Tender For Repair / Maintenance Of Centrifugal Pumps, Submersible Pumps And Other Connected Items At Various Pump Houses And Repair / Maintenance Of Central Ac Plant, 360 Tr At Admc & Connected Items Under Ge (North) Bangalore
Tender Overview
Project Description
Tender for Repair / Maintenance Of Centrifugal Pumps, Submersible Pumps And Other Connected Items At Various Pump Houses And Repair / Maintenance Of Central Ac Plant, 360 Tr At Admc & Connected Items Under Ge (North) Bangalore
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Sep-2026 | 8378Corrigendum | BOQ | 14-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling existing cooling tower side cover carefully without damaging the other portion of cooling tower, removing unserviceable PVC fills carefully from cooling tower and S&F new PVC fills for 200 TR capacity cooling tower including replacement of unserviceable bolts and Nuts etc all as directed. |
| 2 | Supply and fix removable type factory made mettalic pre -filters of 20 micron of standard size lift GI frame both side, including taking out unserviceable mettalic pre - filters etc all as directed Make- Acrosol / Dyna / Johnflower / MAF |
| 3 | Supply and fix factory made high performance bag filters of 99 micron down to 5 micron standard size with multiple pockets and self supporting filter bagswith MS / GI anodised aluminium frame suitable for central AC plant including replacement of bolts and nuts and taking down unserviceable bag filters etc all as directed Make- Acrosoi / MAF / Dyna / Johnflower |
| 4 | Supply and fix water pressure gauges of any size up to 0- 300 PSI/0-150Kg cm² capacity including taking out unserviceable water pressure gauge etc all as directed Make- KI / H-Guru / Feibeg / Adarsh |
| 5 | Supply and charge R-22 Refrigerent Gas Make Fluron / refron / mefron |
| 6 | Supply and fix AC power contact 4 pole 415 vots 50 Hz of the following capacity including taking out unserviceable contact etc all as directed Make- L&T / Siemens/ BCH / CSS.33 Amps to 63 A capacity MNX-32, 440 Volts AC Supply |
| 7 | All as per item No. 6 above but 250 amps to 300 Amps capacity 440 Volts AC |
| 8 | Disconnecting and isolating the compressor of Voltas 5H-120 model compressor from the system by putting dummy plates to suction and discharge valves, opening of the compressor, removing of internal parts, cleaning of the all parts throughly, replacement of minor spares like Thrust washers, O rings, minor parts like Nuts, Bolts etc reassembling back all the serviceable parts, removing of the dummy plate of the compressor, testing of compressor complete all as specified and as directed. Note : (i) Spare parts other than minor sapres & consunable will be measured & paid seperately (ii) charging of compressor oil will be measuredn& paid separately. |
| 9 | Supply and fix the following spares for model Voltas 5H-120 compressor including taking down old unserviceable spare parts complete all as specified and as directed.Main bearing pump and seal end |
| 10 | All as per item No. 9 above but Cylinder liner |
| 11 | All as per item No. 9 above but Connecting rod |
| 12 | All as per item No. 9 above but Discharge valve assembly |
| 13 | All as per item No. 9 above but Piston assembly |
| 14 | All as per item No. 9 above but Oil pump assembly |
| 15 | All as per item No. 9 above but Valve plate assembly |
| 16 | All as per item No. 9 above but Gasket set |
| 17 | All as per item No. 9 above but Oil filter |
| 18 | All as per item No. 9 above but SV reeds |
| 19 | All as per item No. 9 above but CR bearing |
| 20 | All as per item No. 9 above but SV spring |
| 21 | All as per item No. 9 above but Pressure release valve |
| 22 | Descaling of condensing unit of 120 TR capacity of air conditioning plants by circulating descaling agent (HCL) through the condenser by forced feed method, removing of the end cover of the condenser cleaning of each tube of condenser throughly by the brushing, refixing back the end cover of the condenser by removing of the rubber gasket, nuts, bolts, washers cleaning of spray nozzles, cooling tower cup, water line.strainer and testing spray nozzle working pressure all as specified and as directed. |
| 23 | Evacuation refrigerent gas from the system in to the empty cylinder of 120 TR capacity of air conditioning plants, leak testing of the plant with dry nitrogen (N2) pressure by seperating the entire system like low side high side, compressors, condensers and rectifing the leakage vaccummising, recharging of evaculated refrigerent gas, testing and brazing of cooling coil complete all as directed Note : (i) Supply of refregirent gas & consumable will be measured and paid separately (ii) Installed capacity of the plant to be considered. |
| 24 | Supply and fixing of the following pressure cut-outs including dismantling of unserviceable cut-outs all as specified and as directed Make- Indfoss / Danfoss.HP/LP Cut-outs |
| 25 | All as per item No. 24 above but for Oil Pressure cut-outs |
| 26 | All as per item No. 24 above but for Water pressure cut-outs Please Enable Macros to View BoQ information |
| 27 | All as per item No. 24 above but for Water pressure cut-outs Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender