Tender For Provision Of 100 Kva, 11/0.4 Kv Substation For Newly Constructed 100 Seated Boys Hostel Of Odisha Adarsha Vidyalaya, Bhalumunda In The District Of Balangir
Tender Value
6.84 Lakhs
Estimated cost
Bid Submission
03 Oct 2026
11 days left
EMD
6900
Bank guarantee accepted
Document Fee
4000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Balangir → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Provision Of 100 Kva, 11/0.4 Kv Substation For Newly Constructed 100 Seated Boys Hostel Of Odisha Adarsha Vidyalaya, Bhalumunda In The District Of Balangir
BOQ
| Sl. No. | Item Description |
| 1 | A-11kv PP 55 mmsq AAAC on 9mtr PSC PolePOLE PSC 9 METER 300 KG including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @20% |
| 2 | 55 Sqmm AAAC including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 3 | GI Channel 75x40x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 4 | 11 KV V-Cross Arm(MS) (10.2 Kg each) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 5 | GI Back Clamp for V' Cross Arm(1.7kg) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 6 | 11 kv F clamp 2.9kg each including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 7 | 11 KV pin Insulator polymer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 8 | 8 SWG GI wire (for earthing) including 1% LC, T&P @1%, Transportation @7.5%, Erection Charge @20% |
| 9 | Earthing of Support ( Coil Type) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 10 | G.I Nuts, bolt & Washer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 11 | GI Barbered wire for anticlimbing including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 12 | Danger plate including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 13 | B- ESTIMATE OF SERVICES-11kv PP 55 mmsq AAAC on 9mtr PSC PolePadding and concreting materials for support including 1% LC |
| 14 | Survey and GIS data for Pole including 1% LC |
| 15 | Pole painting under LT/11KV/33KV network including 1% LC |
| 16 | C-11kv Line AAAC tapping on RSJ/PSC PoleCost of other materials for line and sub station 75X40X6mm. GI Channel for Straight Cross-arm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 17 | 11 KV V-Cross Arm(GI) (10.2 Kg each) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 18 | GI Back Clamp for V' Cross Arm(1.7kg) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 19 | 11 kv F clamp 2.9kg each GI including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 20 | 11 Kv B&S Disc Insulator Polymer 70 KN including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 21 | 11 KV B&S Hardware Fitting including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 22 | PG Clamp for 100Sqmm AAAC including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 23 | 11 KV pin Insulator polymer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 24 | H.T. Stay Set Complete including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 25 | H.T. Stay Insulator including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 26 | Stay clamp including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 27 | 7/10 SWG Stay Wire including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 28 | 8 SWG GI wire (for earthing) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 29 | G.I Nuts, bolt & Washer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 30 | Earthing of Support ( Coil Type) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 31 | D- ESTIMATE OF SERVICES-11KV Line AAAC tapping on RSJ/PSC PoleConcrete materials for stay anchor plate including 1% LC |
| 32 | Survey and GIS data for Pole including 1% LC |
| 33 | Pole painting under LT/11KV/33KV network including 1% LC |
| 34 | E- LT8 MTR PSC AB CABLE (3Cx95+1Cx70+1Cx16sq)Pole PSC 9 Mtr long 300 kg. PSC. including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @20% |
| 35 | Cable 1.1KV AB 4X95+1X95+1X16 Sq.mm XLPE including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 36 | 4 core Al PVC armoured 25 Sqmm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 37 | Pole Clamp for Eye-Hook AB Cable including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 38 | Dead end clamp for AB Cable including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 39 | Suspension Clamp for AB Cable including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 40 | I Hook for AB Cable including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 41 | Neutral Connector including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 42 | GI Stay wire 7/12 SWG-7/2.64mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 43 | LT Stay clamp gi (1.4 Kg/pair) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 44 | LT STAY INSULATOR including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 45 | G.I. Nuts, bolt 16x55 mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 46 | Earthing Coil including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 47 | No 8 GI wire (0.131 kg/mtr)for earth including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 48 | Piercing Connector LT Type A including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 49 | LT Stay Set Complete including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 50 | DIST BOX LT POLYCARBONATE (10 WAY) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 51 | F- ESTIMATE OF SERVICES-LT 8 MTR PSC AB CBL (3Cx95+1Cx70+1Cx16sq)Concrete of stay including 1% LC |
| 52 | Padding and concreting materials for support including 1% LC |
| 53 | Survey and GIS data for Pole including 1% LC |
| 54 | Pole painting under LT/11KV/33KV NETWORK including 1% LC |
| 55 | G- 100 KVA, 11/0.4 KV (AL) PLINTH MOUNTED SUBSTATION9 Mtr long 300 kg. PSC Pole including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @20% |
| 56 | 100 KVA, 11/0.4 KV Level-II Transformer (as per amndm4) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @5% |
| 57 | 8SWG GI Wire for Earthing including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 58 | GI Channel 100x50x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 59 | GI Channel 75x40x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 60 | GI Angle 50x50x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 61 | 11 KV Polymer Disc Insulator B&S (70KN) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 62 | 11KVH/W fitting for Disc (70KN) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 63 | PG Clamp for 100Sqmm AAAC including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 64 | GI Flat 50x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 65 | GI Flat 25x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 66 | 11KV A/B Switch (400 A,3 pole, Hz type) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 67 | 11KV HG Fuse (200 A, 3Pole Hz type) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 68 | 11 KV Lightning Arrestor including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 69 | Conductor ACSR PVC(61.7 Sqmm) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 70 | H.T. Stay set complete including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 71 | HT Stay Insulator including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 72 | HT Stay Clamp including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 73 | 7/10 SWG Staywire including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 74 | 40mm nomial bpre GI pipe (medium gauge) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 75 | Earthing of support (Coil type) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 76 | Pipe HDPE(25mm) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 77 | Pipe GI(100mm) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 78 | 1.1KV, 4Cx95 sqmm XLPE Cable including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 79 | 1Cx95 mm² LT XLPE Cable (Armoured) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 80 | LT Distribution Box with MCCB, Aluminium including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 81 | Al Cable Socket 70mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 82 | Al Cable Socket-95mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 83 | G.I.. Bolts, Nuts & Washers. including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 84 | GI Barbered wire for Anticlimbing including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 85 | Danger Plate including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% |
| 86 | H- ESTIMATE OF SERVICES- 100 KVA, 11/0.4 KV (AL) PLINTH MOUNTEDEarthing Pit for Pipe Earthing including 1% LC |
| 87 | Pole painting under LT/11KV/33KV network including 1% LC |
| 88 | Survey and GIS data for DTR including 1% LC |
| 89 | Survey and GIS data for Pole including 1% LC |
| 90 | Concrete materials for stay anchor plate including 1% LC |
| 91 | Padding and concreting materials for support including 1% LC |
| 92 | Economic Brick Design fencing including 1% LC |
| 93 | Plinth for Transformer including 1% LC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysOct 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender