Tender For E-Tender For Works Contract For Carrying Out Ht & Lt Dcw, Improvement And Capital Extension Works For The Period Of One Year From The Date Of Execution Of Agreement Or Commencement Of Work Of The Contract Millkovilpalayam Sub Division Of N
Tender Overview
Project Description
Tender for E-Tender For Works Contract For Carrying Out Ht & Lt Dcw, Improvement And Capital Extension Works For The Period Of One Year From The Date Of Execution Of Agreement Or Commencement Of Work Of The Contract Millkovilpalayam Sub Division Of Negamam Division
BOQ
| Sl. No. | Item Description |
| 1 | EXCAVATION OF POLE PITS / Stay Set: |
| 2 | For pole upto 8.00m length by using JCB/Manual |
| 3 | For pole above 8.00m length by using JCB/Manual |
| 4 | In Hard Soil (common to all size of poles) |
| 5 | In rocky area (common to all size of poles) by blasting / Manual |
| 6 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 7 | Excavation & back filling of stay pit per location - Hard rock requires blasting |
| 8 | Excavation & back filling of stay pit per location - Hard rock without blasting |
| 9 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting |
| 10 | ERECTION OF POLES AND ACCESSORIES |
| 11 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 12 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 13 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
| 14 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 15 | Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
| 16 | Erection of stay set complete in the rock area by blasting |
| 17 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) |
| 18 | Replacement of guy shackle only in existing stay |
| 19 | Fixing of Line Materials |
| 20 | V cross arm 3.5 feet |
| 21 | V cross arm 4.5 feet |
| 22 | V cross arm 5.0 feet |
| 23 | Fixing of LT S phase cross arm |
| 24 | Fixing of LT 3 phase cross arm |
| 25 | Fixing of HT / LT Ti fitting |
| 26 | Fixing of HT PIN insulator with Pin 11 kv |
| 27 | Fixing of HT PIN insulator with Pin 22 kv |
| 28 | Fixing of HT PIN insulator with Pin 33 kv |
| 29 | Fixing of LT PIN insulator |
| 30 | Fixing of HT strain disc 11 KV |
| 31 | Fixing of HT strain disc 22 KV |
| 32 | Fixing of HT strain disc 33 KV |
| 33 | Set right of all sizes of leaning poles (cut point) |
| 34 | Set right of all sizes of leaning poles (pin point) |
| 35 | Fixing of shackle |
| 36 | Fixing of Aluminium knob |
| 37 | Fixing of HT LAS (3 Nos.) |
| 38 | Fixing of LT LAS (3 Nos.) |
| 39 | Double channel-X-Arm |
| 40 | Guarding Cross Arm |
| 41 | Tapping Channel Cross Arm |
| 42 | Fixing of open type fuse unit |
| 43 | Providing of line spacers in LT lines 1 phase |
| 44 | Providing of line spacers in LT lines 3 phase |
| 45 | Fixing of LT capacitor |
| 46 | STRINGING OF CONDUCTORS: |
| 47 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 48 | Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 49 | Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. |
| 50 | Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor |
| 51 | Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor |
| 52 | Releasing and reerection (resagging) of one run of upto 7/3.15 conductor |
| 53 | Releasing and reerection (resagging) of one run of above 7/3.15 conductor upto DOG conductor |
| 54 | ERECTION OF DISTRIBUTION TRANSFORMERS: |
| 55 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 56 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. |
| 57 | (i) Upto 25 KVA Distribution transformer / Metering set. |
| 58 | (ii) Above 25 KVA to 100 KVA |
| 59 | (iii) Above 100 KVA to 250 KVA |
| 60 | (iv) 500 KVA and above |
| 61 | Erection of Failed Distribution Transformer including loading of Distribution Transformer at stores and erection at structure. |
| 62 | (i) Failed DT replacement below 100 KVA |
| 63 | (ii) Failed DT replacement 100 KVA and above |
| 64 | Erection of 11 KV / 22 KV single pole Structure including erection of DT complete without centre support |
| 65 | Erection of 11 KV / 22 KV Single Pole structure including erection of DT complete with centre support |
| 66 | DT Metering Arrangements - Whole Current Meter (including fixing of DT Meter Box) |
| 67 | DT Metering Arrangements - LTCT Meter (including fixing of DT Meter Box) |
| 68 | ERECTION OF DP STRUCTURE: |
| 69 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., |
| 70 | (i) With 11 KV AB switch using all types of poles of size 9.14 m and above length |
| 71 | (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length |
| 72 | Erection of single pole DP with complete and with single earth |
| 73 | CONCRETING WORKS: |
| 74 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) |
| 75 | (i) Mass concreting of poles (2'x2'x3') |
| 76 | (ii) Sleeve concreting (2'x2'x3') |
| 77 | (iii) Stay concreting (1.5'x1.5'x3') |
| 78 | EARTHING: |
| 79 | (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 80 | (ii) Provision of spike including earthing arrangement |
| 81 | (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 82 | (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
| 83 | (v) Replacement of corroded earth pipe |
| 84 | LOADING AND UNLOADING CHARGES: |
| 85 | Loading or unloading of Distribution Transformer |
| 86 | (i) Upto 100 KVA |
| 87 | (ii) Above 100 KVA and upto 500 KVA |
| 88 | Loading of various sizes of poles |
| 89 | (i) REC, RCC, PSC pole upto 8.00 m length |
| 90 | (ii) All REC, RCC pole above 8.00 m length |
| 91 | (iii) Metal poles all sizes |
| 92 | (iv) RSJ Pole for centre support DT |
| 93 | Unloading of various sizes of poles |
| 94 | (i) REC, RCC, PSC pole upto 8.00 m length |
| 95 | (ii) All REC, RCC pole above 8.00 m length |
| 96 | (iii) Metal poles all sizes |
| 97 | (iv) RSJ Pole for centre support DT |
| 98 | Loading of Conductor |
| 99 | Unloading of Conductor |
| 100 | Loading / Unloading of Iron & Steel |
| 101 | Loading / Unloading of line materials |
| 102 | Loading / Unloading of 11 KV / 22 KV / 33 KV strain disc |
| 103 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 104 | Loading / Unloading of meters |
| 105 | (i) Single Phase Meter |
| 106 | (ii) Three Phase Meter |
| 107 | Guarding Arrangement |
| 108 | Provision of guarding with two numbers earth pits excluding stay set erection |
| 109 | (i) Flat guarding with earth pit |
| 110 | (ii) Split neutral |
| 111 | TRANSPORTATION CHARGES: |
| 112 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 113 | Transportation of all type of poles by bullock cart or other vehicle |
| 114 | (i) For a lead upto 5 KM |
| 115 | (ii) Above 5 KM of lead of every KM |
| 116 | Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location |
| 117 | (i) Upto 1 KM |
| 118 | (ii) Above 1 KM per each KM |
| 119 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 120 | (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 1 Tonne by engaging Transport vehicle |
| 121 | (ii) Transporting of Distribution Transformer / Line materials from stores to office / site above 1 Tonne by engaging Transport vehicle |
| 122 | Transporting of Distribution Transformer / Line materials from stores to office / site above 1 Tonne by engaging Transport vehicle above 10 KM |
| 123 | Dismantling Charges |
| 124 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit |
| 125 | For breaking the mass concrete of all supports |
| 126 | Dismantling of stay set complete |
| 127 | (i) including stay rod |
| 128 | (ii) Without stay rod |
| 129 | Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 130 | Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 131 | Dismantling of Double Pole Transformer structure materials complete set and transporting the same from the location to the road side |
| 132 | Dismantling of Single Pole Transformer structure materials complete set and transporting the same from the location to the road side |
| 133 | Dismantling of Cross arm clamps TI fitting hardwares, insulators etc., |
| 134 | Dismantling of Double Channel X-Arm |
| 135 | Dismantling of Guarding Cross Arm |
| 136 | Dismantling of Tapping channel x arm |
| 137 | Dismantling of 11kv PIN with insulator |
| 138 | Dismantling of 11kv Composite Disc with Mp |
| 139 | Dismantling of 22kv PIN with insulator |
| 140 | Dismantling of 22kv Composite Disc with Mp |
| 141 | Dismantling of 33 KV Pin Insulator |
| 142 | Dismantling of 33 KV Disc |
| 143 | Dismantling of 5' V-X Arm |
| 144 | Dismantling of 1372 mm (4'6\\") V-X-Arm |
| 145 | Dismantling of 1068 mm (3'6\\") V-X-Arm |
| 146 | Dismantling of H.T/L.T. T.I. Fitting |
| 147 | Dismantling of 3ph X -Arm |
| 148 | Dismantling of 1ph X -Arm |
| 149 | Dismantling of Aluminium knob |
| 150 | Dismantling of LT Shackle with Mp |
| 151 | Dismantling of LT Pin with Insulator |
| 152 | Dismantling of LT open type |
| 153 | Dismantling of Top channel |
| 154 | Dismantling of Belting channel |
| 155 | Dismantling of Bed channel |
| 156 | Dismantling of metering set 11 KV / 22 KV / 33 KV |
| 157 | Dismantling of DT below 200 KVA |
| 158 | Dismantling of DT 200 KVA & above but below 500 KVA |
| 159 | Dismantling of DT 500 KVA |
| 160 | Dismantling of HT LAS (3 nos) |
| 161 | Dismantling of LT LAS (3 nos) |
| 162 | Dismantling of guarding arrangement - Flat guarding |
| 163 | Dismantling of guarding arrangement - Split neutral guarding |
| 164 | Dismantling of Integrated DT Metering Arrangements / Whole Current Meter / LTCT / HT Meter |
| 165 | Dismantling of Modem including accessories |
| 166 | PAINTING: |
| 167 | Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT |
| 168 | Numbering of poles including base painting and with cost of paint |
| 169 | Painting of iron poles up to 36 ft length with double coats including cost of paint |
| 170 | Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint |
| 171 | Painting of Cement poles by Distember coating including cost of distember |
| 172 | Painting of Double Pole structure materials with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
| 173 | Painting of all clamps, other materials of Single Pole structure and painting of structure pole. |
| 174 | Service Connection Details painting |
| 175 | MISCELLANEOUS WORKS |
| 176 | Fixing and Dismantling of Single Phase Meter |
| 177 | Fixing and Dismantling of Three Phase Meter |
| 178 | Releasing and erection 1 ph SC wire [during conductoring or pole change] |
| 179 | Releasing and erection 3 ph SC wire [during conductoring or pole change(Non-CT)] |
| 180 | Releasing and erection 3 ph SC wire [during conductoring (With CT)] |
| 181 | Releasing and erection 3 ph SC wire [during pole change(With CT)] |
| 182 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) |
| 183 | Re-Earthing of structure completely |
| 184 | Provision of Street light with switching arrangement including fixing of meter, wiring & service board etc., |
| 185 | Cutting of Flat per cutting |
| 186 | Cutting of channel per cutting |
| 187 | Cutting of Angle per cutting |
| 188 | Cutting of pipe per cutting |
| 189 | Destruction of pole concreting at site |
| 190 | Retrieving grill from Deteriorated RCC pole |
| 191 | Fixing of Modem including accessories |
| 192 | Fixing of Name Board |
| 193 | Fixing of Danger Board |
| 194 | Engaging Machines for Works |
| 195 | Engaging Crane per Hour (for handling of poles, Metering set,DT etc) |
| 196 | Engaging Crane from next Hour onwards (for handling of poles, Metering set,DT etc) |
| 197 | Engaging JCB per Hour (for extension works & maintenance works etc) |
| 198 | Engaging JCB from next Hour onwards (for extension works & maintenance works etc) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender