Tender For Deviation In Erection Of 110 Kv Dc Line On Dc Tower With Panther Conductor And 1 No. Gi Earth Wire By Making Lilo Of Existing Karimangalam - Hosur 110 Kv Feeder At Uddanapally 230/110 Kv Ss Between Tower Location No.1 To 4 As Per The Reque
Tender Overview
Project Description
Tender for Deviation In Erection Of 110 Kv Dc Line On Dc Tower With Panther Conductor And 1 No. Gi Earth Wire By Making Lilo Of Existing Karimangalam - Hosur 110 Kv Feeder At Uddanapally 230/110 Kv Ss Between Tower Location No.1 To 4 As Per The Request Of The M/S. Sharika Promoters Pvt.Ltd, Mookandapalli, Hosur Tk, Krishnagiri Under Dcw Basis.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete |
| 2 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete. |
| 3 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard gravelly soil |
| 4 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In soft distengrated rock not requiring blasting |
| 5 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In medium rock and dense medium rock not requiring blasting |
| 6 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard rock requiring blasting |
| 7 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard rock requiring Wedging and chesiling |
| 8 | Fixing of stub and cleat with supply of template for HCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 9 | Fixing of stub and cleat with supply of template for KCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 10 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel,engine oil,pump operator etc., complete. |
| 11 | Providing shoring and shuttering with CW Scantlings and planks including cost of all materials,labour etc., complete |
| 12 | PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead,lift and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P etc complete.as directed by the Engineer at site. |
| 13 | PCC 1:2:4 using 20mm HBG metal for foundation with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete, labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P etc complete. |
| 14 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete |
| 15 | Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete. |
| 16 | Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site. |
| 17 | Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete |
| 18 | Transportation from source to site and sorting out of tower parts, erection of GI tower angles, fabrication of tower angles (if required) and punching of bolts and nuts immediately after erection of towers, tightening , punching , final checking, providing holes wherever necessary and final checking etc., including cost of materials, T & P,labour, lead, lift, painting of bolts for identification including cost of all labour charges etc., complete. etc complete. as per approved drawing and specification For Double Circuit Towers |
| 19 | Transporting from source to site and Hoisting of 7 units of single suspension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. |
| 20 | Transporting from source to site and Hoisting of 8 units of single Tension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. |
| 21 | Providing independent temporary guys for sets of cross arm of each 3 Nos including digging of trench for a size of 6' x 2' x 6', supplying and placing in the digged pit of RSJ/Concrete Block/Wooden log of 50kgs weight,tying the cross arm with the wooden log/RSJ/Concrete with the help of GI earthwire, distance of 1 1/2 x Height of tower, refilling the trench and relaesing after completion of work etc complete. |
| 22 | Supplying and fixing of name board of size 0.75 x 0.45m using 18 gauge MS Sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labour, lead, lift, etc., complete.. |
| 23 | Painting the tower leg with Anti-corrosive black paint up to a height of 1M from ground level including cost of paint labour lead lift,etc, complete. |
| 24 | Tack welding of bolts & Nuts in the newly erected towers up to bottom cross arm level including of three tack weld for each bolts & Nuts hire charges of welding machine, cost of welding rods, transporting charges and painting with cold galvanizing and tightening of bolts wherever necessary including cost of all materials, labour, lead, lift,, transporting hire charges etc. complete. |
| 25 | Labour charges for Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from store labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Span |
| 26 | Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading , lead, lift, cost of T&P, etc complete. For Span |
| 27 | Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete |
| 28 | Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete |
| 29 | Labour charges for Releasing and lowering of 120 KN tension insulator with fittings including all labour, lead, lifts, and T & P etc., complete. |
| 30 | Labour charges for Releasing and lowering of 90 KN tension insulator with fittings including all labour, lead, lifts, and T & P etc., complete. |
| 31 | Labour charges for Releasing and re-stringing of existing 6 Nos ACSR PANTHER conductor including labour charges,T&P all lead.lift etc., complete. |
| 32 | Labour charges for releasing and Re-Stringing of existing 1 No of7/3.55mm GI earthwire including lead, lift, labour and cost of T&P etc complete. |
| 33 | Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). |
| 34 | Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site. |
| 35 | Supply, transport and fixing of Single Tension fittings for panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 36 | Supply, transport and fixing of Single Suspension fittings for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 37 | Supply, transport and fixing of Repair sleeve for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 38 | Supply, transport and fixing of Mid span joint for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 39 | Supply, transport and fixing of SB damber for panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 40 | Supply,Transport and fixing of D shackle for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 41 | Supply,Transport of Number Plate as per IS standard and departmental specifications by the engineer incharge at site. |
| 42 | Supply,Transport of Danger Board as per IS standard and departmental specifications by the engineer incharge at site. |
| 43 | Supply,Transport of Phase Plate as per IS standard and departmental specifications by the engineer incharge at site. |
| 44 | Supply, transport and fixing of Aluminium earth bond for earth wire as per IS standard and departmental specifications by the engineer incharge at site. |
| 45 | Supply, transport and fixing of Single Tension fittings for earthwire as per IS standard and departmental specifications by the engineer incharge at site. |
| 46 | Supply, transport and fixing of Mid span joint for earthwire as per IS standard and departmental specifications by the engineer incharge at site. |
| 47 | Dismantling of GI tower angle is \\"AS IS WHERE IS CONDITION\\" Clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms. |
| 48 | GST for bidders within Tamil Nadu |
| 49 | GST for bidders outside Tamil Nadu (IGST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender