Tender For Dismantling, Pulling 3X16mva, 3X25mva, 2X50mva Failed/Healthy Unit Pulling, Loading And Transportation Of 1X16, 1X25 And 1X50mva And Erection Of 2X16 Mva, 2X25 Mva And 1X50 Mva Healthy Unit Of 110Kv Class Power Transformer At Various Subst
Tender Overview
Project Description
Tender for Dismantling, Pulling 3X16mva, 3X25mva, 2X50mva Failed/Healthy Unit Pulling, Loading And Transportation Of 1X16, 1X25 And 1X50mva And Erection Of 2X16 Mva, 2X25 Mva And 1X50 Mva Healthy Unit Of 110Kv Class Power Transformer At Various Substations Where Ever It Is Required Running Contract Basis For A Period Of One Year.
BOQ
| Sl. No. | Item Description |
| 1 | Labour charges for Dismantling of Alu.busbars without bend 75 IPS.i) 16MVA (3x3) = 9ii) 25MVA (3x3) = 9iii) 50MVA (2x3) = 6 |
| 2 | Labour charges for dismantling of droppers and jumpers i) 16MVA (3x3) = 9ii) 25MVA (3x3) = 9iii) 50MVA (2x3) = 6 |
| 3 | LABOUR CHARGE FOR DISMANTLING of Power transformers and provision of suitable dummy paltes for all openings such as bushing fixures top of turrets oil pipe lines Bucholtz pipe lines cooler bank pipe lines and where ever necessary including crane charges. 16MVA |
| 4 | LABOUR CHARGE FOR DISMANTLING of Power transformers and provision of suitable dummy paltes for all openings such as bushing fixures top of turrets oil pipe lines Bucholtz pipe lines cooler bank pipe lines and where ever necessary including crane charges. 25MVA |
| 5 | Labour Charges for Dismantling of 50 MVA Auto Transformer and provision of suitable dummy paltes for all openings such as bushing fixures top of turrets oil pipe lines Bucholtz pipe lines cooler bank pipe lines and where ever necessary including crane charges. |
| 6 | Oil Draining from old Transformer using filter machine/Oil pump/Hose Etc., per liter excess Qty above 800 liters. (16MVA=3600+2400, 25MVA=4800+2800 50MVA=3800+2000) |
| 7 | Labour charges for Loading/ Unloading the transfomer including Raising and Lowering of power transformer using suitable jacks as many times as required with or without all accessories & oil for loading the transformer from existing plinth to safer place in the Same 110 KV SS. 16MVA-3x40MT=120MT, 25MVA-3x45MT=135MT, 50MVA-2x100MVA=200MT |
| 8 | Labour rate for pulling the transformer from plinth to truck or from plinth to safer place or from truck to plinth or Truck to safer place or safer place to plinth or truck where ever required. 16MVA-((3x35 MT)x30Mtrs)= 3150 MT/Mtr25MVA-((3x40MT)x30Mtrs) = 3600 MT/Mtr50MVA-((85x2MT)x30Mtrs) = 5100 MT/Mtr |
| 9 | Loading of empty drums from store or near by available SS to the work site for draining of oil(16MVA=30, 25MVA=36, 50MVA=60) |
| 10 | UnLoading of empty drums transported from store or near by available SS to the work site for draining of oil (16MVA=30, 25MVA=36, 50MVA=60) |
| 11 | Miscellaneous transport charges per truck per day trip over and average distance of 50 KM and RS 40 for every additional Kilometers for transporting of, Dummy plates, Empty drums, and other hardware items etc.,(supplied from Board side)(16MVA=3, 25MVA=3) |
| 12 | Transport charges per truck per day trip over and average distance of 100 KM and RS 25for every additional Kilometers for transporting of of 60 Nos empty MS barrels,Busbars from GCC-II/Store or available nearby Ss to allotted site(supplied from Board side) (2x1Trip) - 50MVA |
| 13 | Supply,Fabrication and provision of Light section materials including 125x65 MS Channels, /100x50 MS Channels, various sizes of angles and class 'B' pipes for cooler bank supports panel bottom frames, and fan frames and dummy plates of appropriate size whereever required as per the Field Engineer's instruction. (2*50) |
| 14 | Labour charge for erection of Power Transformer with turrets all HV/IV/LV bushings, cooler bank, Fans, oil pipe lines, Mashalling box, RTCC Panel and all accessories which ever is necessary for succesesful commissioning of the Transformer Including Crane charges. 16MVA |
| 15 | Labour charges for erection of Power Transformer with turrets all HV/IV/LV bushings, cable termination box, cooler bank A frame, Fans, Pumps, oil pipelines, Mashalling box, Cooler control cubicle, RTCC Panel and all accessories which ever is necessary for successful commissioning of the Transformer Including Crane charges. 25MVA |
| 16 | Labour charges for erection of Power Transformer with turrets all HV/IV/LV bushings, cable termination box, cooler bank A frame, Fans, Pumps, oil pipelines, Mashalling box, Cooler control cubicle, RTCC Panel and all accessories which ever is necessary for successful commissioning of the Transformer Including Crane charges. 50MVA |
| 17 | Oil filling per Liter excess Qty more than 800Liters.16MVA-(2x3400)= 6800 Litrs25MVA-(2x3400) = 6800 Litrs50MVA-(1x4400) = 4400 Litrs |
| 18 | Hot Oil circulation& filteration upto satisfactory value is achieved including provision of suitable filtering machine of appropriate capacity with 6/10KL Filter machine upto 50MVA and 10/12KLfor above 50MVA with minimum 50Mtrs supply cable.16MVA-(2x14000)= 28000 Litrs25MVA-(2x16000) =32000 Litrs50MVA-(1x30000) = 30000 Litrs |
| 19 | Provision of filtering Machine of appropriate capacity (16MVA=2, 25MVA=2) |
| 20 | Labour charge for laying control cables in trench/duct including bunching, alu tag indentification Upto 8 core (SSE Rate)(16MVA=0.960, 25MVA=1.160, 50MVA=1.500) |
| 21 | Labour charge for laying control cables in trench/duct including bunching, alu tag indentificationAbove 8 cores (SSE Rate)(16MVA=1.120, 25MVA=1.120, 50MVA=1.00) |
| 22 | Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours. 19 mm(16MVA=32, 25MVA=20, 50MVA=30) |
| 23 | Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours. 25 mm(16MVA=8, 25MVA=16, 50MVA=6) |
| 24 | Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours. 28 mm(16MVA=24, 25MVA=24, 50MVA=14) |
| 25 | Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours.32 mm(16MVA=12, 25MVA=12, 50MVA=6) |
| 26 | Supply & Termination of cable core end including the cost cable socket lug, ferrules,strap etc., as per cable schedule Each Terminal.16MVA-(2x320)= 64025MVA-(2x360) =72050MVA-(1x380) = 380 |
| 27 | Labour charges for earthing of Power Transformer tank and neutral at 2points, Marshalling Box, D.M.Box, RTCC Panel, Etc,. Including supply of 75x12mm M.S.Flat 16MVA |
| 28 | Labour charges for earthing of Power Transformer tank and neutral at 2points, Marshalling Box, D.M.Box, RTCC Panel, Etc,. Including supply of 75x12mm M.S.Flat (25MVA=2, 50MVA=1) |
| 29 | Labour charges for excavation and refilling per cubic meter16MVA-(2x3)= 625MVA-(2x3) =650MVA-(1x3) = 3 |
| 30 | Labour charges for Earthing of cooler fan of Power Transformers upto 16 MVA capacity using bare copper wires including cost of copper wires(min 10/12SWG) - 16MVA |
| 31 | Labour charges for Earthing of cooler fan of Power Transformers upto 16 MVA capacity using bare copper wires including cost of copper wires(min 10/12SWG) - (25MVA = 2, 50MVA=1) |
| 32 | Supply of Gasket 900X900X10mm (16MVA = 4, 25MVA=3, 50MVA = 3) |
| 33 | supply of Gasket 900X900X8mm (16MVA = 4, 25MVA=3, 50MVA=4) |
| 34 | supply of Gasket 900X900X6mm (16MVA = 4, 25MVA=2, 50MVA=3) |
| 35 | Labour charge for gasket cutting for 110 kV class transformers (16MVA =2, 25MVA=2, 50MVA=1) |
| 36 | Supply and ercetion of 110KV class OTI Thermometer of reputed make |
| 37 | Supply and ercetion of 110KV class WTI Thermometer of reputed make (25MVA =1, 50MVA=1) |
| 38 | Supply and erection of 36KV,2000A (M40) LV terminal brass clamp with SS screw,nuts, washers and bimettalic sheets (16MVA =1, 50MVA=1) |
| 39 | Supply and erection of 36KV,800A (M30) LV terminal brass clamp with SS screw,nuts, washers and bimettalic sheets |
| 40 | Labour charges for Painting including supply of branded Aluminium paint 16MVA |
| 41 | Labour charges for Painting including supply of branded Aluminium paint 25MVA |
| 42 | Labour charges for Painting including supply of branded Aluminium paint 50MVA |
| 43 | Labour charges for skilled man power Assistance during bushing CT testing, Pre commissioning testing of Power / Auto Transformers Minimum 2 Labours for Transformers upto 33 kV class , 3 Labours for Transformers upto 110 kV class and 6 Labours for ICT's, Reactors from 230 kV and above (16MVA=2, 25MVA=2, 50MVA=1) |
| 44 | Checking of healthines of wiring in DM Bos,OLTC and RTCC panels and rewiring if required(16MVA=1, 25MVA=1, 50MVA=1) |
| 45 | Additional charges for attending lekages in radiators and other places by welding bracing etc., and checking of healthiness after rectification as directed by the field Engineer (16MVA=2, 25MVA=2, 50MVA=2) |
| 46 | Labour Charges for cleaning of Old/Released 110Kv class Transformer including supply of washing and cleaning materials (16MVA=2, 25MVA=2, 50MVA=2) |
| 47 | Breather with indication type silicagel Blue 5KG container with oil cup flange mounting Type(16MVA=2, 25MVA=2, 50MVA=2) |
| 48 | Breather with indication type silicagel Blue 1KG container with oil cup flange mounting Type(16MVA=2, 25MVA=2, 50MVA=1) |
| 49 | Labour charges for overhauling of fans including replacement of bearings, shafts, washers etc.,(16MVA=2, 25MVA=2, 50MVA=2) |
| 50 | Labour charges for overhauling and rewinding of fans including replacement of bearings, shafts, washers etc., (16MVA=2, 25MVA=2, 50MVA=1) |
| 51 | Supply and provision of various sizes of GI /Yellow bolts and Nuts , with washers and foundation bolts for cooler bank A frames Cooling pumps/pipes supports, Marshalling box cooler control cubicles cable box covers and where ever necessary as per direction of the Field Engineer. Per KG ( M8,M9,M10,M12,M16, M 19, M 25)( SSE /CNI Rates Item No S 1) (16MVA=30, 25MVA=40, 50MVA=25) |
| 52 | Writing/Stickering of the Power Transformer/Auto Tr/ICT/Reactor, Marshalling box,DM box, RTCC panel, Cooler control cabinet, Fan and Pump etc., including material with dark Blue enamel paint. Letter size should be minimum height 80 mm and thickness 10 mm. (16MVA=2, 25MVA=2, 50MVA=2) |
| 53 | Marshalling box door glass beeding(16MVA=1, 25MVA=1) |
| 54 | Marshalling box door beding |
| 55 | Labour for Provison of 75mm busbar with making required bends (16MVA=6, 25MVA=6) |
| 56 | Labour For Provison of LV jumpers Single zebra (16MVA=6, 25MVA=6) |
| 57 | Miscellaneous transport charges per truck per day trip over and average distance of 50 KM and RS 40 for every additional Kilometers for transporting of control cable, , Additional Transformer oil, , control cables, Dummy plates etc.,(supplied from Board side) 16MVA |
| 58 | Transport charges per truck per day trip over and average distance of 100 KM and RS 25for every additional Kilometers for transporting Spillage oil barrels control cables and busbars (25MVA=2, 50MVA=1) |
| 59 | Labour charges for overhauling and rewinding of oil pumps incuding replacement of bearings , shafts , washers etc., (25MVA=2, 50MVA=1) |
| 60 | Labour charges for overhauling of oil pumps incuding replacement of bearings , shafts , washers etc., 50MVA |
| 61 | Supply and Erection of 110 V DC contactors |
| 62 | Supply and Erection of 440V/230V AC contactors |
| 63 | Supply and Erection of MCBs 63A,32A (4-pole) |
| 64 | Timer |
| 65 | LED Bulb 5W |
| 66 | Tap changer raise/Lower Button |
| 67 | Labour charges of loading of Spillage oil, Topup oil and Control cables from Tantransco store to allotted SS. (Spillagae Oil-8 barrels =1.6MT, control cable upto 8 core 1.5x1600Kg/km = 2.4MT, control cable above 8 core 1x2750Kg/km = 2.75MT) |
| 68 | Labour charges of Unloading of Spillage oil, Topup oil and Control cables from Tantransco store to allotted SS. (8 barrels =1.6MT, control cable upto 8 core 1.5x1600Kg/km =2.4MT, control cable above 8 core 1x2750/km =2.75MT) |
| 69 | Labour charges for loading of the Transformers including Raising and lowering of Power transformers using suitable jacks as many times as required with or without accessories and oil for loading the transformers from plinth or safe place to truck or shifting as required at site and using crane where ever required.(16MVA=40, 25MVA=45, 50MVA=100) |
| 70 | Labour charges for pulling Power transformers from plinth or safer place to truck/ from truck to plinth or safer place / from safer place to plinth in same SS as required by site Engineer for transportation or dismantling/erection (40MTx35 Meters=1400 M/Mtr.16MVA - 35MTx40Mtrs=1400 MT/Mtrs25MVA - 35MTx40Mtrs=1400 MT/Mtrs50MVA - 85MTx30Mtrs =2550 MT/Mtrs |
| 71 | Labour charges for Un loading of the Transformers including Raising and lowering of Power transformer using suitable jacks as many times as required with or without acessories and oil for unloading the transformers from truck to plinth or safe place as required at site and using crane where ever required (16MVA=40, 25MVA=45, 50MVA=100) |
| 72 | Category C : Minimum Transport Charges to be adopted for transformers above 30 MT UPTO 50 MT and 50 KM range within Chennai city limit / Category D : Minimum Transport Charges to be adopted for transformers above 30 MT UPTO 50 MT and 100 KM range out side Chennai city limit including Transformer oil and with all accessories.(16MVA=1, 25MVA=1) |
| 73 | Category E: Minimum Transport Chrge to be adopted for transformers above 50 MT upto and including 100 MT and 50 KM range within chennai city limit (or) Category F: Minimum Transport Charge to be adopted for transformers above 50 MT upto 100 MT and 100 KM range outside chennai city including Transformer oil and with all accessories. |
| 74 | Normal Transport Charges to be adopted for transportation Outside chennai limit16MVA - 40 MTx 150 kM = 600025MVA - 45 MTx 150 kM = 6750100MVA - 100 MTx 75 kM = 7500 |
| 75 | GST for bidders within TamilNadu |
| 76 | GST for bidders outside TamilNadu (IGST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender