Tender For Maintenance Of Completed Scheme Narela Zone.Sub-Head : Running, Operation And Comprehensive Maintenance Of 02 Nos. Sewage Water Treatment Plant Of Capacity 320 Kld & 600 Kld I/C D.G. Sets Installed At Housing Pocket-14, Sector A1 To A4, Na
Tender Overview
Project Description
Tender for Maintenance Of Completed Scheme Narela Zone.Sub-Head : Running, Operation And Comprehensive Maintenance Of 02 Nos. Sewage Water Treatment Plant Of Capacity 320 Kld & 600 Kld I/C D.G. Sets Installed At Housing Pocket-14, Sector A1 To A4, Narela.
BOQ
| Sl. No. | Item Description |
| 1 | Running and operation of 02 nos. sewage water treatment plant of capacity 320 KLD & 600 KLD based on MBBR technology by deploying 3 nos. STP cum D.G. operators and 1 no. Khallasi i/c loading of consumable materials/ items etc. as per inventory and terms and conditions attached. |
| 2 | Supplying of consumable materials for 320 KLD Sewage Treatment Plant designed on moving bed bio reactor technology such as UREA, DAP, CHLORINE, BIO CULTURE, Filter Media, Cartridge Filters, and other consumable as per norms and as per maintenance schedule for successful operation of the plants to get desired water quality i/c monthly water testing as per the terms and condition. |
| 3 | Supplying of consumable materials for 600 KLD Sewage Treatment Plant designed on moving bed bio reactor technology such as UREA, DAP, CHLORINE, BIO CULTURE, Filter Media, Cartridge Filters, and other consumable as per norms and as per maintenance schedule for successful operation of the plants to get desired water quality i/c monthly water testing as per the terms and condition. |
| 4 | Comprehensive Maintenance of 320 KLD Sewage Treatment Plant designed on moving bed bio reactor technology as per the inventory, terms and condition attached, all type of material, for the repairing/ replacement of defective parts including supplying and replacement of electric panels along with its inbuilt components, switches, cables, diffusors, blowers, blower’s motor, oil, air filters, blower’s bearing and belts, pumps and motors sets, pipes (CI/GI), Pipeline’s fittings, valves andother allied accessories complete etc., as and whenever required along with regular cleaning of bar-screen, OGT chamber and disinfecting of chlorine contact tank and clear / treated water tanks with proper use of required chemicals and machinery i.e. chemical spray guns, portable oxygen supplycylinder with face masks and body suits.as per the inventory, terms and condition attached, all type of material, for repairing, repair/replacement of defective parts including supplying and replacement of electric panels, cables, pump and motor sets, pipes, valves and other allied accessories complete etc. asrequired. |
| 5 | Comprehensive Maintenance of 0.6 MLD Sewage Treatment Plant designed on moving bed bio reactor technology as per the inventory, terms and condition attached, all type of material, for the repairing/replacement of defective parts including supplying and replacement of electric panels along with its inbuilt components, switches, cables, diffusors, blowers, blower’s motor, oil, air filters, blower’s bearing and belts, pumps and motors sets, pipes (CI/GI), Pipeline’s fittings, valves and other allied accessories complete etc., as and whenever required along with regular cleaning of bar-screen, OGT chamber and disinfecting of chlorine contact tank and clear / treated water tanks with proper use of required chemicals and machinery i.e. chemical spray guns, portable oxygen supply cylinder with face masks and body suits.as per the inventory, terms and condition attached, all type of material, for repairing, repair/replacement of defective parts including supplying and replacement of electric panels, cables, pump and motor sets, pipes, valves and other allied accessories complete etc. as required. |
| 6 | Servicing of 50 KVA D.G. set (kirloskar make) including replacement of the following items complete with testing on full load etc. as required. (a) Fuel Filter Primary Element – 1 No.(b) Fuel Filter Secondary Element - 1No. (c) PRIMARY ELEMENT AIR CLEANER - 1 no. (d) Safety ELEMENT AIR CLEANER - 1 no. (e) Lube Oil filter - 1 Nos. (f) Engine oil - 20 ltr(g) Coolant - 5 Litre |
| 7 | Servicing of 82.5 KVA D.G. set (kirloskar make) including replacement of the following items complete with testing on full load etc. as required. (a) Primary Element – 1 no. (b) Seconadry Element - 1 no. (c) Water Separator - 1 no. (d) Safety ELEMENT AIR Filter 1 no. (e) Lube Oil Filter - 1 No. (f) Engine oil - 20 ltr (g) Coolant - 5 Litre |
| 8 | Providing High Speed Diesel (HSD) for testing/ trial run of various DG Sets as per inventory, to keep all the DG Sets functional in all respect during the contract period. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender