Tender For Running Contract For The Work Related To Timely Disposal Of Applications Received Through Jhatpat / Investment Mitra Portal Under The Deposit Scheme And Cases Of Shifting Of Electricity Lines Under The Complete Deposit Scheme Under The Area Of
Tender Overview
Project Description
Tender For Running Contract For The Work Related To Timely Disposal Of Applications Received Through Jhatpat / Investment Mitra Portal Under The Deposit Scheme And Cases Of Shifting Of Electricity Lines Under The Complete Deposit Scheme Under The Area Of Electricity Distribution Section-1 Baraut.
BOQ
| Sl. No. | Item Description |
| 1 | FOR VARIOUS ELECTRICITY LINE WORKS, IN DEPOSIT SCHEME (RUNNLNG CONTRACT), IN THE JURISDICTION OF EDD-1st BARAUT UNDER EDC-BAGHPAT. |
| 2 | Carriage of all petty material of estimate, from Electricity store center, Baghpat/Baraut/Meerut to 33/11 KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 3 | Carriage of PCC Pole 11 mtr. Long from Electricity store center, Baghpat/Baraut/Meerut/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 4 | Carriage of PCC Pole 8.5 mtr./9 mtr. Long from Electricity store center, Baghpat/Baraut/ Meerut/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 5 | Carriage of 10 KVA to 100 KVA T/F from Electricity store center, Baghpat/Baraut/Meerut to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 6 | Carriage of 11 KV CT/PT Unit from Electricity store center,Baghpat/Baraut/Meerut to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 7 | Carriage of Metering Cubical Set Complete, from Electricity store center, Baghpat/Baraut/ Meerut to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 8 | Erection & Fixing of PCC Pole 8.5 mtr./9 mtr. long in 11 KV/LT. line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing Norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, as per direction of site in-charge. |
| 9 | Erection & Fixing of PCC Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts., as per direction of site in-charge. |
| 10 | Erection of double pole structure with all accessories on PCC Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/ Norns by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site in-charge. |
| 11 | Erection of double pole structure with all accessories on PCC Pole 8.5 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. TIF Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing Norms by providing all made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site in-charge. |
| 12 | Safe installation and erection of transformer at LT Sub-Station on Double Pole/Plinth using suitable crane/manual labour, including shifting, lifting, positioning and proper fixing of transformer at site, complete in all respects with necessary labour, tools and tackles, as per the directions of the Site In-charge. (10 KVA to 100 KVA T/F) |
| 13 | Safe erection and installation of 11 KV CT/PT Unit at Consumer Premises Double Pole/Plinth using suitable crane/manual labour, including shifting, lifting, positioning and proper fixing at site, complete with all necessary labour, tools and tackles, as per the directions of the Site In-charge. |
| 14 | Providing and Laying of 140/160 mm dia O/D PN-4, PE-80, UV-stabilized HDPE pipe in standard 6-meter lengths by trenchless/HDD method, including supply, drilling, pipe insertion, backfilling, end sealing and all necessary labour, machinery, tools and tackles, complete as per relevant IS specifications, RESPO technical norms and directions of Engineer-in-Charge. The contractor shall obtain all required ROW permissions, NOCs and clearances from concerned authorities at his own cost, including all applicable fees, charges and restoration expenses, for which no extra payment shall be made by the Department. Payment shall be made on actual completed linear-meter basis. |
| 15 | Laying of 11 KV and 33 KV XLPE cable under ground (50x2=100 Double Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms, as per direction of site in-charge. |
| 16 | Digging of earth and refling with road restoration pucca charge as per RESPO/Drawing Norms. (The Firm will be fully responsible for this work and taking necessary permission), as per direction of site in-charge. |
| 17 | Digging of earth and refling with road restoration Kaccha/footpath charge as per RESPO/Drawing Norms. (The Firm will bc fully responsible for this work and taking necessary permission), as per direction of site in-charge. |
| 18 | Laying of 11KV XLPE Cable 3x35+3x70+3x120-3x185 sq.mm and completion work properly, as per RESPO/Norms and as per direction of site in-charge. |
| 19 | Laying of LT ABC of various capacity and completion work properly, as per RESPO Norms and as per direction of site in-charge. |
| 20 | Erection, fixing and mounting of Distribution Box on pole, including providing and fixing 02 Nos. DIB clamps with suitable size nuts, bolts and washers, complete in all respects as per site requirement and directions of the Site In-charge. |
| 21 | Providing and fixing of Suspension Clamp with Eye Hook as per RESPO Norms and as per direction of site in-charge. |
| 22 | Providing and fixing of Dead End Clamp with Eye Hook, as per RESPO/Norms and as per direction of site in-charge. |
| 23 | Making and filling of 11 KV Cable Jointing Kit, Indoor/outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms and as per direction of site in-charge. |
| 24 | Installation of 11 KV Metering Cubical Complete work as per RESPO Norms and as per direction of site in-charge. |
| 25 | Fabrication & Fixing of T-Channel on pole by providing Holding Clamps, F-Clamps & Proper size nuts & bolts, as per RESPO/Norms and as per direction of site in-charge. |
| 26 | Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60xO.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drawing. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6 mm with proper size bolts & nuts & loops, as per direction of site in-charge. |
| 27 | Earthing of supports with MS earth Rod of (20x2500) mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5 m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site in-charge. |
| 28 | Grouting of ST/PCC Pole supports in CC 1:4:8 (Cement, sand & 40mm brick ballst) Grouting will be done in the block of size (450x450)mm x 1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site in-charge. |
| 29 | Wrapping of barbed wire on 11KV ST/PCC poles as anti-climbing device for a length of 0.9 mtrs. Wire pitch/gap 13 mm and fixing upper and lower end keeping lower end at a height of 2.75 mtr from the ground complete, including providing & fixing of lower end & upper end clamps made of M.S. Flat 40X5 mm complete with nuts & bolts and all other required material and T&P., as per direction of site in-charge. |
| 30 | Fabrication of Guarding Angle X-Arm & other requisites material for guarding by drawing 02 Nos G.I Wire and making loop at suitable distance as per RESPO drawing Norms by providing holding 02 Nos. Eye bolts made of M.S. round size 12 mm dia-100mm long & Cross Arm clamps made of M.S. Flat of size 50X6 mm and bolts as per norms of RESPO and as per direction of site in-charge. |
| 31 | Laying, Stringing and final sagging of ACSR Weasel/Rabbit Conductor, as per RESPO Drawing/Norms and as per direction of site in-charge. |
| 32 | Laying, Stringing and final sagging of ACSR Dog Conductor, as per RESPO/Drawing Norms and as per direction of site in-charge. |
| 33 | Laying, Stringing and final sagging of LT ABC cable 1x16 sq.mm, as per RESPO/Drawing Norms and as per direction of site in-charge. |
| 34 | Providing & Fixing of (3.1. pipe 6\\"dia Class-B over 11 KV 3X70 and 3x120 Sq.mm XLPE cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be buried under carth about 500mm each including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends, as per direction of site in-charge. |
| 35 | Construction of T/F plinth suitable for 250 KVA transformer, size 2×2×1.5 m, as per approved drawing, including CC work in foundation in ratio 1:4:8 (Cement, Sand & Brick Ballast), 1st class brick work in side walls in CC ratio 1:4 (Cement & Fine Sand), 12 mm thick plaster in ratio 1:4, RCC work on top of plinth in ratio 1:2:4, duly filling and ramming of brick ballast inside the plinth, including cost of all materials, labour, tools and tackles, complete in all respects. The contractor shall obtain all necessary permissions/NOCs required for construction of the T/F plinth at his own cost. Any obstruction, hindrance or difficulty arising during construction shall be resolved by the contractor at his own cost and responsibility, for which no extra payment shall be admissible, as per drawing and directions of the Site In-charge. |
| 36 | Receiving 250 KVA Transformer from Electricity Store Center, Baghpat/Baraut/Meerut installing it on the plinth, cable connection and all related work, as per RESPO/Norms and as per direction of site in-charge. |
| 37 | Erection & Fixing of 11 KV Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site in-charge. |
| 38 | Erection & Fixing of 11 KV TPMO set on STP/PCC Pole, by providing all required fixing materials as per RESPO Norms and as per direction of site in-charge. |
| 39 | Construction of safety fencing (MS) for 11/0.4 KV Transformer Sub-Station, including supply of all required materials for MS fencing with 50×50×3 mm MS wire mesh, vertical posts duly grouted/fixed in ground/on floor and horizontal angle-iron fitted to the vertical posts. Pickets, wherever required, and suitable gate shall be provided for entry and exit. Vertical and horizontal posts shall be made of MS Angle 75×75×6 mm, preferably spaced at 800–1000 mm, and grouted in CC 1:4:8. The length of vertical posts shall be adequate as per site requirement. All MS fencing materials shall be properly treated/coated with suitable anti-corrosive material to ensure protection against rust and corrosion, complete in all respects as per site requirement and directions of the Site In-charge. |
| 40 | Providing & Fixing of Stone Pad 300x300x75 mm as per RESPO/Drawing Norms and per direction of site incharge. |
| 41 | Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site in-charge. |
| 42 | Providing & Fixing of Number Plate alongwith all required accessories (like suitable clamps, nuts & bolts etc) as per RESPO/Drawing Norms and per direction of site in-charge. |
| 43 | Safely dismantling work properly and carriage of old & used STP/PCC Pole from site to Electricity store center,Baghpat/Baraut/Meerut with loading and unloading at both ends on Kachha Packka road as per direction of site in-charge. |
| 44 | Safely dismantling & removal and carriage of old & used ACSR Conductor from site Of work to Electricity store center, Baghpat/Baraut/Meerut with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 45 | Safely dismantling Work properly and carriage of old & used 25/63KVA T/F from site of work to Electricity store center, Baghpat/Baraut/Meerut with loading and unloading at both ends on Kachha Packka road, as per direction of site in-charge. |
| 46 | Earthing of Neutral and Body of Transformer by boring and lowering 32 mm dia G.I. pipe electrode up to water level or 90 feet depth, including providing solid copper cone approximately 225 mm long and 750 gm in weight at the lower end, complete with continuous 6 SWG copper wire from the cone up to ground level for connection with M.S. earth strip. The earth strip shall be properly welded to the G.I. pipe and connected to the transformer neutral/body earthing arrangement, including all labour, material, tools and tackles, complete as per the directions of the Site In-charge. |
| 47 | Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrode size 80mm x 3000mm complete with 50 KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be soiled to the earthing and neutral support, as per RESPO Norms and as per direction of site in-charge. |
| 48 | Jumpering and line energisation work properly as per RESPO Norms and as per direction of site in-charge. |
| 49 | Lopping, trimming, cutting, and safe clearance of overlapping tree branches, dense foliage, or hazardous trees obstructing the right-of-way (ROW) of overhead LT/HT power lines to maintain electrical safety clearances and prevent line tripping; the scope includes the immediate collection, handling, transportation, and ecologically safe disposal of all green waste and cut branches away from the site to a designated municipal/safe dumping zone. |
| 50 | Terms :1. All type of bolts-nuts, lugs, F-Clamps, X-Arm Holding Clamps, Top & Dropper Channel Clamps, Stay Clamps, Stay Insulators, Cotton Tape, Empire Tape shall be provided by the contractor at his own cost.2. No T&P, tools, plant or labour shall be provided by the Department. The contractor shall arrange all necessary T&P, tools, plant and labour at his own cost. All required ROW permissions/clearances and NOCs from the concerned authorities, wherever applicable, shall be obtained and provided by the contractor at his own cost. No extra payment shall be admissible on this account.3. Contractor shall be responsible for any damage for material, equipment and other accessories issued to them by PVVNL/UPPCL for execution for work, it damage occures during carriage, handling and fabriaction and errection process by the contractor, In such condition cost fo the damage material shall be recovered from the contractor as per exsiting rules and regulations of PVVNL/UPPCL.4. Contractor shall be responsible for taking proper shutdown from requried S/S & shall be responsible for providing security equipements to their labour.5. Contractor shall be responsible for proper supervision to avoid any accident/Mis happening and department shall not be responsible for any accident or Mis happening Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender