Supply Of Set of Inspection gauges
Tender Overview
Project Description
Supply Of set of inspection gauges , inspection gauge for l in 16 turnout with 11200 mm zu-1-60 thick-web switch for 60 kg (uic) to drg. no. rdso/t- 7076 for use in depot : (rdso t - 9004). the single kit consist of 8 nos. different gauges [ warranty period: 30 months after the date of delivery ] ] , complete set of inspection gauges for use of gauges for 1:8.5 60 kg thick web switches (rt-9002 part). one set consists 1. guage-1 end t emplete at actual toe of switch.(t-9002 part), 2. guage-2 head width checking gauge at point h 22 mm head thickness., 3. guage-2a and 2b -head width checking gauge at point m 22mm head thickness., 4. guage-3 head width checking guage at point g 55 mm head tickness., 5. guage-3a and 3b-head checking guage at point g 55 mm head thickness., 6. guage 58-tongue rail height at 1098 mm from a.t.s, as per rds o drawing attached [ warranty period: 30 months after the date of delivery ] ] , complete set of inspection gauges rdso t-9003 (part) or rdso t-6155 (part-2) (alteration-4) for 10125 mm. thick-web curved switches bg for 60 kg. one set consists of 1. end template at actual toe of switch - gauge no.1/a (for rh tongue rail) 2. end template at actual toe of switch - gauge no.1/ b(for lh tongue rail). 3. head width checking gauge at 2678 mm from ats (22 mm head thickness) -gauge 2a & 2b 3. head width checking combined gauge at 2678 mm from ats (22 mm head thickness) - gauge no. 2/1. 4. head width checking gauge at 4958 mm from ats (55 mm head thickness) -gauge 3a & 3 b 5. head width checking combined gauge at 4958 mm from ats (55 mm head thickness) - gauge no. 3/1. with necessary requirements of (1) duly signe d calibration certificates of each gauge from any government approved gauge certification lab. (2) certificate issued by government agencies to lab.(3) aut ocad 01:01 drawings of each gauge in set. [ warranty period: 30 months after the date of delivery ] ] , manufacturing and supply of complete set of inspection gauges as per rdso drg, no. t-6215(part)alteration-04 , for 10125mm over riding cur ved switch b.g for 60 kg(uic) on psc sleeper to rdso drg no. t-4219 . one set consists of( i) end template-y at point r (ats)-gauge no.1 /a (for rhs tong ue rail) (ii)end template-y at point r (ats)-gauge no.1 /b (for lhs tongue rail) (iii)under cutting of tongue rail foot at ats-gauge no.2(iv) 13mm head t hickness (at 1682mm from ats)-gauge no.3(v) 12r toe radius at ats-gauge no.6(vi)tongue rail head thickness (at 4244mm from ats)- gauge no.35 .w ith necessary requirements below 1.-duly signed calibration certificates of each gauge from any government approved gauge calibration lab . 2- certificate i ssued by government agencies to lab. 3- autocad 01:01 drawings of each gauge in a set. [ warranty period: 30 months after the date of delivery ] ] , manufacturing and supply of complete set of inspection gauges as per rdso drg no. t-6213, alt-03 for for 6400 mm o.r. fan shaped switch (c urved) b.g. (1673 mm) for 60 e1 rail on psc sleepers to drawing no. t-4966. as per rdso drawing attached [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Inspection gauge for l in 16 turnout with 11200 mm Zu-1-60 Thick-web switch for 60 Kg (UIC) to Drg. No. RDSO/T- 7076 for use in depot : (RDSO T - 9004). The single Kit consist of 8 nos. different gauges [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Complete set of inspection gauges for use of Gauges for 1:8.5 60 Kg Thick Web Switches (RT-9002 Part). ONE SET CONSISTS 1. GUAGE-1 END T EMPLETE AT ACTUAL TOE OF SWITCH.(T-9002 part), 2. GUAGE-2 HEAD WIDTH CHECKING GAUGE AT POINT 'H' 22 MM HEAD THICKNESS., 3. GUAGE-2A AND 2B -HEAD WIDTH CHECKING GAUGE AT POINT 'M' 22MM HEAD THICKNESS., 4. GUAGE-3 HEAD WIDTH CHECKING GUAGE AT POINT 'G' 55 MM HEAD TICKNESS., 5. GUAGE-3A AND 3B-HEAD CHECKING GUAGE AT POINT 'G' 55 MM HEAD THICKNESS., 6. GUAGE 58-TONGUE RAIL HEIGHT AT 1098 MM FROM A.T.S, As per RDS O DRAWING ATTACHED [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | Complete Set of Inspection Gauges RDSO T-9003 (Part) or RDSO T-6155 (Part-2) (Alteration-4) for 10125 mm. Thick-web curved switches BG for 60 KG. One set consists of 1. End Template at actual toe of switch - Gauge No.1/A (FOR RH Tongue Rail) 2. End Template at actual toe of switch - Gauge No.1/ B(For LH Tongue rail). 3. Head width checking gauge at 2678 mm from ATS (22 mm head thickness) -Gauge 2A & 2B 3. Head width checking Combined gauge at 2678 mm from ATS (22 mm head thickness) - Gauge No. 2/1. 4. Head width checking gauge at 4958 mm from ATS (55 mm head thickness) -Gauge 3A & 3 B 5. Head width checking combined gauge at 4958 mm from ATS (55 mm head thickness) - Gauge No. 3/1. With NECESSARY REQUIREMENTS of (1) Duly signe d calibration certificates of each gauge from any government approved gauge certification Lab. (2) Certificate issued by Government agencies to Lab.(3) AUT OCAD 01:01 Drawings of each gauge in set. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | Manufacturing and Supply of complete set of inspection gauges As per RDSO Drg, No. T-6215(Part)Alteration-04 , for 10125mm Over Riding Cur ved Switch B.G for 60 Kg(UIC) on PSC Sleeper to RDSO Drg No. T-4219 . One set consists of( i) End Template-Y at point R (ATS)-GAUGE NO.1 /A (For RHS Tong ue Rail) (ii)End Template-Y at point R (ATS)-GAUGE NO.1 /B (For LHS Tongue Rail) (iiI)Under Cutting of Tongue Rail Foot at ATS-GAUGE NO.2(iv) 13mm Head T hickness (at 1682mm from ATS)-GAUGE NO.3(v) 12R Toe Radius at ATS-GAUGE NO.6(vi)Tongue Rail Head Thickness (at 4244mm from ATS)- GAUGE NO.35 .W ith necessary requirements below 1.-Duly signed Calibration Certificates of each gauge from any government approved gauge calibration Lab . 2- Certificate i ssued by government agencies to Lab. 3- AUTOCAD 01:01 drawings of each gauge in a set. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 5 | Manufacturing and supply of complete set of Inspection Gauges as per RDSO DRG No. T-6213, Alt-03 for for 6400 mm O.R. fan shaped switch (c urved) B.G. (1673 mm) for 60 E1 rail on PSC sleepers to drawing No. T-4966. As per RDSO DRAWING ATTACHED [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender