Tender For Handling Of Chemicals, Lime, General Cleaning, Housekeeping At Boiling House & Ethanol Plant At Hbls 3500 Tcd Integrated Sugar Plant, Sugauli, Under Dist. - East Ch Aran, Bihar.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Oct 2026
4 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pashchim Champaran → Bihar
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Handling Of Chemicals, Lime, General Cleaning, Housekeeping At Boiling House & Ethanol Plant At Hbls 3500 Tcd Integrated Sugar Plant, Sugauli, Under Dist. - East Ch Aran, Bihar.
BOQ
| Sl. No. | Item Description |
| 1 | PART - A : Sugauli - Handling of Chemicals, Lime, General Cleaning in boiling house section as per attached tender document: |
| 2 | Cleaning, sweeping, boiling house floor, collecting the spill over syrup, Sugar etc., cleaning gutters/ drainage, parapet walls, cleaning of equipment’s in Boiling house, spreading bleaching powder, any other miscellaneous jobs, as required in 3 shifts during season including labour, supervision, tools & tackles etc. as directed by Officer in charge. |
| 3 | Handling and shifting of lime bags from ware house to lime station by the means of hand push trolley (provided by HBL), mixing, and preparation of milk of lime in 3 shifts during season including labour, supervision, tools & tackles etc. as directed. |
| 4 | Handling and shifting of Sulphur bags from ware house to sulphur burner by the means of hand push trolley (provided by HBL) in 3 shifts during season including labour, supervision, tools & tackles etc. as directed. |
| 5 | Shifting chemicals for ETP operations from designated place to ETP with hand push trolly or tractor trolley. Handling and dosing/ mixing chemicals, culture, sampling, assisting in testing etc. in 3 shifts during season including labour, supervision, tools & tackles etc. as directed. |
| 6 | Scrapping all Boiling house equipments and vessels, collecting and filling of scrap sugar in bags, handling , shifting & stacking of scrap sugar bags through hand push trolley to sugar godown or any other nearable place inside the plant directed by HBL Boiling house Incharge . Washing and cleaning of Boiling house equipments and vessels inside and outside, like Juice heaters, Juice sulphiters, syrup sulphiters, DCH, clarifiers, vacuum filters, sulphur furnace, MOL preparation units, Evaporator station, all Pumps and their surrounding areas, vacuum pans, molasses supply tanks, crystallizers, run off tanks, centrifugal machines, Pug mills, Magma Mixture, Sugar Melter, Hopper, Sugar Elevators, Grader, Sugar bin ,Drier house area, Spray pound, Surround wall of boiling house, Top & side sheets of boiling house etc. including platforms of each station. complete washing and cleaning of Boiling house and its floor after end of season and making ready for further off season maintenance and preservation. This exclude tube cleaning job. This has to be completed within two weeks from the date of end of crushing season. Penalty @ 1% week delay maximum up to 5% will be applicable on this item. |
| 7 | Unloading of process chemicals like lime, sulphuric acid, lubricants, antifoam etc. from outside trucks/trolleys and stacking at Store or any other designated place as directed by HBL. In case of loading, same rate shall be applicable. In case of both loading and unloading both, measurement will be double the quantity. |
| 8 | Handling, collecting and filling of rori sugar in 50 sugar bags & reprocessing in magma mixture, Melter, hopper as directed by HBL's officers -in-charge. The operations shall be in shifts as directed by HBL. The contractor shall quote rate per bag basis. |
| 9 | Cleaning of Magma mixer /Pugmill during any shutdown |
| 10 | Cleaning of Crystallizer jamming during any Shutdown |
| 11 | PART - B : Sugauli - Handling of Process Chemicals, General Cleaning, Housekeeping at Ethanol Plant as per attached tender document: |
| 12 | Handling, shifting of Chemical bags and drums like Urea, DAP, SMBS, Common salt, Sulphuric acids, any acids, antifoam etc. from respective ware houses to bio-digestor, evaporation unit, clarification unit, fermentation unit, spent wash section/ evaporator, CPU, WTP and distillation etc. complete by means of hand push trolley or tractor trolley (provided by HBL), adding/ dosing/ mixing required quantity as directed. |
| 13 | Cleaning, sweeping, floor, collecting the spill over molasses, syrup, chemicals etc., clearing gutters/ drainage, parapet walls, cleaning of equipments in Ethanol plant house, spreading blitching powder, any other miscellaneous jobs, as required in 3 shifts during season including labour, supervision, tools & tackles etc. as directed by Officer in charge. |
| 14 | PART - C : Lauriya - Handling of Chemicals, Lime, General Cleaning, Housekeeping at Boiling House & Ethanol Plant as per attached tender document: |
| 15 | Cleaning, Sweeping of Boiling House Floor, collecting the spill over syrup, sugar from sulphiter pit, cleaning of all pump pit like AH, BH, CL etc. Cleaning of all magma mixture pits, Cleaning of all Pan gutter/ drainage, parapet walls , cleaning of equipment in boiling house. spreading bleaching power. any other miscellaneous jobs as required in 3 shift during season including labour, supervision, tools & tackles etc. as directed by officer in charge. |
| 16 | Handling and shifting of lime bags from warehouse to lime station by the means of hand push trolley (provided by HBL) , mixing and preparation of Milk of lime in three shift. Cleaning of pump pits, shifting of grit as per direction of HBL officer by your own truck / trolly on daily basis. Keeping lime station clean and both lime godown also be cleaned during season. |
| 17 | Handling and shifting of sulphur bags from warehouse to sulphur burner by the means of hand push trolley (provided by HBL) in three shift during season. Including labour, supervision , tools & tackles etc. as directed by HBL officers. |
| 18 | Shifting chemicals for ETP operations from designated place to ETP with hand push trolly or tractor trolley. Handling and dosing /mixing chemicals, culture, sampling, assisting in testing etc. in 3 shift during season including labour, supervision, tool & tackles etc. as directed by HBL officers. |
| 19 | Handling and filling of rori sugar in 50kg sugar bags and handling of brown sugar/ scrap sugar bags melting, work including shifting of brown sugar from kisan Bhawan to magma mixture & melting as per direction of HBL officers. Melting of moist sugar bags received from sugar godown . The operations shall be in shifts as directed by HBL . The contractor shall quote rate per bag basis. |
| 20 | Scrapping all boiling house equipments and vessels, collecting and filling of scrap sugar in Bags. Handling , shifting and stacking of scrap sugar bags through hand push trolley to sugar godown or any other nearable place inside the plant directed by HBL Boiling House In charge . Washing and cleaning of Boiling House equipments and vessels inside and outside like Screen Juice tank, Juice Heaters, Both Sulphiter , All Evaporator Bodies, Clarifier, Vacuum Filter, Milk of Lime station , Sulphur Furnace , DCH, All Pumps , All Pans , Crystallisers, Molasses tanks, Centrifugal machines, Pug mill, Magma Mixture, Hopper, Sugar Grader, Elevator, Sugar Bin , All floor, Walls, And ground floor, Platform , Boiling house top roof etc. Complete washing and cleaning of Boiling House and its floor after end of season and making ready for further off season maintenance and preservation . This exclude tube cleaning jobs. This has to be completed within two weeks from the date of crushing season. Penalty @1 % week delay Maximum up to 5% will be applicable on this item |
| 21 | Handling and shifting of chemicals bags and drums like Urea, DAP , SMBS, Common Salt, sulphuric acids any acids, antifoam etc. from respective warehouse to bio-digestor, evaporation unit, clarification unit, fermentation unit, spent wash section / evaporator, CPU, WTP and distillation etc. Complete by means of hand push trolley or tractor trolley (provided by HBL) , adding / dosing/ mixing required quantity as direction. |
| 22 | Cleaning , sweeping , floor, collecting the spill over molasses, syrup, chemicals etc. Cleaning of gutters, drainage , parapet walls. Cleaning of equipments in Ethanol plant house. Spreading bleaching power , any other miscellaneous jobs, as required in 3 shifts during season including labour, supervision , tools & tackles etc. as directed by office in charge |
| 23 | Unloading of process chemicals like lime , sulphuric acid, lubricants, antifoam etc. from truck / trolleys and stacking at store or any other designated place as directed by HBL . In case of loading and unloading both , measurement will be double the quantity. |
| 24 | Cleaning of magma mixture/ pug mill during any shutdown |
| 25 | Cleaning of crystallizer Jamming during any shutdown Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender