Tender For Repairing And Reconditioning Of 110 Kv Class Sick Power Transformers Of Various Capacities Available Within The Jurisdiction Of Transmission Projects-I/Chennai Region And Erection At Alloted Ss After Rectification For A Period Of Two Years
Tender Overview
Project Description
Tender for Repairing And Reconditioning Of 110 Kv Class Sick Power Transformers Of Various Capacities Available Within The Jurisdiction Of Transmission Projects-I/Chennai Region And Erection At Alloted Ss After Rectification For A Period Of Two Years.
BOQ
| Sl. No. | Item Description |
| 1 | Supply of materials & Labour Charges for 10 MVA Power Transformer |
| 2 | Supply of materials & Labour Charges for 16 MVA Power Transformer |
| 3 | Supply of materials & Labour Charges for 25 MVA Power Transformer |
| 4 | Supply of materials & Labour Charges for 50 MVA Power Transformer |
| 5 | HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 6 | LV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 7 | Core bolt with insulation/Tie band |
| 8 | Insulating materials |
| 9 | HV bushings with metal parts |
| 10 | LV bushings with metal parts |
| 11 | 1000 Amps |
| 12 | 2000 Amps |
| 13 | HV bushing connector |
| 14 | LV bushing connector (Bi-metallic connector complete set) |
| 15 | M20 for single zebra |
| 16 | M30 for single zebra |
| 17 | M40 for single zebra |
| 18 | M50 for single zebra |
| 19 | Core Lamination sheets |
| 20 | Oil Temperature Indicator |
| 21 | Winding Temperature Indicator |
| 22 | Magnetic oil Gauge |
| 23 | Buchholz Relay |
| 24 | Butterfly valve |
| 25 | Neoprene Gasket |
| 26 | New Transformer Oil |
| 27 | Silicagel indicating type breather |
| 28 | OLTC transition resistance |
| 29 | Bushing CTs |
| 30 | HV CT |
| 31 | LV CT |
| 32 | Winding CTs |
| 33 | PRV (Main tank/OLTC) |
| 34 | Surge Relay to match the existing make(BHEL/CTR/OLG/NGEF/TELK) |
| 35 | Cooling Pump |
| 36 | Transformer wheels |
| 37 | Radiators |
| 38 | Contactors |
| 39 | DC Contactors |
| 40 | AC Contactors |
| 41 | Remote/ Local switches |
| 42 | Heater/Thermostat |
| 43 | Heater switch |
| 44 | Step down transformer of 415/110V |
| 45 | Time Delay Relay |
| 46 | Selector switches |
| 47 | Tap position indicators |
| 48 | New RTCC panel |
| 49 | Ladder |
| 50 | OLTC operating handle |
| 51 | Motor rewinding |
| 52 | Single phase preventer |
| 53 | Wheel shaft |
| 54 | Wheel valves 25mm |
| 55 | Wheel valves 40mm |
| 56 | Wheel valves 80mm |
| 57 | LV rod with Nut, washer, cup |
| 58 | HV bushing stem |
| 59 | M-Box door beading |
| 60 | HV Thimble and cotter pin |
| 61 | Door lock and beading |
| 62 | Fuse carrier |
| 63 | Terminal block |
| 64 | Base plate with gland hole |
| 65 | Tap changer raise lower push button |
| 66 | Door lock |
| 67 | Hooter/Buzzer |
| 68 | Annunciator window |
| 69 | 16 window |
| 70 | 20 window |
| 71 | 24 window |
| 72 | Cooling fan blade |
| 73 | MCB Pole (4) |
| 74 | MCB Pole (3) |
| 75 | MCB pole (2) |
| 76 | Cooling fan bearing |
| 77 | Control Cables |
| 78 | 4x2.5 sqmm |
| 79 | 8x2.5 sqmm |
| 80 | 14x2.5 sqmm |
| 81 | 20x2.5 sqmm |
| 82 | 4x4 sqmm |
| 83 | 8x4 sqmm |
| 84 | Cable glands |
| 85 | Oil Flow Indicator |
| 86 | Marshalling box- Door glass |
| 87 | DM -Box Door glass |
| 88 | Door glass beading |
| 89 | Thermostat switch |
| 90 | Cable gland |
| 91 | Neutral MS flat 65x10 mm |
| 92 | Support insulator-33kv/22kV PT insulator |
| 93 | HV connecting clamp terminal suitable for 145kV 800A bushing & (90mm) 3\\" IPS Al busbat with 2 copper flexible wires and bimetallic sheets for flexible end lugs as per IS:5561 |
| 94 | 110kV bushing pin |
| 95 | Retrieving switch |
| 96 | LV terminal brass clamp with SS screw washer, nuts and bimetallic sheets |
| 97 | 36kV 2000A(M40) |
| 98 | 36kV 800A (M30) |
| 99 | 36kV 630A (M20) |
| 100 | LV terminal Aluminium connector with screw washers nuts as per IS 5561 |
| 101 | Single zebra take off Al clamp |
| 102 | Double zebra take off Al clamp |
| 103 | CT terminal board. (Damaged terminal board are to be converted to bushing type) |
| 104 | Link plate per phase |
| 105 | M16 x 120mm brass stud for link board 6 nuts + 4 spring washer |
| 106 | Fasteners MS cadmium plated of various sizes with 2 nos. washers |
| 107 | Disconnecting TB - M4 stud type |
| 108 | Add on block - 2 NO & 2 NC |
| 109 | Selector switch knob |
| 110 | HV bushing Terminal (Timble) Tinned copper |
| 111 | M30 for 245kV bushing |
| 112 | M30 for 145kV bushing |
| 113 | FRP tube |
| 114 | DM box 3ph motor |
| 115 | Resistor assembly in DM box for Remote tap position indicator |
| 116 | LV porcelain bushing 33kV/2000A |
| 117 | Fan guard suitable for 600mm Industrial type cooling fan |
| 118 | Master follower switch |
| 119 | Surge ring |
| 120 | Cooler bank valve cap |
| 121 | Radiator tie band |
| 122 | Neutral link(Omega) |
| 123 | Neutral bushing |
| 124 | OLTC Dova oil seal full set |
| 125 | Dismantling the accessories and drain Oil upto the required level |
| 126 | Charges for transporting transformer along with accessories from the site to the firm's works |
| 127 | Insurance for transit and storage period at firm’s works (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 128 | Loading charges at site |
| 129 | Unloading charges at firm's works |
| 130 | Removal of defective coil after dismantling yoke channel and laminations |
| 131 | Charges for detailed examination of transformer towards identification of defects |
| 132 | Fixing of healthy coil including insulation materials and fixing of lamination & yoke Channel |
| 133 | Bracing, tapping, take off leads of new winding and formation of star connections & fixing frame |
| 134 | Reconditioning of oil |
| 135 | Preliminary drying out of core and winding at hot air chamber |
| 136 | Overhauling of OLTC mechanism & contacts and testing the same |
| 137 | Cleaning of tank, overhauling the radiators including welding charges, conservator, Buchholz Relay test & renewal ofgaskets |
| 138 | Core and winding tanking and connecting to tapping leads and fixing metal parts of both HV& LV. |
| 139 | Checking of healthiness of wiring in DM Box, Marshalling box, RTCC panel and Rewiring, if required. (Including replacement of if any damaged/missing indicator lamp, door lamp, holder, selector push button ) |
| 140 | Testing of relay contact at the time Of final inspection |
| 141 | Modification of turrets, wherever Required |
| 142 | Testing of CTs (ratio, knee point voltage Required etc.) at the time of final inspection |
| 143 | Fabrication of pipelines, MS rinf, yoke channel, MS channel |
| 144 | Top cover fixing and assembly of HV and LV bushings |
| 145 | IR value improvement |
| 146 | Painting of transformer (outside) with Red oxide primer at Factory/works and final enamel painting at allotted site before commissioning |
| 147 | Transport of repaired unit and accessories from firm's works to the allotted site |
| 148 | Insurance for transit & 90 days storage at site (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 149 | Loading charges at firm's works |
| 150 | Unloading charges of the repaired unit at the allotted site |
| 151 | Re-insulation of coils |
| 152 | HV coil |
| 153 | LV coil |
| 154 | HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 155 | LV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 156 | Core bolt with insulation/Tie band |
| 157 | Insulating materials |
| 158 | HV bushings with metal parts |
| 159 | LV bushings with metal parts |
| 160 | 1000 Amps |
| 161 | 2000 Amps |
| 162 | HV bushing connector |
| 163 | LV bushing connector (Bi-metallic connector complete set) |
| 164 | M20 for single zebra |
| 165 | M30 for single zebra |
| 166 | M40 for single zebra |
| 167 | M50 for single zebra |
| 168 | Core Lamination sheets |
| 169 | Oil Temperature Indicator |
| 170 | Winding Temperature Indicator |
| 171 | Magnetic oil Gauge |
| 172 | Buchholz Relay |
| 173 | Butterfly valve |
| 174 | Neoprene Gasket |
| 175 | New Transformer Oil |
| 176 | Silicagel indicating type breather |
| 177 | OLTC transition resistance |
| 178 | Bushing CTs |
| 179 | HV CT |
| 180 | LV CT |
| 181 | Winding CTs |
| 182 | PRV (Main tank/OLTC) |
| 183 | Surge Relay to match the existing make(BHEL/CTR/OLG/NGEF/TELK) |
| 184 | Cooling Pump |
| 185 | Transformer wheels |
| 186 | Radiators |
| 187 | Contactors |
| 188 | DC Contactors |
| 189 | AC Contactors |
| 190 | Remote/ Local switches |
| 191 | Heater/Thermostat |
| 192 | Heater switch |
| 193 | Step down transformer of 415/110V |
| 194 | Time Delay Relay |
| 195 | Selector switches |
| 196 | Tap position indicators |
| 197 | New RTCC panel |
| 198 | Ladder |
| 199 | OLTC operating handle |
| 200 | Motor rewinding |
| 201 | Single phase preventer |
| 202 | Wheel shaft |
| 203 | Wheel valves 25mm |
| 204 | Wheel valves 40mm |
| 205 | Wheel valves 80mm |
| 206 | LV rod with Nut, washer, cup |
| 207 | HV bushing stem |
| 208 | M-Box door beading |
| 209 | HV Thimble and cotter pin |
| 210 | Door lock and beading |
| 211 | Fuse carrier |
| 212 | Terminal block |
| 213 | Base plate with gland hole |
| 214 | Tap changer raise lower push button |
| 215 | Door lock |
| 216 | Hooter/Buzzer |
| 217 | Annunciator window |
| 218 | 16 window |
| 219 | 20 window |
| 220 | 24 window |
| 221 | Cooling fan blade |
| 222 | MCB Pole (4) |
| 223 | MCB Pole (3) |
| 224 | MCB pole (2) |
| 225 | Cooling fan bearing |
| 226 | Control Cables |
| 227 | 4x2.5 sqmm |
| 228 | 8x2.5 sqmm |
| 229 | 14x2.5 sqmm |
| 230 | 20x2.5 sqmm |
| 231 | 4x4 sqmm |
| 232 | 8x4 sqmm |
| 233 | Cable glands |
| 234 | Oil Flow Indicator |
| 235 | Marshalling box- Door glass |
| 236 | DM -Box Door glass |
| 237 | Door glass beading |
| 238 | Thermostat switch |
| 239 | Cable gland |
| 240 | Neutral MS flat 65x10 mm |
| 241 | Support insulator-33kv/22kV PT insulator |
| 242 | HV connecting clamp terminal suitable for 145kV 800A bushing & (90mm) 3\\" IPS Al busbat with 2 copper flexible wires and bimetallic sheets for flexible end lugs as per IS:5561 |
| 243 | 110kV bushing pin |
| 244 | Retrieving switch |
| 245 | LV terminal brass clamp with SS screw washer, nuts and bimetallic sheets |
| 246 | 36kV 2000A(M40) |
| 247 | 36kV 800A (M30) |
| 248 | 36kV 630A (M20) |
| 249 | LV terminal Aluminium connector with screw washers nuts as per IS 5561 |
| 250 | Single zebra take off Al clamp |
| 251 | Double zebra take off Al clamp |
| 252 | CT terminal board. (Damaged terminal board are to be converted to bushing type) |
| 253 | Link plate per phase |
| 254 | M16 x 120mm brass stud for link board 6 nuts + 4 spring washer |
| 255 | Fasteners MS cadmium plated of various sizes with 2 nos. washers |
| 256 | Disconnecting TB - M4 stud type |
| 257 | Add on block - 2 NO & 2 NC |
| 258 | Selector switch knob |
| 259 | HV bushing Terminal (Timble) Tinned copper |
| 260 | M30 for 245kV bushing |
| 261 | M30 for 145kV bushing |
| 262 | FRP tube |
| 263 | DM box 3ph motor |
| 264 | Resistor assembly in DM box for Remote tap position indicator |
| 265 | LV porcelain bushing 33kV/2000A |
| 266 | Fan guard suitable for 600mm Industrial type cooling fan |
| 267 | Master follower switch |
| 268 | Surge ring |
| 269 | Cooler bank valve cap |
| 270 | Radiator tie band |
| 271 | Neutral link(Omega) |
| 272 | Neutral bushing |
| 273 | OLTC Dova oil seal full set |
| 274 | Dismantling the accessories and drain Oil upto the required level |
| 275 | Charges for transporting transformer along with accessories from the site to the firm's works |
| 276 | Insurance for transit and storage period at firm’s works (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 277 | Loading charges at site |
| 278 | Unloading charges at firm's works |
| 279 | Removal of defective coil after dismantling yoke channel and laminations |
| 280 | Charges for detailed examination of transformer towards identification of defects |
| 281 | Fixing of healthy coil including insulation materials and fixing of lamination & yoke Channel |
| 282 | Bracing, tapping, take off leads of new winding and formation of star connections & fixing frame |
| 283 | Reconditioning of oil |
| 284 | Preliminary drying out of core and winding at hot air chamber |
| 285 | Overhauling of OLTC mechanism & contacts and testing the same |
| 286 | Cleaning of tank, overhauling the radiators including welding charges, conservator, Buchholz Relay test & renewal ofgaskets |
| 287 | Core and winding tanking and connecting to tapping leads and fixing metal parts of both HV& LV. |
| 288 | Checking of healthiness of wiring in DM Box, Marshalling box, RTCC panel and Rewiring, if required. (Including replacement of if any damaged/missing indicator lamp, door lamp, holder, selector push button ) |
| 289 | Testing of relay contact at the time Of final inspection |
| 290 | Modification of turrets, wherever Required |
| 291 | Testing of CTs (ratio, knee point voltage Required etc.) at the time of final inspection |
| 292 | Fabrication of pipelines, MS rinf, yoke channel, MS channel |
| 293 | Top cover fixing and assembly of HV and LV bushings |
| 294 | IR value improvement |
| 295 | Painting of transformer (outside) with Red oxide primer at Factory/works and final enamel painting at allotted site before commissioning |
| 296 | Transport of repaired unit and accessories from firm's works to the allotted site |
| 297 | Insurance for transit & 90 days storage at site (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 298 | Loading charges at firm's works |
| 299 | Unloading charges of the repaired unit at the allotted site |
| 300 | Re-insulation of coils |
| 301 | HV coil |
| 302 | LV coil |
| 303 | HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 304 | LV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 305 | Core bolt with insulation/Tie band |
| 306 | Insulating materials |
| 307 | HV bushings with metal parts |
| 308 | LV bushings with metal parts |
| 309 | 1000 Amps |
| 310 | 2000 Amps |
| 311 | HV bushing connector |
| 312 | LV bushing connector (Bi-metallic connector complete set) |
| 313 | M20 for single zebra |
| 314 | M30 for single zebra |
| 315 | M40 for single zebra |
| 316 | M50 for single zebra |
| 317 | Core Lamination sheets |
| 318 | Oil Temperature Indicator |
| 319 | Winding Temperature Indicator |
| 320 | Magnetic oil Gauge |
| 321 | Buchholz Relay |
| 322 | Butterfly valve |
| 323 | Neoprene Gasket |
| 324 | New Transformer Oil |
| 325 | Silicagel indicating type breather |
| 326 | OLTC transition resistance |
| 327 | Bushing CTs |
| 328 | HV CT |
| 329 | LV CT |
| 330 | Winding CTs |
| 331 | PRV(Main tank/OLTC) |
| 332 | Surge Relay to match the existing make(BHEL/CTR/OLG/NGEF/TELK) |
| 333 | Cooling Pump |
| 334 | Transformer wheels |
| 335 | Radiators |
| 336 | Contactors |
| 337 | DC Contactors |
| 338 | AC Contactors |
| 339 | Remote/ Local switches |
| 340 | Heater/Thermostat |
| 341 | Heater switch |
| 342 | Step down transformer of 415/110V |
| 343 | Time Delay Relay |
| 344 | Selector switches |
| 345 | Tap position indicators |
| 346 | New RTCC panel |
| 347 | Ladder |
| 348 | OLTC operating handle |
| 349 | Motor rewinding |
| 350 | Single phase preventer |
| 351 | Wheel shaft |
| 352 | Wheel valves 25mm |
| 353 | Wheel valves 40mm |
| 354 | Wheel valves 80mm |
| 355 | LV rod with Nut, washer, cup |
| 356 | HV bushing stem |
| 357 | M-Box door beading |
| 358 | HV Thimble and cotter pin |
| 359 | Door lock and beading |
| 360 | Fuse carrier |
| 361 | Terminal block |
| 362 | Base plate with gland hole |
| 363 | Tap changer raise lower push button |
| 364 | Door lock |
| 365 | Hooter/Buzzer |
| 366 | Annunciator window |
| 367 | 16 window |
| 368 | 20 window |
| 369 | 24 window |
| 370 | Cooling fan blade |
| 371 | MCB Pole (4) |
| 372 | MCB Pole (3) |
| 373 | MCB pole (2) |
| 374 | Cooling fan bearing |
| 375 | Control Cables |
| 376 | 4x2.5 sqmm |
| 377 | 8x2.5 sqmm |
| 378 | 14x2.5 sqmm |
| 379 | 20x2.5 sqmm |
| 380 | 4x4 sqmm |
| 381 | 8x4 sqmm |
| 382 | Cable glands |
| 383 | Oil Flow Indicator |
| 384 | Marshalling box- Door glass |
| 385 | DM -Box Door glass |
| 386 | Door glass beading |
| 387 | Thermostat switch |
| 388 | Cable gland |
| 389 | Neutral MS flat 65x10 mm |
| 390 | Support insulator-33kv/22kV PT insulator |
| 391 | HV connecting clamp terminal suitable for 145kV 800A bushing & (90mm) 3\\" IPS Al busbat with 2 copper flexible wires and bimetallic sheets for flexible end lugs as per IS:5561 |
| 392 | 110kV bushing pin |
| 393 | Retrieving switch |
| 394 | LV terminal brass clamp with SS screw washer, nuts and bimetallic sheets |
| 395 | 36kV 2000A(M40) |
| 396 | 36kV 800A (M30) |
| 397 | 36kV 630A (M20) |
| 398 | LV terminal Aluminium connector with screw washers nuts as per IS 5561 |
| 399 | Single zebra take off Al clamp |
| 400 | Double zebra take off Al clamp |
| 401 | CT terminal board. (Damaged terminal board are to be converted to bushing type) |
| 402 | Link plate per phase |
| 403 | M16 x 120mm brass stud for link board 6 nuts + 4 spring washer |
| 404 | Fasteners MS cadmium plated of various sizes with 2 nos. washers |
| 405 | Disconnecting TB - M4 stud type |
| 406 | Add on block - 2 NO & 2 NC |
| 407 | Selector switch knob |
| 408 | HV bushing Terminal (Timble) Tinned copper |
| 409 | M30 for 245kV bushing |
| 410 | M30 for 145kV bushing |
| 411 | FRP tube |
| 412 | DM box 3ph motor |
| 413 | Resistor assembly in DM box for Remote tap position indicator |
| 414 | LV porcelain bushing 33kV/2000A |
| 415 | Fan guard suitable for 600mm Industrial type cooling fan |
| 416 | Master follower switch |
| 417 | Surge ring |
| 418 | Cooler bank valve cap |
| 419 | Radiator tie band |
| 420 | Neutral link(Omega) |
| 421 | Neutral bushing |
| 422 | OLTC Dova oil seal full set |
| 423 | Dismantling the accessories and drain Oil upto the required level |
| 424 | Charges for transporting transformer along with accessories from the site to the firm's works |
| 425 | Insurance for transit and storage period at firm’s works (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 426 | Loading charges at site |
| 427 | Unloading charges at firm's works |
| 428 | Removal of defective coil after dismantling yoke channel and laminations |
| 429 | Charges for detailed examination of transformer towards identification of defects |
| 430 | Fixing of healthy coil including insulation materials and fixing of lamination & yoke Channel |
| 431 | Bracing, tapping, take off leads of new winding and formation of star connections & fixing frame |
| 432 | Reconditioning of oil |
| 433 | Preliminary drying out of core and winding at hot air chamber |
| 434 | Overhauling of OLTC mechanism & contacts and testing the same |
| 435 | Cleaning of tank, overhauling the radiators including welding charges, conservator, Buchholz Relay test & renewal of gaskets |
| 436 | Core and winding tanking and connecting to tapping leads and fixing metal parts of both HV& LV. |
| 437 | Checking of healthiness of wiring in DM Box, Marshalling box, RTCC panel and Rewiring, if required. (Including replacement of if any damaged/missing indicator lamp, door lamp, holder, selector push button ) |
| 438 | Testing of relay contact at the time Of final inspection |
| 439 | Modification of turrets, wherever Required |
| 440 | Testing of CTs (ratio, knee point voltage Required etc.) at the time of final inspection |
| 441 | Fabrication of pipelines, MS rinf, yoke channel, MS channel |
| 442 | Top cover fixing and assembly of HV and LV bushings |
| 443 | IR value improvement |
| 444 | Painting of transformer (outside) with Red oxide primer at Factory/works and final enamel painting at allotted site before commissioning |
| 445 | Transport of repaired unit and accessories from firm's works to the allotted site |
| 446 | Insurance for transit & 90 days storage at site (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 447 | Loading charges at firm's works |
| 448 | Unloading charges of the repaired unit at the allotted site |
| 449 | Re-insulation of coils |
| 450 | HV coil |
| 451 | LV coil |
| 452 | HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 453 | LV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V) |
| 454 | Core bolt with insulation/Tie band |
| 455 | Insulating materials |
| 456 | HV bushings with metal parts |
| 457 | LV bushings with metal parts |
| 458 | 1000 Amps |
| 459 | 2000 Amps |
| 460 | HV bushing connector |
| 461 | LV bushing connector (Bi-metallic connector complete set) |
| 462 | M20 for single zebra |
| 463 | M30 for single zebra |
| 464 | M40 for single zebra |
| 465 | M50 for single zebra |
| 466 | Core Lamination sheets |
| 467 | Oil Temperature Indicator |
| 468 | Winding Temperature Indicator |
| 469 | Magnetic oil Gauge |
| 470 | Buchholz Relay |
| 471 | Butterfly valve |
| 472 | Neoprene Gasket |
| 473 | New Transformer Oil |
| 474 | Silicagel indicating type breather |
| 475 | OLTC transition resistance |
| 476 | Bushing CTs |
| 477 | HV CT |
| 478 | LV CT |
| 479 | Winding CTs |
| 480 | PRV(Main tank/OLTC) |
| 481 | Surge Relay to match the existing make(BHEL/CTR/OLG/NGEF/TELK) |
| 482 | Cooling Pump |
| 483 | Transformer wheels |
| 484 | Radiators |
| 485 | Contactors |
| 486 | DC Contactors |
| 487 | AC Contactors |
| 488 | Remote/ Local switches |
| 489 | Heater/Thermostat |
| 490 | Heater switch |
| 491 | Step down transformer of 415/110V |
| 492 | Time Delay Relay |
| 493 | Selector switches |
| 494 | Tap position indicators |
| 495 | New RTCC panel |
| 496 | Ladder |
| 497 | OLTC operating handle |
| 498 | Motor rewinding |
| 499 | Single phase preventer |
| 500 | Wheel shaft |
| 501 | Wheel valves 25mm |
| 502 | Wheel valves 40mm |
| 503 | Wheel valves 80mm |
| 504 | LV rod with Nut, washer, cup |
| 505 | HV bushing stem |
| 506 | M-Box door beading |
| 507 | HV Thimble and cotter pin |
| 508 | Door lock and beading |
| 509 | Fuse carrier |
| 510 | Terminal block |
| 511 | Base plate with gland hole |
| 512 | Tap changer raise lower push button |
| 513 | Door lock |
| 514 | Hooter/Buzzer |
| 515 | Annunciator window |
| 516 | 16 window |
| 517 | 20 window |
| 518 | 24 window |
| 519 | Cooling fan blade |
| 520 | MCB Pole (4) |
| 521 | MCB Pole (3) |
| 522 | MCB pole (2) |
| 523 | Cooling fan bearing |
| 524 | Control Cables |
| 525 | 4x2.5 sqmm |
| 526 | 8x2.5 sqmm |
| 527 | 14x2.5 sqmm |
| 528 | 20x2.5 sqmm |
| 529 | 4x4 sqmm |
| 530 | 8x4 sqmm |
| 531 | Cable glands |
| 532 | Oil Flow Indicator |
| 533 | Marshalling box- Door glass |
| 534 | DM -Box Door glass |
| 535 | Door glass beading |
| 536 | Thermostat switch |
| 537 | Cable gland |
| 538 | Neutral MS flat 65x10 mm |
| 539 | Support insulator-33kv/22kV PT insulator |
| 540 | HV connecting clamp terminal suitable for 145kV 800A bushing & (90mm) 3\\" IPS Al busbat with 2 copper flexible wires and bimetallic sheets for flexible end lugs as per IS:5561 |
| 541 | 110kV bushing pin |
| 542 | Retrieving switch |
| 543 | LV terminal brass clamp with SS screw washer, nuts and bimetallic sheets |
| 544 | 36kV 2000A(M40) |
| 545 | 36kV 800A (M30) |
| 546 | 36kV 630A (M20) |
| 547 | LV terminal Aluminium connector with screw washers nuts as per IS 5561 |
| 548 | Single zebra take off Al clamp |
| 549 | Double zebra take off Al clamp |
| 550 | CT terminal board. (Damaged terminal board are to be converted to bushing type) |
| 551 | Link plate per phase |
| 552 | M16 x 120mm brass stud for link board 6 nuts + 4 spring washer |
| 553 | Fasteners MS cadmium plated of various sizes with 2 nos. washers |
| 554 | Disconnecting TB - M4 stud type |
| 555 | Add on block - 2 NO & 2 NC |
| 556 | Selector switch knob |
| 557 | HV bushing Terminal (Timble) Tinned copper |
| 558 | M30 for 245kV bushing |
| 559 | M30 for 145kV bushing |
| 560 | FRP tube |
| 561 | DM box 3ph motor |
| 562 | Resistor assembly in DM box for Remote tap position indicator |
| 563 | LV porcelain bushing 33kV/2000A |
| 564 | Fan guard suitable for 600mm Industrial type cooling fan |
| 565 | Master follower switch |
| 566 | Surge ring |
| 567 | Cooler bank valve cap |
| 568 | Radiator tie band |
| 569 | Neutral link(Omega) |
| 570 | Neutral bushing |
| 571 | OLTC Dova oil seal full set |
| 572 | Dismantling the accessories and drain Oil upto the required level |
| 573 | Charges for transporting transformer along with accessories from the site to the firm's works |
| 574 | Insurance for transit and storage period at firm’s works (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 575 | Loading charges at site |
| 576 | Unloading charges at firm's works |
| 577 | Removal of defective coil after dismantling yoke channel and laminations |
| 578 | Charges for detailed examination of transformer towards identification of defects |
| 579 | Fixing of healthy coil including insulation materials and fixing of lamination & yoke Channel |
| 580 | Bracing, tapping, take off leads of new winding and formation of star connections & fixing frame |
| 581 | Reconditioning of oil |
| 582 | Preliminary drying out of core and winding at hot air chamber |
| 583 | Overhauling of OLTC mechanism & contacts and testing the same |
| 584 | Cleaning of tank, overhauling the radiators including welding charges, conservator, Buchholz Relay test & renewal ofgaskets |
| 585 | Core and winding tanking and connecting to tapping leads and fixing metal parts of both HV& LV. |
| 586 | Checking of healthiness of wiring in DM Box, Marshalling box, RTCC panel and Rewiring, if required. (Including replacement of if any damaged/missing indicator lamp, door lamp, holder, selector push button ) |
| 587 | Testing of relay contact at the time Of final inspection |
| 588 | Modification of turrets, wherever Required |
| 589 | Testing of CTs (ratio, knee point voltage Required etc.) at the time of final inspection |
| 590 | Fabrication of pipelines, MS rinf, yoke channel, MS channel |
| 591 | Top cover fixing and assembly of HV and LV bushings |
| 592 | IR value improvement |
| 593 | Painting of transformer (outside) with Red oxide primer at Factory/works and final enamel painting at allotted site before commissioning |
| 594 | Transport of repaired unit and accessories from firm's works to the allotted site |
| 595 | Insurance for transit & 90 days storage at site (Payment against insurance will be limited to actual insurance bills submitted by the contractor.) |
| 596 | Loading charges at firm's works |
| 597 | Unloading charges of the repaired unit at the allotted site |
| 598 | Re-insulation of coils |
| 599 | HV coil |
| 600 | LV coil Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender