Tender For Repairing Of Abc Make 200 S, 550V, Flp Acb Switch & A/Y Make 20 S, 550V, Flp Acb Switch & Mineline Make 200 S, 550V, Dol Starter Of Dhemomain Incline Colliery Under Sodepur Area.
Tender Value
2.42 Lakhs
Estimated cost
Bid Submission
30 Sep 2026
8 days left
EMD
3100
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Paschim Bardhaman → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repairing Of Abc Make 200 S, 550V, Flp Acb Switch & A/Y Make 20 S, 550V, Flp Acb Switch & Mineline Make 200 S, 550V, Dol Starter Of Dhemomain Incline Colliery Under Sodepur Area.
BOQ
| Sl. No. | Item Description |
| 1 | Items Description |
| 2 | Repairing of ABC make 200Amps, 550V, FLP ACB switch & A/Y make 20Amps, 550V, FLP ACB Switch & Mineline make 200Amps, 550V, DOL starter of Dhemomain Incline Colliery under Sodepur Area. |
| 3 | Repairing Isolator by providing fixed & moving contacts |
| 4 | Cost of moulded insulator |
| 5 | Cost of copper busbar |
| 6 | Cost of Amp. Meter with CT ratio 200/5 |
| 7 | Cost of Fixed contact assembly |
| 8 | Cost of moving contact assembly |
| 9 | Cost of Bakelite round & square tubes |
| 10 | Cost of outgoing brass terminals |
| 11 | Cost of flexible copper jumper with socketing |
| 12 | Cost of PVC copper flexible wire 4mm2 |
| 13 | Cost of ELR complete set |
| 14 | Cost of Overload complete set |
| 15 | Cost of Arc chute separator complete set |
| 16 | Cost of no volt coil with plunger |
| 17 | Body bolt & nut and painting |
| 18 | Labour charge |
| 19 | Cost of Isolator complete set |
| 20 | Cost of copper busbar |
| 21 | Cost of bush insulator terminals |
| 22 | Cost of incoming, outgoing and through going |
| 23 | Cost of thermal overload relay |
| 24 | Cost of ELR complete set |
| 25 | Cost of CT (200A/5A) |
| 26 | Cost of ML-10 Contactor Unit |
| 27 | Cost of Are chute separator complete set |
| 28 | Cost of Ammeter with CT (200A/SA) |
| 29 | Cost of push switch |
| 30 | Cost of indicator complete set |
| 31 | Cost of PVC copper flexible wire 4mm? |
| 32 | Body bolt & nut and painting |
| 33 | Labour charge |
| 34 | Overhead & profit @10% |
| 35 | Transportation charges |
| 36 | Add: PF @ 12% on labour cost |
| 37 | Add: Bonus @ 8.33% on labour cost |
| 38 | Add: Pension @ 7% on labour cost |
| 39 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysOct 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender