Tender For Shifting Of Electrical Infrastructure For Improvement Of Serango Nuagada Road
Tender Value
22.61 Lakhs
Estimated cost
Bid Submission
30 Sep 2026
7 days left
EMD
22700
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gajapati → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Electrical Infrastructure For Improvement Of Serango Nuagada Road
BOQ
| Sl. No. | Item Description |
| 1 | 9meters long 300kilograms PSC Pole |
| 2 | RCC Base Plate |
| 3 | kilogramsrthing Support (Coil Type) |
| 4 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 5 | 1.1KV LT AB Cable 3x50+1x35+1x16 |
| 6 | LT Stay Set (Complete) |
| 7 | LT Stay Insulator |
| 8 | LT Stay Clamp |
| 9 | 7/12 SWG GI stay wire |
| 10 | Suspension clamp with Eye hook |
| 11 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 12 | EYE hook for XLPE Aerial bunched Cable |
| 13 | Pole clamp for Eye Hook (For AB Cable) |
| 14 | IPC Type-B-main 10 to 95 sq.mm & Tap-1.5 to 10(16) sq.mm |
| 15 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 16 | G.I. Nuts & Bolts |
| 17 | Black Paint |
| 18 | Yellow colour paint for back ground |
| 19 | Sunderies |
| 20 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 21 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 22 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 23 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 24 | Dismantling charges of LT Pole |
| 25 | Dismantling charges of LT Line |
| 26 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 27 | WPB 160x152 (30.44kilograms/meters.),13 meters- with base plate 300x300x12 |
| 28 | 100X50X6 mm, G.I. Channel St Cross arm 1.45meters @ 9.2kilograms/meters (8 Numberss) including top piece |
| 29 | HW Fitting (B&S) 70KN, 3 Bolt |
| 30 | 11KV, 70KN Polymeric Disc Insulator (B&S) |
| 31 | Wedge Connector for 55 Sqmm Conductor |
| 32 | 11KV, 5KN Polymeric Pin Insulator |
| 33 | H.T. Stay set complete |
| 34 | H.T. Stay Insulator |
| 35 | H.T. Stay Clamp (1.9kilograms/pair) |
| 36 | 7/10 SWG G.I. Wire (Grade-2) |
| 37 | kilogramsrthing Support (Coil Type) |
| 38 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 39 | 55mm² AAA Conductor |
| 40 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 41 | Danger Plate |
| 42 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 43 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 44 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 45 | GI Bolts, Nuts & Washers of assorted size |
| 46 | Black Paint |
| 47 | Yellow colour paint for back ground |
| 48 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 49 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 50 | Top Pressure channel (GI) 100x50x6mm 2.8meters long, 2Numberss (9.2kilograms/meters) |
| 51 | AB Switch mounting channel (75x40x6) MM GI, 2.8meters. long, 2Numberss. (6.8kilograms/meters) |
| 52 | AB Switch side support channel 100x50x6mm, 9.2kilograms/meters, kilogramsch chanel length 0.35meters, 2Numberss of chanel required |
| 53 | Channel support for down pipe 75x40x6mm, 6.8kilograms/meters, kilogramsch channel length 0.8meters, 1Numbers |
| 54 | (75x40x6mm chanel (GI) for bracing 2.8meters,2Numberss)(6.8kilograms/meters) |
| 55 | 50x50x6mm angle (GI) for bracing, 3.5meters long, 2Numberss. (4.5kilograms/meters) (total 6meters long) |
| 56 | 11 KV Disc Insulator (B & S) 70 KN Polymer |
| 57 | 11 KV Hard Ware Fitting(B & S Type) 70KN |
| 58 | Wedge Connector for 55mm² AAA Conductor |
| 59 | 11 KV A.B Switch (400A, 3Pole, 50Hz) |
| 60 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 61 | H.T.Stay Set (Complete) |
| 62 | Stay Insulator |
| 63 | Stay Clamp |
| 64 | 7/10 (3.25mm dia per strand) SWG GI stay wire(2.19meters/kilograms) |
| 65 | G.I pipe kilogramsrthing 40 mm dia medium gauge(3.25mm thick ness) 3 meters long |
| 66 | 50x6mm GI Flat for kilogramsrthing |
| 67 | Lightning Arrester (12kV,10kA) (Station Class,Class 2) |
| 68 | kilogramsrthing Support (Coil Type) |
| 69 | Numbers-8 GI wire (Dia 4.6mm) 0.131kilograms/meters - 2meters. For connecting pole with coil kilogramsrthing |
| 70 | Danger Plate |
| 71 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 72 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 73 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 74 | GI Bolts, Nuts & washers |
| 75 | Black Paint |
| 76 | Yellow colour paint for back ground |
| 77 | Sunderies |
| 78 | GI CHANNEL (75x40x4.8) MM (7.14 kilograms./meters) |
| 79 | Numbers-8 GI wire (0.192 kilograms/meters.)-Main String |
| 80 | Numbers-10 GI wire (0.08 kilograms/meters.)-lacing |
| 81 | Eye Bolt (236mm, 16mm dia, 1.577kilograms/meters.) |
| 82 | Gi Pipe kilogramsrthing 40mm. 3 meters. Long |
| 83 | 50x6mm GI Flat for kilogramsrthing, 2.36kilograms/m |
| 84 | GI Nut ,Bolt & Washer of different sizes |
| 85 | SUNDRIES (BIND WIRE,TREE TRIM ETC) |
| 86 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 87 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 88 | Concreting of 13M WPB Poles in ratio 1:1.5:3 =0.550Cum. @ 6648.85 =0.550 x 6648.85 =Rs.3656.87 |
| 89 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 90 | Material for kilogramsrthing including masonary work for kilogramsrth pit, and cement plate cover with salt, charcoal etc. |
| 91 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 92 | Dismantling charges of HT Pole |
| 93 | Dismantling charges of existing Line-HT (Conductor) |
| 94 | Dismantling/Removal from Double Pole |
| 95 | Dismantl of GO/AB Switch/istr (11 /33KV) |
| 96 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 97 | 9 meters long 300kilograms PSC Pole |
| 98 | RCC Base plate |
| 99 | HT Cross Arm V Shape for 11KV (GI) - 10.5kilograms |
| 100 | 11KV F Clamp (GI) |
| 101 | 11KV Back Clamp for V Cross Arm (GI) |
| 102 | 100X50X6 mm, G.I. Channel St Cross arm 1.45meters @ 9.2kilograms/meters (4Numberss) including top piece |
| 103 | HW Fitting (B&S) 70KN, 3 Bolt |
| 104 | 11KV, 70KN Polymeric Disc Insulator (B&S) |
| 105 | Wedge Connector for 55 Sqmm Conductor |
| 106 | 11KV, 5KN Polymeric Pin Insulator |
| 107 | H.T. Stay set complete |
| 108 | H.T. Stay Insulator |
| 109 | H.T. Stay Clamp (1.9kilograms/pair) |
| 110 | 7/10 SWG G.I. Wire (Grade-2) |
| 111 | kilogramsrthing Support (Coil Type) |
| 112 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 113 | 55mm² AAA Conductor |
| 114 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 115 | Danger Plate |
| 116 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 117 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 118 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 119 | GI Bolts, Nuts & Washers of assorted size |
| 120 | Black Paint |
| 121 | Yellow colour paint for back ground |
| 122 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 123 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 124 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 125 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 126 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 127 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 128 | Dismantling charges of HT Pole |
| 129 | Dismantling charges of existing Line-HT (Conductor) |
| 130 | Dismantling /Removal from single pole |
| 131 | 8meters long 200kilograms PSC Pole |
| 132 | 9meters long 300kilograms PSC Pole |
| 133 | 11meters WPB Pole (30.44kilograms/meters) GI with Base Plate |
| 134 | RCC Base Plate |
| 135 | kilogramsrthing Support (Coil Type) |
| 136 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 137 | 1.1KV LT AB Cable 2X35+1x25 |
| 138 | LT Stay Set (Complete) |
| 139 | LT Stay Insulator |
| 140 | LT Stay Clamp |
| 141 | 7/12 SWG GI stay wire |
| 142 | Suspension clamp with Eye hook |
| 143 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 144 | EYE hook for XLPE Aerial bunched Cable |
| 145 | Pole clamp for Eye Hook (For AB Cable) |
| 146 | IPC Type-B-main 10 to 95 sq.mm & Tap-1.5 to 10(16) sq.mm |
| 147 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 148 | G.I. Nuts & Bolts |
| 149 | Black Paint |
| 150 | Yellow colour paint for back ground |
| 151 | Sunderies |
| 152 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 153 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 154 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 155 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 156 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 157 | Dismantling charges of LT Pole |
| 158 | Dismantling charges of LT Line |
| 159 | WPB 160x152 (30.44kilograms/meters.),13 meters- with base plate 300x300x12 |
| 160 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 161 | 10 meters long 330kilograms PSC Pole |
| 162 | 9 meters long 300kilograms PSC Pole |
| 163 | RCC Base plate |
| 164 | HT Cross Arm V Shape for 11KV (GI) - 10.5kilograms |
| 165 | 11KV F Clamp (GI) |
| 166 | 11KV Back Clamp for V Cross Arm (GI) |
| 167 | 100X50X6 mm, G.I. Channel St Cross arm 1.45meters @ 9.2kilograms/meters (8Numberss) including top piece |
| 168 | HW Fitting (B&S) 70KN, 3 Bolt |
| 169 | 11KV, 70KN Polymeric Disc Insulator (B&S) |
| 170 | Wedge Connector for 55 Sqmm Conductor |
| 171 | 11KV, 5KN Polymeric Pin Insulator |
| 172 | H.T. Stay set complete |
| 173 | H.T. Stay Insulator |
| 174 | H.T. Stay Clamp (1.9kilograms/pair) |
| 175 | 7/10 SWG G.I. Wire (Grade-2) |
| 176 | kilogramsrthing Support (Coil Type) |
| 177 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 178 | 55mm² AAA Conductor |
| 179 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 180 | Danger Plate |
| 181 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 182 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 183 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 184 | GI Bolts, Nuts & Washers of assorted size |
| 185 | Black Paint |
| 186 | Yellow colour paint for back ground |
| 187 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 188 | GI CHANNEL (75x40x4.8) MM (7.14 kilograms./meters) |
| 189 | Numbers-8 GI wire (0.192 kilograms/meters.)-Main String |
| 190 | Numbers-10 GI wire (0.08 kilograms/meters.)-lacing |
| 191 | Eye Bolt (236mm, 16mm dia, 1.577kilograms/meters.) |
| 192 | Gi Pipe kilogramsrthing 40mm. 3 meters. Long |
| 193 | 50x6mm GI Flat for kilogramsrthing, 2.36kilograms/m |
| 194 | GI Nut ,Bolt & Washer of different sizes |
| 195 | SUNDRIES(BIND WIRE,TREE TRIM ETC) |
| 196 | 8meters long 200kilograms PSC Pole |
| 197 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 198 | RCC Base Plate |
| 199 | kilogramsrthing Support (Coil Type) |
| 200 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 201 | 1.1KV LT AB Cable 2X35+1x25 |
| 202 | LT Stay Set (Complete) |
| 203 | LT Stay Insulator |
| 204 | LT Stay Clamp |
| 205 | 7/12 SWG GI stay wire |
| 206 | Suspension clamp with Eye hook |
| 207 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 208 | EYE hook for XLPE Aerial bunched Cable |
| 209 | Pole clamp for Eye Hook (For AB Cable) |
| 210 | IPC Type-B-main 10 to 95 sq.mm & Tap-1.5 to 10(16) sq.mm |
| 211 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 212 | G.I. Nuts & Bolts |
| 213 | Black Paint |
| 214 | Yellow colour paint for back ground |
| 215 | Sunderies |
| 216 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 217 | Concreting of 13M WPB Poles in ratio 1:1.5:3 =0.550Cum. @ 6648.85 =0.550 x 6648.85 =Rs.3656.87 |
| 218 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 219 | Concreting of 10meters PSC Poles in ratio 1:1.5:3 =0.415Cum. @ 6648.85 =0.415 x 6648.85 |
| 220 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 221 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x 6648.85 =Rs.748.00 |
| 222 | Material for kilogramsrthing including masonary work for kilogramsrth pit, and cement plate cover with salt, charcoal etc. |
| 223 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 224 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 225 | Dismantling charges of HT Pole |
| 226 | Dismantling charges of existing Line-HT (Conductor) |
| 227 | Dismantling /Removal from single pole |
| 228 | Dismantling charges of LT Pole |
| 229 | Dismantling charges of LT Line |
| 230 | WPB 160x152 (30.44kilograms/meters.),13 meters- with base plate 300x300x12 |
| 231 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 232 | 10 meters long 330kilograms PSC Pole |
| 233 | RCC Base plate |
| 234 | HT Cross Arm V Shape for 11KV (GI) - 10.5kilograms |
| 235 | 11KV F Clamp (GI) |
| 236 | 11KV Back Clamp for V Cross Arm (GI) |
| 237 | 100X50X6 mm, G.I. Channel St Cross arm 1.45meters @ 9.2kilograms/meters (2Numberss) including top piece |
| 238 | HW Fitting (B&S) 70KN, 3 Bolt |
| 239 | 11KV, 70KN Polymeric Disc Insulator (B&S) |
| 240 | Wedge Connector for 55 Sqmm Conductor |
| 241 | 11KV, 5KN Polymeric Pin Insulator |
| 242 | H.T. Stay set complete |
| 243 | H.T. Stay Insulator |
| 244 | H.T. Stay Clamp (1.9kilograms/pair) |
| 245 | 7/10 SWG G.I. Wire (Grade-2) |
| 246 | kilogramsrthing Support (Coil Type) |
| 247 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 248 | 55mm² AAA Conductor |
| 249 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 250 | Danger Plate |
| 251 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 252 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 253 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 254 | GI Bolts, Nuts & Washers of assorted size |
| 255 | Black Paint |
| 256 | Yellow colour paint for back ground |
| 257 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 258 | GI CHANNEL (75x40x4.8) MM (7.14 kilograms./meters) |
| 259 | Numbers-8 GI wire (0.192 kilograms/meters.)-Main String |
| 260 | Numbers-10 GI wire (0.08 kilograms/meters.)-lacing |
| 261 | Eye Bolt (236mm, 16mm dia, 1.577kilograms/meters.) |
| 262 | Gi Pipe kilogramsrthing 40mm. 3 meters. Long |
| 263 | 50x6mm GI Flat for kilogramsrthing, 2.36kilograms/m |
| 264 | GI Nut ,Bolt & Washer of different sizes |
| 265 | SUNDRIES(BIND WIRE,TREE TRIM ETC) |
| 266 | 8meters long 200kilograms PSC Pole |
| 267 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 268 | RCC Base Plate |
| 269 | kilogramsrthing Support (Coil Type) |
| 270 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 271 | 1.1KV LT AB Cable 4x35+1x35+1x16 |
| 272 | CAP CABLE END FOR ABC 35 SQMM |
| 273 | LT Stay Set (Complete) |
| 274 | LT Stay Insulator |
| 275 | LT Stay Clamp |
| 276 | 7/12 SWG GI stay wire |
| 277 | Suspension clamp with Eye hook |
| 278 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 279 | EYE hook for XLPE Aerial bunched Cable |
| 280 | Pole clamp for Eye Hook (For AB Cable) |
| 281 | IPC Type-B-main 10 to 95 sq.mm & Tap-1.5 to 10(16) sq.mm |
| 282 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 283 | G.I. Nuts & Bolts |
| 284 | Black Paint |
| 285 | Yellow colour paint for back ground |
| 286 | Sunderies |
| 287 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 288 | Concreting of 13M WPB Poles in ratio 1:1.5:3 =0.550Cum. @ 6648.85 =0.550 x 6648.85 =Rs.3656.87 |
| 289 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 290 | Concreting of 10meters PSC Poles in ratio 1:1.5:3 =0.415Cum. @ 6648.85 =0.415 x 6648.85 |
| 291 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 292 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 293 | Material for kilogramsrthing including masonary work for kilogramsrth pit, and cement plate cover with salt, charcoal etc. |
| 294 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 295 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 296 | Dismantling charges of HT Pole |
| 297 | Dismantling charges of existing Line-HT (Conductor) |
| 298 | Dismantling /Removal from single pole |
| 299 | Dismantling charges of LT Pole |
| 300 | Dismantling charges of LT Line |
| 301 | 9meters long 300kilograms PSC Pole |
| 302 | 11meters WPB Pole (30.44kilograms/meters) GI with Base Plate |
| 303 | RCC Base Plate |
| 304 | kilogramsrthing Support (Coil Type) |
| 305 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 306 | 1.1KV LT AB Cable 2X35+1x25 |
| 307 | CAP CABLE END FOR ABC 35 SQMM |
| 308 | LT Stay Set (Complete) |
| 309 | LT Stay Insulator |
| 310 | LT Stay Clamp |
| 311 | 7/12 SWG GI stay wire |
| 312 | Suspension clamp with Eye hook |
| 313 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 314 | EYE hook for XLPE Aerial bunched Cable |
| 315 | Pole clamp for Eye Hook (For AB Cable) |
| 316 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 317 | G.I. Nuts & Bolts |
| 318 | Black Paint |
| 319 | Yellow colour paint for back ground |
| 320 | Sunderies |
| 321 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 322 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 323 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 324 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 325 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 326 | Dismantling charges of LT Pole |
| 327 | Dismantling charges of LT Line |
| 328 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 329 | 10 meters long 330kilograms PSC Pole |
| 330 | RCC Base plate |
| 331 | HT Cross Arm V Shape for 11KV (GI) - 10.5kilograms |
| 332 | 11KV Back Clamp for V Cross Arm (GI) |
| 333 | 100X50X6 mm, G.I. Channel St Cross arm 1.2meters @ 9.2kilograms/meters (2Numberss) including top piece |
| 334 | HW Fitting (B&S) 70KN, 3 Bolt |
| 335 | 11KV, 70KN Polymeric Disc Insulator (B&S) |
| 336 | Wedge Connector for 55 Sqmm Conductor |
| 337 | 11KV, 5KN Polymeric Pin Insulator |
| 338 | H.T. Stay set complete |
| 339 | H.T. Stay Insulator |
| 340 | H.T. Stay Clamp (1.9kilograms/pair) |
| 341 | 7/10 SWG G.I. Wire (Grade-2) |
| 342 | kilogramsrthing Support (Coil Type) |
| 343 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 344 | 55mm² AAA Conductor |
| 345 | Fish Plate 50x6mm, 2.36kilograms/meters, kilogramsch 0.280meters Length |
| 346 | Danger Plate |
| 347 | Back clamp for danger plate 25x3mm flat, 0.59kilograms/meters flat of 0.510meters 1Numbers |
| 348 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 349 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59kilograms/meters flat of 0.510 meters length 4Numberss/pole |
| 350 | GI Bolts, Nuts & Washers of assorted size |
| 351 | Black Paint |
| 352 | Yellow colour paint for back ground |
| 353 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 354 | GI CHANNEL (75x40x4.8) MM (7.14 kilograms./meters) |
| 355 | Numbers-8 GI wire (0.192 kilograms/meters.)-Main String |
| 356 | Numbers-10 GI wire (0.08 kilograms/meters.)-lacing |
| 357 | Eye Bolt (236mm, 16mm dia, 1.577kilograms/meters.) |
| 358 | Gi Pipe kilogramsrthing 40mm. 3 meters. Long |
| 359 | 50x6mm GI Flat for kilogramsrthing, 2.36kilograms/m |
| 360 | GI Nut ,Bolt & Washer of different sizes |
| 361 | SUNDRIES(BIND WIRE,TREE TRIM ETC) |
| 362 | 8meters long 200kilograms PSC Pole |
| 363 | WPB 160x152 (30.44kilograms/meters.),11 meters- with base plate 300x300x12 |
| 364 | RCC Base Plate |
| 365 | kilogramsrthing Support (Coil Type) |
| 366 | Numbers8 GI wire(dia-4.6mm) 0.131kilograms/meters, 2meters for connecting pole with coil kilogramsrthing |
| 367 | 1.1KV LT AB Cable 2X35+1x25 |
| 368 | CAP CABLE END FOR ABC 35 SQMM |
| 369 | LT Stay Set (Complete) |
| 370 | LT Stay Insulator |
| 371 | LT Stay Clamp |
| 372 | 7/12 SWG GI stay wire |
| 373 | Suspension clamp with Eye hook |
| 374 | Dkilogramsd End Clamp with eye hook suitable for XLPE Cable |
| 375 | EYE hook for XLPE Aerial bunched Cable |
| 376 | Pole clamp for Eye Hook (For AB Cable) |
| 377 | IPC Type-B-main 25 to 150 sq.mm & Tap-25 to 150 sq.mm |
| 378 | G.I. Nuts & Bolts |
| 379 | Black Paint |
| 380 | Yellow colour paint for back ground |
| 381 | Sunderies |
| 382 | Stay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500.00=0.2X6500.00 =Rs.1300.00 |
| 383 | Concreting of 11M WPB Poles in ratio 1:1.5:3 =0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 384 | Concreting of 10meters PSC Poles in ratio 1:1.5:3 =0.415Cum. @ 6648.85 =0.415 x 6648.85 |
| 385 | Concreting of 9meters/8meters PSC Poles in ratio 1:1.5:3 =0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 386 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x 6648.85 =Rs.748.00 |
| 387 | Material for kilogramsrthing including masonary work for kilogramsrth pit, and cement plate cover with salt, charcoal etc. |
| 388 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 389 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 390 | Dismantling charges of HT Pole |
| 391 | Dismantling /Removal from single pole |
| 392 | Dismantling charges of LT Pole |
| 393 | Dismantling charges of LT Line Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysOct 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender