Tender For New Installation Of Belt Conveyors At R3/2 Seam For Starting Of S1a Panel Of Departmental Cm Under Khottadih Colliery, Pandaveshwar Area.
Tender Value
1.81 Crore
Estimated cost
Bid Submission
06 Oct 2026
14 days left
EMD
2.26 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Paschim Bardhaman → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Installation Of Belt Conveyors At R3/2 Seam For Starting Of S1a Panel Of Departmental Cm Under Khottadih Colliery, Pandaveshwar Area.
BOQ
| Sl. No. | Item Description |
| 1 | New installation of 1000 mm width 1x150KW Drive 175 mtr length B04 belt conveyor for departmental CM . (Inclusive of EPF/CMPF) |
| 2 | Dismantling, Loading Unloading carrying and transportation of discharge unit with required M.S. joist From Surface to mentioned belt conveyor |
| 3 | Loading Unloading, carrying and transportation of heavy duty drive head From Surface to mentioned belt conveyor |
| 4 | Loading Unloading carrying and transportation of Tail end assy along with V-scrapper tail end guard decking plate from Surface to mentioned belt conveyor |
| 5 | Loading Unloading carrying and transportation and fitting of 150 mtrs structure From Surface to mentioned belt conveyor - 110 kg/mtr |
| 6 | Loading Unloading carrying and transportation of pvc belting from surface to belt, install at site then laying and lapping of belt |
| 7 | Loading Unloading carrying transportation of Load table from Surface to mentioned belt conveyor |
| 8 | Fencing of drive head, tail end etc. including coat of DA and Oxygen and welding electrodes |
| 9 | Fabrication & fitting of vertical support for structure hanging portion from discharge to loop take up including coast of DA and 02 nos oxygen cylinder |
| 10 | Fabrication of load table at surface workshop including coat of DA, Oxygen and welding electrode |
| 11 | Loading, unloading transportation of control cable and accessories laying and fitting |
| 12 | Transportation & placing electrical ACB, starter, cable (power & control) from surface to drive head |
| 13 | Tail end shifting |
| 14 | Holding bolts for drive head |
| 15 | Consumables MS nut and bolt 5/8\\"x2\\"-530kg |
| 16 | New installation of B05 conveyor belt 1000 mm width of 550mtr length 2x110KW Drive at RII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 17 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 18 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 19 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 20 | Loading, unloading, carrying, transportation of 350 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 21 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 22 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 23 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 24 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 25 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 26 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 27 | Fabrication of one tail end assembly using RS joist |
| 28 | Loading, unloading transportation of control cable & assy laying and fitting |
| 29 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 30 | Holding down bolt for drive head |
| 31 | New installation of B06 conveyor belt 1000 mm 2x110KW, width of length 660mtr meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 32 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 33 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 34 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 35 | Loading, unloading, carrying, transportation of 660 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 36 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 37 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 38 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 39 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 40 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 41 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 42 | Fabrication of one tail end assembly using RS joist |
| 43 | Loading, unloading transportation of control cable & assy laying and fitting |
| 44 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 45 | Tail End shifting |
| 46 | Holding down bolt for drive head |
| 47 | New installation of B07 conveyor belt 1000 mm, 1x90KW, width of length 130 meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 48 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 49 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 50 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 51 | Loading, unloading, carrying, transportation of 130 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 52 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 53 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 54 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 55 | Fencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 56 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 57 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 58 | Fabrication of one tail end assembly using RS joist |
| 59 | Loading, unloading transportation of control cable & assy laying and fitting |
| 60 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 61 | Holding down bolt for drive head |
| 62 | New installation of B08 conveyor belt 2x90 KW, 1000 mm width of length 250 meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 63 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 64 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 65 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 66 | Loading, unloading, carrying, transportation of 250 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 67 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 68 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 69 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 70 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 71 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 72 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 73 | Fabrication of one tail end assembly using RS joist |
| 74 | Loading, unloading transportation of control cable & assy laying and fitting |
| 75 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 76 | Tail End shifting |
| 77 | Holding down bolt for drive head |
| 78 | New installation of B09 conveyor belt 2x90KW, 1000 mm width of length 500 meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 79 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 80 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 81 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 82 | Loading, unloading, carrying, transportation of 500 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 83 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 84 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 85 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 86 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 87 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 88 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 89 | Fabrication of one tail end assembly using RS joist |
| 90 | Loading, unloading transportation of control cable & assy laying and fitting |
| 91 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 92 | Tail End shifting |
| 93 | Holding down bolt for drive head |
| 94 | New installation of B10 conveyor belt 2x90 KW, 1000 mm width of length 250 meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 95 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 96 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 97 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 98 | Loading, unloading, carrying, transportation of 750 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 99 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 100 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 101 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 102 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 103 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 104 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 105 | Fabrication of one tail end assembly using RS joist |
| 106 | Loading, unloading transportation of control cable & assy laying and fitting |
| 107 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 108 | Tail End shifting |
| 109 | Holding down bolt for drive head |
| 110 | New installation of B11 conveyor belt 1x90, 1000 mm width of length 100 meter at RIII/II seam of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 111 | Loading, unloading, carrying, transportation of discharge unit with required girders from surface to mentioned belt conveyor -3MT |
| 112 | Loading, unloading, carrying, transportation of heavy duty drive head from surface to mentioned belt conveyor -10.5MT |
| 113 | Loading, unloading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from surface to mentioned belt conveyor -1MT |
| 114 | Loading, unloading, carrying, transportation of 100 mtr structure at mentioned belt conveyor -@ 110 kg per mtr |
| 115 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt |
| 116 | Loading, unloading, carrying, transportation of loop take up from surface to mentioned belt conveyor -4.75MT |
| 117 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT |
| 118 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes |
| 119 | Fabrication and fitting of vertical support for structure hanging portion from discharge to loop take up including cost of DA and oxygen -2 nos |
| 120 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. |
| 121 | Fabrication of one tail end assembly using RS joist |
| 122 | Loading, unloading transportation of control cable & assy laying and fitting |
| 123 | Transportation and placing electrical ACB, starter, cable (power and control) from surface to drive head - 1 set |
| 124 | Holding down bolt for drive head |
| 125 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysOct 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer