Tender For Estimate Of Quantum Of Works For Construction Of New 11 Kv Underground/Overhead Line For Releasing Connection To Jal Jivan Mission Under Full Deposit Scheme In The Area Of Under The Edd-Purwa, Unnao.
Tender Value
29.29 Lakhs
Estimated cost
Bid Submission
05 Oct 2026
4 days left
EMD
29290
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Unnao → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Estimate Of Quantum Of Works For Construction Of New 11 Kv Underground/Overhead Line For Releasing Connection To Jal Jivan Mission Under Full Deposit Scheme In The Area Of Under The Edd-Purwa, Unnao.
BOQ
| Sl. No. | Item Description |
| 1 | Safe Loading Carriage & Unloading of following materials from Electricity store center Unnao to pit site/JE dump store approx Distance 0-70 Km. |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | PCC Pole 11 mtr. Long |
| 4 | 11 KV XLPE Cable 3x70/120/185 sqmm |
| 5 | 11 KV XLPE Cable Jointing Kit 3x70/120/185 sqmm I/D &O/D |
| 6 | ACSR Weasel/DOG Conductor |
| 7 | 11 KV Metering Cubicle pilfer Unit different size |
| 8 | 11 KV O/D Type CT/PT Unit |
| 9 | Distribution Transformer 11/0.4 KV 63 KVA |
| 10 | Top Channel MS 100x50x2240 mm |
| 11 | Dropper Channel MS 100x50x2240 mm |
| 12 | T-Off Channel |
| 13 | M.S. Angle 65x65x6 mm |
| 14 | Stay Rod |
| 15 | Earthing Rod |
| 16 | GI wire 08 swg |
| 17 | Stay wire 7/10 swg |
| 18 | Guarding Angle 1.8 mtr. |
| 19 | X-arm M.S. Angle 65x65x6mm V type |
| 20 | 11 KV Polymeric Disc Insulator 45 KN |
| 21 | 11 KV Disc Fitting |
| 22 | 11 KV Polymeric Pin Insulator |
| 23 | Erection & Stringing and Sagging of 11 KV line by condouctor/Cable. |
| 24 | Erection of PCC/ STP Pole including digging of pits, fitting of all accessories with its cartage dump site as per RESPO norms. |
| 25 | Erection of PCC/ STP Double Pole Structure including digging of pit and fitting of all accessories complete. |
| 26 | Making of HT/LT Section Points By Brackets/And Making of T-off arrangement for Including fabrication and fitting of all accessories Complete. |
| 27 | Fabrication/ Modifications of MS Items, Nuts & Bolts as per requirement of site conditions. |
| 28 | Placement of 11/0.433 KV Distribution Transformer newly constructed Transformer on Double Pole Installation of commissioning of 63 KVA Transformer including Lug, Jumpring and Conection Earthing of body & neutral with proper fitting Lug, Nut and Bolt as per required. |
| 29 | Boring type Earthing with 20 mtr deep or up to water level providing GI pipe 1.5\\" dia (B\\" Class) and earthing must be joint in T/F Body, netural & Fuse unit by GI Stripe of size 32x5 mm thick long attached with nut & bolts and GI pipe cap ( All the material will be arranged by the contractor at his own cost.) |
| 30 | Grouting of PCC/STP pole as per RESPO norms with grouting materials. |
| 31 | Earthing of PCC/ST Pole as per RESPO norms. |
| 32 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO norms with grouting of materials. |
| 33 | Laying of 11 KV XLPE Cable Double Ckt. 3x70/3x120/3x185 sqmm by mannual method in 1.3 mtr deep.( All material including Stone, Sand & Brick shall be provided by the contractor. Only XLPE Cable will be provided by the department.) |
| 34 | Fixing cable box for 11 KV 3X70/3x120/3x185 sq mm cable jointing Kit indoor and outdoor both |
| 35 | Cable Hosting at Double Pole with GI Pipe dia 4/6\\" jumpring of cable proper Mounting of cable box outdoor 3x70/3x120/3x185 sq mm clamping lugs etc. |
| 36 | Laying Stringing & sagging of HT line by ACSR Weasel Conductor including all related work as joints /jumpers and binding on Insulators as required. |
| 37 | Guarding of 11 KV line with Guarding Angle and Clamps (All necessary decentralized material like clamp, nut & bolts etc will be provided by the contractor at his own cost) |
| 38 | Installation testing and commissining New 11 KV Pilfer proof metering cubical in Metering Room and CT/PT unit on pole and Cable terimanison, connecting to supply and earthing. |
| 39 | Supply and Erection of Following Materials by Contractor |
| 40 | Holding clamps for PCC/STP pole |
| 41 | Holding clamps for G.I. Pipe. |
| 42 | Stay Clamps for PCC/STP pole. |
| 43 | 11 KV Stay Loop Insulator |
| 44 | Nut Bolt of diff. size |
| 45 | 11 KV F-Clamp/F bracket for PCC/ST Pole |
| 46 | G.I. Pipe 4/6” dia Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysOct 06, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender