Operation, including filterbed common applications like Blower & backwash tank loading pumps ON/OFF, Made out of 2 MM C.R sheet, Encloser of Size 800MM*600MM*1800MM, Duly 7 tank processed Powder coated, Floor standing, Front operated, Rear wiring, complete with interconnection with copper wire and lugs, 32A 15KA MCB - 1 nos, 96 nos. DI and DC powered Transistor/Relay based 32 nos. DO, 48 nos AI & 20 nos. AO Ethernet PLC Module, 35 Microsecond Response time for DI/DO Switch on/off. Ambient air tempature upto 50 0C having 2 ethernet & USB host device 24VDC type- 1 Nos (Make- Siemens, ABB, Schneider, Rockwell). 16/8 channel DI, 8 channel DO, 8/4 channel AI & 4 channel AO to be considered for meeting the IO requirements. Required DP & SP MCB for Indivisual Modules. 24VDC 1no. C/O type slim Relay with LED for Digital out put - 40 Nos (make-ABB, Wago, Phoenix, P&F). 5 Ch Unmanaged Industrial Grade Switch- 1 Nos. (Make- CISCO, Schneider, Siemense, Allen Bradley, D-Link) .4G ethernet TCP/IP-Modbus Industrial Grade GSM Router - 1 Nos (make- Robustel, Teltonika, USR). 1.5 mmFuse TB with 0.5A glass fuse with Fuse blown indicator type Terminal Block for Digital Input/analog output- sufficient Nos. 1.5 mm Terminal block for Digital Output - sufficient Nos. (Make- Wago, Phoenix Contact). 24VDC powered signal isolator for Analog Input - sufficient Nos. (Wago, Omron, Phoenix, Connectwell), 24 VDC 10Amp SMPS - 2 nos., 12V DC 6Amp SMPS - 1 no., Color Coded Terminal Blocks for AC/DC/earth Bus/TB - sufficient Nos.(Make- Wago, Phoenix Contact, Omron, Connectwell), 2/4/6 Amp AC/DC MCB- sufficient nos All switchgear and controlgear make- Siemens, Schneider, ABB, L&T. all complete as per electrical specification and as per direction of EIC.
274Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charger unit with battery rack and maintenance free battery system including cables power plug, switch having application in 3nos 12Volt 65Ah DC Battery (drytype) charging to output continious 8 hrs power backup all complete as per specification and direction of Engineer-in-charge
275Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete as per specification and direction of Engineer-in-charge
276Design, manufacture, supply, installation, testing and commissioning of SCADA System(Make-Schiender/Siemen/fox) for WTP Plant, Sand Filter beds & pump house. Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares. PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW, Rs232 & Rs485 port, 2 RJ45 ports, Keyboard, Optical Mouse, 32 inch color TFT Monitor, Latest Windows Pro OS, Microsoft Office & Antivirus & Internet Sequrity software for 3 years license. SCADA Software of reputed company with developer & runtime license with minimum 512 number of Tags with following features & functions. 1. Supervise real-time data in the form of graphical presentation.2. Control WTP processes locally or through Remote locations. 3. Dynamic process Graphic, It should resemble the process mimic. SCADA should have good library of symbols so that develop the mimic as per required. When operator sees the screen he should know what’s going in plant. 4. Alarm summery & Alarm history, SCADA system must be able to detect, display, and log alarms and events. When there are problems the SCADA system must notify the operators to take corrective action. 5. Acquire real-time data as well as logs data with Real time trend & Historical time trend. 6. Web Connectivity, Real-time displays can be accessed on remotely attached PCs and notebooks using internet.SCADA Programming shall be done so as operator can visualize and control complete WTP operation from operator desk. All important alarms & events shall be logged. All the data from field instruments & equipments shall be logged. There shall be provision to take reports in required formats of real time & historical data, events & alarms. There shall be provision of broadcasting messages, emails of reporting information. There shall be provision of access sequrity. An Industrial grade Din rail mounting ethernet switch with 5 ports shall be provided. An Industrial grade modem with 4G/5G GSM connectivity shall be provided.
277Supply,Installation & Commissioning of SCADA PC commercial Desktop I5 12gen /8gb/1tb/w11 professional/24\\" display for engineering station all complete as per specification and direction of Engineer-in-charge(make- Dell, HP, Lenovo, Asus)
278Supply, Installation & Commissioning of 43\\" LED TV for SCADA PC Extension for operator station all complete as per specification and direction of Engineer-in-charge
279Supply, Installation & Commissioning of HP Laser Mono Computer Printers for A4 paper size(HP LaserJet Pro 4004d) all complete as per specification and direction of Engineer-in-charge
280Supply & Commissioning of Internet Modem with static IP for data communication all complete as per specification and direction of Engineer-in-charge
281Supply, Installation & Commissioning of of CAT-6 Dlink cable all materials, labour,T&P for Laying of CAT-6 cable either in HDPE duct underground or GI wire support in case of hanging all complete as per specification and direction of Engineer-in-charge
282Open channel type ultrasonic flowmeter with FIT-Design, Supply, Installation, Testing & calibration of open chanel type ultrasonic flow Transmitter CE marked with following technical parameters at Raw Water channel and Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-charge (Make-Siemen/Techtrol/Forbes Marshal,) Range- 0 - 5 mtrs, Output-4-20 mA / HART Power supply - 24V DC ext. Display - 4\\" LED Accuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68.
283Level transmitterDesigning, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked at each settling tank with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-chargeRange- 0 - 5 mtrsOutput-4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed at CWR,Chemical tank Make :-Vega, Techtrol, Forbes Marshall,Siemens
284Supply,Installation & Commissioning of Advance Active Lightening Protection system fitted with 80mm diameter GI mast by 35mm2 copper cable with proper insulating spacer on the highest point of the structure by connecting to earthing system all complete as per specification and direction of Engineer-in-charge
285Supply, Installation & commissioning of single core 16Sqmm copper XLPE armored power cable system including cables to be laid in soil, in trenches, cable to be laid in racks, clipped on walls, cable lugs, cable glands, conduits, cable joints etc. all complete as per specification and direction of Engineer-in-charge
286Supply, Installation & commissioning of 4C 16Sqmm copper XLPE armored power cable system including cables to be laid in soil, in trenches, cable to be laid in racks, clipped on walls, cable lugs, cable glands, conduits, cable joints etc. all complete as per specification and direction of Engineer-in-charge
287Supply, Installation & commissioning of three core 2.5Sqmm copper XLPE armored power cable system including cables to be laid in soil, in trenches, cable to be laid in racks, clipped on walls, cable lugs, cable glands, conduits, cable joints etc. all complete as per specification and direction of Engineer-in-charge
288Supply, Installation & commissioning of three core 1.5Sqmm copper XLPE armored power cable system including cables to be laid in soil, in trenches, cable to be laid in racks, clipped on walls, cable lugs, cable glands, conduits, cable joints etc. all complete as per specification and direction of Engineer-in-charge
289Supply, Installation and commissioning of Screened armoured Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. all complete as per specification and direction of Engineer-in-charge 1.5 sqmm 8 C CU AR Shielded Cable
2901.5 sqmm 6 C CU AR Shielded Cable
2911.5 sqmm 4 C CU AR Shielded Cable
2921.5 sqmm 2 CU AR Shielded Cable
293Supply, Installation & Testing of the 25x5mm Earthling strip Along The Cable Trenches or Cable Trays or Fixing to Walls (by Using Proper Size of Spacer and Saddles ) or Structures or buried individually in paved/ unpaved areas (minor civil work like chipping of paved surface finishing after laying grounding loop, etc. Welding at joints, providing anti-corrosive paint for Welded portion, clamping & necessary hardware for connection, excavation & refilling, etc. including provision for risers at places as per approved drawings, all labour to be considered in installation work ) including Earthling saddles, clamps ,terminal ,lugs etc. & all other required materials all complete as per specification, drawings and direction of Engineer-in-charge
294Supply, Installation and commissioning of GI perforated cable tray hot dipped galvanised16 SWG(Appx 1.5mm thick) 50mm*100mm width to wall, celling with necessary bracket,coupler plate for laying of power and data cable etc. as per specification. all Complete Works
295Supply, Installation and commissioning of GI perforated cable tray hot dipped galvanised16 SWG(Appx 1.5mm thick) 50mm*200mm width to wall, celling with necessary bracket,coupler plate for laying of power and data cable etc. as per specification. all Complete Works
296FILTER BED PLC CONTROL CONSOLE PLC with HMI for sand filter (with 2 Filter beds )Design, manufacture, supply, installation, testing and commissioning of indoor type PLC panel of size approx. 1200 mm X 700 mm X 1500mm (LBH), fabricated out of min. 2 mm thick CRCA sheet powder coated to Siemens gray color. The Panel shall be provided with reputed make PLC with following accessories as well as input output configuration. The PLC shall be programmed with IEC 61131 standards for control, monitoring and communication of equipments & instruments at WTP Plant (sand filter bed wasing & operation). make- Siemens, Schneider, ABB, L&T. all complete as per specification and direction of Engineer-in-charge. PLC shall have Ethernet port & protocal for Modbus TCP communication with following IO DI –64 num,DO – 40 num,AI –16 num,AO – 12 num,10 inch color TFT HMI complete with programming shall be provided to interact with PLC.The panel shall include all the accessories (not limited tofollowing) to achieve purpose of smooth & trouble free operation of sand filters (sand filter bed wasing & operation) MCB 10A DP – 1 num,MCB 4A DP – 4 num,24 VDC Power Supply 10A – 1num,Push Buttons – 30num,Selector Switch -15 num,Control Contactor – 15 num,Annunciator with 12 Windows,NO to NC Type,Electronic Hooter – 1 num,Control Transformer – 1 num,Emergency PB – 1 num,Panel Cooling Fan – 1 num,Panel Light with Door Switch –1 num Control Indication Lamp –15 num Wiring + TB etc – 1 lot Hardware – 1 lot,2 HP VFDs - 3 num
297Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charger unit with battery rack and maintenance free battery system including cables power plug, switch having application in 3nos 12Volt 65Ah DC Battery (drytype) charging to output continious 8 hrs power backup all complete as per specification and direction of Engineer-in-charge
298Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete as per specification and direction of Engineer-in-charge
299Supply, Installation and commissioning of Gigabit SFP to RJ45 Fibre multi Media Converter | Fibre to Ethernet Converter | 10/100/1000Mbps RJ45 Port to 1000Base-LX Dual-Mode Fibre (Make - Delink or equivalent) all complete as per specification and direction of Engineer-in-charge
300Supply, Installation and commissioning of 24 port fibber optic panel or light interface unit (LIU) draw out Type all complete as per specification and direction of Engineer-in-charge
301Supply, Installation and commissioning of OFC Splicing with pigtails all complete as per specification and direction of Engineer-in-charge
302Supply, Installation and commissioning of Fibre Pigtail/patch cord 1 mtr all complete as per specification and direction of Engineer-in-charge
303Supply, Installation and commissioning of Optical fibber 8-port managed L3 gigabit fibber switch and media converter for non-blocking throughput switching, high performance and low latency, Gigabit Ethernet SFP and RJ45 ports (Make- Dig sol- SG-GS4600FSE or equivalent all complete as per specification and direction of Engineer-in-charge
304Supply, Installation and commissioning of Fibre SFP Multi mode transceiver 100 base LC type module all complete as per specification and direction of Engineer-in-charge
305Supply, Installation and commissioning of SM(OS2) Duplex Patch cord 3mtr LC-SC,PC type all complete as per specification and direction of Engineer-in-charge
306Level transmitterDesigning, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked at each filter bed, backwash tank with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-chargeRange- 0 - 5 mtrsOutput-4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed at filter bed Make :-Vega, Techtrol, Forbes Marshall,Siemens
307Supply & installation of LOH ( Loss of Head) indicator with display unit at filter house for auto wash of filter bed with following technical specifications:-Housing : Cast Aluminium, Powder Coated. Mounting: Wall Mounting Power Supply : 230 V AC, 50 Hz Power Consumption : 4 VA (approximately) Adjustment Range : Span : Min 10%cof Electrode Length Alarm : A relay C/O rated 6 Amps 230 V, non-inductiveload adjustable throughout range Current output : 4-20mA DC non isolated, max. load resistance 600 Ohms, corresponding to differential level Accuracy : ±4% of Electrode Length Option : 1. Local as well as Control Room Display. 2. Loss of Head (LoH) can be supplied with Rate of Flow (RoF) in a common CA Housing with IP-55 Protection all complete as per specification and direction of Engineer-in-charge Make-Reputed make like Siemens/Sapcon/Pune Techtrol/Trumen
308Supply, installation, testing & commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.(Clear Water outlet )
309Supply & Installation of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following tevhnical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbidity Analayser, Measurement range-0.000 to 4000 NTU, Process temperature: 0 TO 60 C, Proces pressure: 0 to 4 bar, Make- Forbes Marshall, Tethys, Horiba, Hach
310Residual chlorine analyser Design, Supply, Installation,Testing of Residual chlorine analyser / meter must have automatic sensor cleaning facility at pure water sump and Interfacing with PLC panel. Residual Chlorine meter shall comprises of 3 components i.e. sensors,flow through assembly and transmitter with indicator and gives 2 outputs one to Local display & other to PLC including Mounting arrangement. Overall Range : 0 ‐ 8 mg/l (ppm) Accuracy : 2% of full scale Supply Voltage : 230 V ac Each 256718 17602 274320 ‐ Supply Voltage : 230 V ac Output : 4‐20 mA Membrane free sensor of 2 gold plated electrodes for long term stability and reference electrode (ag/Agcl) must be provided to avoid maintenance. IP 65 Nema 4 housing protection class required.all complete as per the direction of Engineer-in-charge.make (Forbes Marshall/Tethys/Horiba/Hach)
311Supply, Installation, Testing and commissioning of Chlorine Dosing System incluiding laying of pvc pipe interconnection with main waterline, Chemical storage and handling equipment etc. Zero leakge pneumatic diapharm dosing pump - 2nos, one primary and one standby mode, pressure upto-10bar, 1000 Ltr Chemical tank capacity. Agitator motor - 1nos, strainer, NRV on Pump Outlet, Electrically actute Flow control Valve with PLC compatible VFD Panel for dosing pump and agitator etc. transportation & packaging including cost of materials, all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
312OTHER COMMON Supply & installation of full-bore type 300mm dia electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS
313Providing, erecting Electric Valve Actuator with non rising spindle type sluice valve of PN 1.6 rating, totally enclosed, weather-proof and dust proof construction with IP-67, protection class suitable for installation in any position without lubrication, leakage or other operational difficulty with special grease filled gear box and hand wheel for emergency manual operation which will automatically dis-engage on restoration of power to motor and with 10 watt single phase space heater and continuous local mechanical position indicator and individually replaceable counter gear assembly and with two torque and four limit switches with S.S. flap and operated with gear driven cams and of rating 250 Volt, 5 Amp, AC/DC, torque switch dial and with TEFC squirrel cage induction motor working on 440 Volts +/- 10%, 3 phase, 50 Hz AC of intermittent duty rating S2, insulation class \\"F\\" and temp rise restricted to class \\"B\\" with IP - 67 protection class suitable for DOL starting and with three thermostat and 30% over load margin. The torque rating of reduction gear box shall be atleast 1.5 times max. torque required for opening and closing of valve with integral starter for ON & OFF operation (Make-VAG/AVK/Hawle, Actuator make- Auma/ Rotork) 100mm dia(Gate Valve) with actuator
314200mm dia (Gate Valve)with actuator
315250mm dia(Gate Valve)with actuator
316300mm dia (Gate Valve)with actuator
317Supply with fitting and fixing of of D.I. Mechanical dismentaling joint of dia 300mm for use to main uninterrupted water supply in the pipeline in case of repair of Flow meter as per specification and direction of Enginer - in - charge
318Supply of Pressure Gauge to be installed delivery main Range up to 10 kg/cm2, Type-Sensor, Power Supply-24 DC, Out put-4 to 20mA, Make-E & H/ABB/VEGA.with SS 316 grade sensor niddle valve with bypass tube
319Supply & Installation,testing & Commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main,ingress protection IP65 including cost of all materials, Transportation to site etc all complete as per specification and direction of Engineer-in-charge.Make- Forbes Marshall, Honeywell, Baumer,WIKA
320Providing & fixing of Kirloskar/equivalent make DI NRV PN 1.6 rating flanged end with by pass arrangement confirming to IS 14846 including all materials, labours, insertions & nut-bolt complete.PN 1.6 rating flanged end with by pass arrangement.(200mm dia)
321GSM/GPRS modem - Supplying , Installing and Commissioning of 4G LTE based GSM / GPRS modem (make- Robustel, Teltonika, USR, Moxa, Waveshare) to work on ethernet with PLC for remote and wireless communication between PLCs for ON / OFF operation of pumps at remote locations with test & trial including one year warranty including SIM card & SMS charges.
322E.Automation for Intakewell site for Improvement of water supply to Tusura Town-PART I.Installation of Automation System Intakewell site Level transmitterDesigning, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-chargeRange- 0 - 5 mtrsOutput-4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed Make :-Vega, Techtrol, Forbes Marshall,Siemens
323Design, Supply, Installation, Testing, Wiring, Programming & Commissioning of PLC panel at intake Made out of 2 MM C.R sheet, Encloser Duly Powder coated, Floor standing, Front operated, Rear wiring, complete with interconnection with copper wire and lugs, 32A 15KA MCB - 1 nos, DC powered Transistor/Relay based 48 DI and 20 DO, 32AI & 12AO Ethernet PLC Module, 35 Microsecond Response time for DI/DO Switch on/off, 8ch Analog input module- 2 Nos having 1ms per channel conversion/sampling time. 4Ch Analog Output module - 4 Nos having 1ms per channel conversation/ stabilisation time. Ambient air tempature upto 500C.touch Panel display having 2 ethernet, USB host & device 24VDC type- 1 Nos (Make- Siemens,Schneider,Allen Bradly). Rated DP Separate DC MCB for Indivisual Modules.. 24VDC 1no. C/O type slim Relay with LED for Digital out put - sufficient Nos (make-Wago, Phoenix, P&F). 5 Ch Unmanaged Industrial Grade Switch- 1 Nos. (Make- CISCO, Schneider, Siemense, Allen Bradley, D-Link) .4G ethernet TCP/IP-Modbus Industrial Grade GSM Router - 1 Nos (make- Robustel,Teltonika). 1.5 mmFuse TB with 0.5A glass fuse with Fuse blown indicator type Terminal Block for Digital Input/analog output- sufficient Nos. 1.5 mm Terminal block for Digital Output - sufficient Nos. (Make- Wago, Phoenix Contact). 24VDC powered signal isolator for Analog Input - sufficient Nos. (Wago,Phoenix), 24 VDC 6Amp, 1 HMI ( Make- Wago, GIC, Phoenix Contact,Siemens,Schneider), Color Coded Terminal Blocks for AC/DC/earth Bus/TB - sufficient Nos.(Make- Wago, Phoenix Contact, Connectwell), 2/4/6 Amp AC/DC MCB- sufficient nos All switchgear and controlgear make- Siemens, Schneider, ABB. all complete as per electrical specification and as per direction of EIC.
324Type 2-1 P+N 15KVA Surge protection device
325Supply, Installation, Programming, Testing & Commissioning of 1 KVA Online UPS with 08Hr Battery Backup System, Having auxillary panel including battery maintanance free back including ACDB Double conversion IGBT based online UPS system with builtin Isolation Transformer, Input 150-250VAc 1Phase,50Hz, output: 230 VAC,1Phase,50Hz. Drytype Battery with MS Rack . All completed as per electrical specification and as per direction of EIC.
326Supply & Installation,testing & Commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main,ingress protection IP65 including cost of all materials, Transportation to site etc all complete as per specification and direction of Engineer-in-charge.Make- Forbes Marshall, Honeywell, Baumer,WIKA
327Supplying all materials,labour,T&P, for fitting of PLC panel as per electrical specification 1.5 sqmm 8 core armoured cable
3281.5 sqmm 6 core armoured cable
3291.5 sqmm 4 core armoured cable
3301.5sqmm 2 core armoured Instrument(Screen cable)
331CAT-6 Dlink cable
332Cable Gland-25 mm
333Cu.logs-1.5/2.5
334Supply, installation of chemical earthing with crystalline conducting material for Back Fill Compound & installation of Maintenance Free Earthing Electrode with ISI mark G.I. Pipe dia 50mm as Secondary electrode with wall thickness of 2.6mm and the primary earthing electrode will be 25mm x 6mm hot dipped galvanized strip filled with a highly conductive & non-corrosive compound in between the primary earthing & the secondary earthing. A solid G.I. Base plate of 300 x 300 mm seals the unit at the bottom. Ground filling compound will be provided in 25kg per bag - 2nos. Excavation of earth pit refilling, Precast RCC chamber with lid etc. all complete as per the site requirement.
335Supply & installation of full-bore type 400mm dia electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS
336Supply with fitting and fixing of of D.I. Mechanical dismentaling joint of dia 400mm for use to main uninterrupted water supply in the pipeline in case of repair of Flow meter as per specification and direction of Enginer - in - charge
337Supply of Pressure Gauge to be installed delivery main Range up to 10 kg/cm2, Type-Sensor, Power Supply-24 DC, Out put-4 to 20mA, Make-E & H/ABB/VEGA.with SS 316 grade sensor niddle valve with bypass tube
338Providing & fixing of Kirloskar/equivalent make DI PN 1.6 rating flanged end with by pass arrangement confirming to IS 14846 including all materials, labours, insertions & nut-bolt complete.PN 1.6 rating flanged end with by pass arrangement.(200mm dia)
339Providing, erecting Electric Valve Actuator integrated inch type with non rising spindle type sluice valve of PN 1.6 rating, totally enclosed, weather-proof and dust proof construction with IP-67, protection class suitable for installation in any position without lubrication, leakage or other operational difficulty with special grease filled gear box and hand wheel for emergency manual operation which will automatically dis-engage on restoration of power to motor and with 10 watt single phase space heater and continuous local mechanical position indicator and individually replaceable counter gear assembly and with two torque and four limit switches with S.S. flap and operated with gear driven cams and of rating 250 Volt, 5 Amp, AC/DC, torque switch dial and with TEFC squirrel cage induction motor working on 440 Volts +/- 10%, 3 phase, 50 Hz AC of intermittent duty rating S2, insulation class \\"F\\" and temp rise restricted to class \\"B\\" with IP - 67 protection class suitable for DOL starting and with three thermostat and 30% over load margin. The torque rating of reduction gear box shall be atleast 1.5 times max. torque required for opening and closing of valve with integral starter for ON & OFF operation (Make-VAG/AVK/Hawle, Actuator make- Auma/ Rotork) 200mm dia
340PART II-Laying & Installation of remote communication system GSM/GPRS modem - Supplying , Installing and Commissioning of 4G LTE based GSM / GPRS modem (make- Robustel, Teltonika, USR, Moxa, Waveshare) to work on ethernet with PLC for remote and wireless communication between PLCs for ON / OFF operation of pumps at remote locations with test & trial including one year warranty including SIM card & SMS charges.
341F.Installation of DG(Intake & WTP) and other ancilliary work-Design,drawing,Construction of RCC framed framed structure watchmanshed building having G+1 foundation,Earthwork,PCC(1:3L:6),Flyash Brick masonry(1:6),Plastering(1:6),Painting with all finishing work,Fixing of doors,windows,vitrified tiles all complete including transportation,lead,royality,all taxes complete as per the direction of EIC.
342Supply, installation, testing and commissioning of 82.5 KVA, 0.44KV Silent outdoor diesel generator set (CPCB IV) three phase, air cooled/water with standard manual control panel having batteries & leads with stand ,AVM pads,acquastic enclosure,load side terminal box for cable termination including transportation ,loading, unloading all complete as per direction of Engineer In Charge.
343Supply, installation, testing and commissioning of 125 KVA, 0.44KV Silent outdoor diesel generator set (CPCB IV) three phase, air cooled/water with standard manual control panel having batteries & leads with stand ,AVM pads,acquastic enclosure,load side terminal box for cable termination including transportation ,loading, unloading all complete as per direction of Engineer In Charge.
344Cables: Supply, Laying, testing and commissioning of following cable incluiding loading, unloading & transportation and providing tagging as per specification etc all completed as per direction of Engineer In Charge. L T 3.5 core, 150Sqmm XLPE-AL armoured cable
345Installation of CCTV survillance system at indore and outdoor unit of WTP Supplying all materials ,labour, T&P for fixing of 16CH NVR WITH TWO SATA CP-1NR-NK41 including transportation all complete as per direction of EIC.
346Supplying all materials ,labour, T&P for fixing of PTZ CAMERA CP-URP-D2521L10-DP MAKE CPPLUS/HIKVISION/DAHUA/TPLINK including transportation all complete as per direction of EIC.
347Supplying all materials ,labour, T&P for fixing of 4MP COLOR BULLET IP CAMERA MAKE CPPLUS/HIKVISION/DAHUA/TPLINK transportation all complete as per direction of EIC.
348Supplying all materials ,labour, T&P for fixing of 4MP COLOUR DOME IP CAMERA MAKE CPPLUS/HIKVISION/DAHUA/TPLINK including transportation all complete as per direction of EIC.
349Supplying all materials ,labour, T&P for fixing of 4TB HDD MAKE WD/SEAGATE/TOSHIBA transportation all complete as per direction of EIC.
350Supplying all materials ,labour, T&P for fixing of PROVIDING AND LAYING OFDIGISOL CAT6 CABLE PER METERS including transportation all complete as per direction of EIC.
351Supplying all materials ,labour, T&P for fixing of 8NPORT GIGA SWITCH including transportation all complete as per direction of EIC.
352Supplying all materials ,labour, T&P for fixing of CCTV FITTINGS AND INSTALLATION CHARGES including transportation all complete as per direction of EIC.
353Supplying all materials ,labour, T&P for fixing of 22” DELL/HP/ MONITOR including transportation all complete as per direction of EIC.
354Supplying all materials ,labour, T&P for fixing of CPPLUS 4U RACK MODULARFITTINGS including transportation all complete as per direction of EIC.
355Supplying all materials ,labour, T&P for fixing of DIG ISOL RJ45 CLIP including transportation all complete as per direction of EIC.
356Construction of Approach road -Supplying all materials, labour, T&P and filling of road surface with borrow earth from the approved quarry and compacting to the required density with testing including cost of royalty, lead & transportation & labour cess etc all complete as per the direction of Engineer-in-charge.
357Construction of granular sub-base by providing Coarse graded Grading-II material as per Table 400-2, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per the direction of EIC.
358Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per the direction of EIC.
359P.C.C.(1:3:6) in foundation & plith using 40 mm size b.h.g.c.b metal including mixing of materials and laying in well prepared surface & compacting, watering curing with cost, conveyance, royalities of all materials, T&P and Labour charges etc. complete in all respecte as per Scope & Technical Specification & direction of Engineer-in-Charge.
360M30 Grade Concrete using 20mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers compacting by vibrator with proper cambering and filling berm by excavated earth and all leads and lifts including frame works etc. complete
3615 Year Annual maintenance (Including contribution towards EPF, ESI, Labour cess, Contractors Profit & OH Charges but excluding cost of Energy charges)Electrification/DG at Intake and WTP -Supply of 01 No electrician(highly skilled)for daily maintenance of the internal electrical infrastructure, including DG sets and the substation premises beyond the scope of TPWODL maintenance which include fault detection and rectification of electrical components, ensuring restoration within 24 hours to maintain uninterrupted power supply to the pump houses as per the instruction of Engineer-in-charge.SCADA & Automation at intake and WTP Supply of 01 No SCADA operator ( highly skilled), 02 No SCADA assistant(skilled) and 01 No Electrician(highly skilled) for the operation and maintenance of all instrumentation and automation systems which includes regular monitoring and updating of SCADA software, maintenance of data communication and signal systems, fault identification and rectification of electrical/instrumentation issues within 24 hours, and preparation of daily reports on water quality ,electrical parameters and the online report shall be mailed daily to headquarter for daily monitoring purposes and all should be complete as per the instruction of Engineer-in-charge. Electrification/DG at Intake and WTP - Supply of 01 No electrician(highly skilled)for daily maintenance of the internal electrical infrastructure, including DG sets and the substation premises beyond the scope of TPWODL maintenance which include fault detection and rectification of electrical components, ensuring restoration within 24 hours to maintain uninterrupted power supply to the pump houses as per the instruction of Engineer-in-charge. SCADA & Automation at intake and WTP Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57664458
AUTHORITY Government Departments
TENDER VALUE 4.20 Crore
LAST DATE 07-10-2026
Authority
Authority Name Public Health Engineer Organisation
Work Description Tender for External Power Supply To Intakewell,Wtp And Pump Houses In Connection With The Work Augmentation Of Water Supply To Tusura Town.
Basic Detail
Tender No ACEPHBGR 02/2026-27
Bidding Type Tender
Location
City Balangir
State Odisha
Key Dates
Publish Date 23 Sep 2026
Submission Date 07 Oct 2026
Open Date 08 Oct 2026
Finance
Tender Value 4.20 Crore
Tender Fee 10000
EMD 4.20 Lakhs
Exemption Available
Document List
13a2f03f-fc0b-4b76-9f78-dcd828be2e20.html
BOQ_610593.xls
DTCN.pdf
Tendernotice_1 (20).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Oct 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

13a2f03f-fc0b-4b76-9f78-dcd828be2e20.html

xls

BOQ_610593.xls

pdf

DTCN.pdf

pdf

Tendernotice_1 (20).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders