Tender For Purchase Of Networking Components, Cabling And Installation To Establish The Internet Connectivity Through Optical Fiber Cabling (Ofc) To The New Buildings - 6 Nos., Bharathiar Research Centre And Drdo Guest House
Tender Overview
Project Description
Tender for Purchase Of Networking Components, Cabling And Installation To Establish The Internet Connectivity Through Optical Fiber Cabling (Ofc) To The New Buildings - 6 Nos., Bharathiar Research Centre And Drdo Guest House , Purchase Of Networking Components, Cabling And Installation To Establish The Internet Connectivity Through Optical Fiber Cabling (Ofc) To The New Buildings - 6 Nos., Bharathiar Research Centre And Drdo Guest House , Single Mode 12 Core Ofc Cable (Outdoor) Isi Brand Make - Commscope, R&M , Hdpe 40/33 Mm Duct Pipe Including Push Fit Duct Coupler, Cable Sealing Plug , 19 12U 600Mm Depth Wall Mount Rack + Power Distribution Unit (6X5/15A) + 2 Nos Cooling Fan 230V Ac + Mounting Hardware (20 Nos) Make - Netrack, Valrack, Legrand , 12 Port Fully Loaded Liu Rack Mount (I.E., Included Pigtail, Duplex Coupler And Other Accessories If Any) Make - Netrack, Commscope, Legrand , 1 Pvc Conduit With Fixing Accessories (Colour - Blue) , Single Mode Sc-Lc Duplex Optic Fiber Patch Cord 3 Mtr Make - Commscope, R&M , Cisco C9200l-24P- 4G - E, Catalyst 9200L 24-Port Poe+, 4 X 1G, Network Essentials, Sntc-8X5xnbd - Catalyst 9200L-24P-Poe+, 4 X 1G, Net, Con-Snt-C9200l-24P - 36, Cab-Ta-In - India Ac Type A Power Cable 3 Years Warranty , Ofc Cable Laying Charges , Hdpe Pipe Laying Charges , Trenching Work - The Soil Trench Should Be 200 Cm Depth Throughout The Cable Path. The Warning Tape (Which Should Not Be Affected By Water & Mud) Should Be Placed Above 2 Feet Of The Hdpe Pipe. The Concreate Ofc Route Marker Should Be Placed At Every 30 Meters Before Refilling The Trench. , Road Cutting Irrespective Of Soil Condition Upto 6 Feet Depth & Refilling And Re-Surfacing With Concrete / Tar , Concreate Ofc Route Marker (5 Feet Height, ¾ Feet Breadth, 5 Thickness). The Marker Should Be Painted With Ofc Bu And The Letter Should Be Clearly Visible. , Concrete Ring With Top Closure (3 Feet Diameter, 2 Feet Height & 2-Inch Thickness) , A. Charges For Rack & Liu Fixing And Ofc Splicing Charges
BOQ
| Sl. No. | Item Description |
| 1 | Purchase of Networking Components, Cabling and Installation to establish the internet connectivity through Optical Fiber Cabling (OFC) to the New Buildings – 6 Nos., Bharathiar Research Centre and DRDO Guest House |
| 2 | Single mode 12 core OFC Cable (Outdoor) ISI Brand Make – Commscope, R&M |
| 3 | HDPE 40/33 mm Duct pipe including Push Fit Duct coupler, Cable Sealing Plug |
| 4 | 19\\" 12U 600mm Depth Wall Mount Rack + Power Distribution Unit (6x5/15A) + 2 No's Cooling Fan 230V AC + Mounting Hardware (20 Nos)Make – Netrack, Valrack, Legrand |
| 5 | 12 port Fully loaded LIU Rack Mount (i.e., Included Pigtail, Duplex Coupler and other Accessories if any) Make – Netrack, Commscope, Legrand |
| 6 | 1\\" PVC Conduit with Fixing Accessories (Colour – Blue) |
| 7 | Single Mode SC-LC Duplex Optic Fiber Patch Cord 3 mtr Make – Commscope, R&M |
| 8 | Cisco C9200L-24P- 4G – E, Catalyst 9200L 24-port PoE+, 4 x 1G, Network Essentials, SNTC-8X5XNBD - Catalyst 9200L-24P-PoE+, 4 x 1G, Net, CON-SNT-C9200L-24P – 36, CAB-TA-IN - India AC Type A Power Cable 3 years warranty |
| 9 | OFC Cable laying charges |
| 10 | HDPE pipe laying charges |
| 11 | Trenching Work - The Soil trench should be 200 cm depth throughout the cable path. The warning tape (which should not be affected by water & mud) should be placed above 2 feet of the HDPE Pipe. The Concreate OFC Route Marker should be placed at every 30 meters before refilling the trench. |
| 12 | Road Cutting irrespective of Soil Condition upto 6 Feet Depth & Refilling and Re-Surfacing with Concrete / Tar |
| 13 | Concreate OFC Route Marker (5 Feet Height, ¾ Feet Breadth, 5\\" Thickness). The Marker should be painted with “OFC BU” and the letter should be clearly visible. |
| 14 | Concrete Ring with Top Closure (3 feet Diameter, 2 feet Height & 2-inch Thickness) |
| 15 | a. Charges for Rack & LIU Fixing and OFC Splicing Charges Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender