Tender For Civil Works For Increasing Capacity (2X63+3X60) Mva To (3X63+3X60) Mva Along With Construction Of 132 Kv Bay At 220 Kv Sub Station, Sikandra (Agra)

Issued by Boards / Undertakings / PSU · Agra, Uttar Pradesh
Tender Value
67.56 Lakhs
Estimated cost
Bid Submission
21 Oct 2026
26 days left
EMD
1.35 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Civil Works For Increasing Capacity (2X63+3X60) Mva To (3X63+3X60) Mva Along With Construction Of 132 Kv Bay At 220 Kv Sub Station, Sikandra (Agra)

BOQ

Name of Work:- Civil Works for Increasing Capacity (2x63+3x60) MVA to (3x63+3x60) MVA along with Construction of 132 KV Bay at 220 KV Sub Station, Sikandra (Agra)
Sl. No. Item Description
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(CSI No 2.31)
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. in All kinds of soil (CSI NO 2.8.1)
3Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil (CSI No 2.26.1)
4Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (CSI No. 2.27)
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (CSI No. 4.1.8)
6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (CSI No. 4.1.2)
7Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) ( CSI No. 5.1.2)
8Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (CSI No. 5.3)
9Centering and shuttering including strutting, propping etc. and removal of form work for :CCFoundations, footings, bases for columns (CSI No 4.3.1)
10Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. (CSI No. 5.9.3)
11Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. (CSI No. 5.9.1)
12Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (CSI No. 5.9.2)
13Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (CSI No. 5.22.6)
14Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand). (CSI No. 6.1.1)
15Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand). (CSI No. 6.1.2)
16Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand). (CSI No. 6.4.2)
17Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (CSI No. 10.1)
18Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (CSI No. 10.2)
19Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. (CSI No. 11.2)
2012 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand). (CSI No. 13.4.1)
21Neat cement punning. (CSI No 13.18)
22Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.(CSI no. 13.62.1)
23Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. (CSI No. 15.3)
24Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. (CSI No. 15.7.4)
25Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire. (CSI No. 16.18.1)
26Extra for providing and mixing hardening compound of approved quality as per manufacturer's specification in cement concrete. (CSI No. 16.44)
27Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) (CSI No. 16.45)
28Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm. (CSI No. 16.70.1)
29Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately). (CSI No 16.75-16.76)
30Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. (CSI No. 16.91.2)
31Brick work in foundation & plinth with old dismantled bricks (supplied by department free of cost) and coarse sand mortar in 1:6 including supply of all other materials, labour, removing mortar & cleaning of old & used bricks,T&P etc complete.(SOR NSI No. 3)
32Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment but when steel is to be provided by the department. (SOR NSI No. 12)
33Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work. (NSI No. 13)
34Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (SOR NSI No. 14)
35Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (SOR NSI No. 15)
36Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (SOR NSI No. 9.15)
37Grouting of 90/105 lbs M.S. rail including cost of all materials, labour & T&P for fixing of rail in proper alignment, level and position in transformer plinth foundation etc. as per direction of Eng I/C. (Rail to be supplied by the dept.)(labour rates only) .(NSI No. 18)
38S/F in position 90 lbs M.S. Rail for transformer plinth including cost of all labour, material and T&P etc. required for proper completion of the work. (NSI No. 19)
39Grouting of vertical or inclined post of pale/chain/security fencing in true level, alignment and in plumb or inclination as required, including cost of all labour, materials and T&P required for proper completion of work. ( Post and concrete for grouting shall be measured separately) .(SOR NSI No. 21)
40Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) .(SOR NSI No. 22)
41Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (SOR NSI No. 23)
42Fixing of template in position level and alignment for grouting of Anchor bolt in Auxiliary Structure. (labour rate only). (SOR NSI No. 24)
43Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only).(SOR NSI No. 25)
44Fabrication of template for main gantry foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). (SOR NSI No. 26)
45Same as above NSI item no.-26 but for auxiliary foundations.(Labour Rate) (SOR NSI No. 27)
46Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (SOR NSI No. 34)
472.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (SOR NSI No. 35)
484.0cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (SOR NSI No. 36)
49Dismantling of existing pale / security / chain link fencing including post and stacking properly as per direction of the Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (SOR NSI No. 38)
50Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (SOR NSI No. 58) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57646212
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 67.56 Lakhs
LAST DATE 21-10-2026
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender for Civil Works For Increasing Capacity (2X63+3X60) Mva To (3X63+3X60) Mva Along With Construction Of 132 Kv Bay At 220 Kv Sub Station, Sikandra (Agra)
Basic Detail
Tender No Tender No-17/ECTC/A/2026-27
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 22 Sep 2026
Submission Date 21 Oct 2026
Open Date 22 Oct 2026
Finance
Tender Value 67.56 Lakhs
Tender Fee 5900
EMD 1.35 Lakhs
Exemption Not Available
Document List
BOQ_2239927.xls
d19c9c62-75f7-44c5-9bd1-5efdab420b70.html
T17.rar
Tendernotice_1 (76).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 26 days
Oct 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 27 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_2239927.xls

html

d19c9c62-75f7-44c5-9bd1-5efdab420b70.html

rar

T17.rar

pdf

Tendernotice_1 (76).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders