Tender For Development Of Parks With Toe Wall, Grill Fencing And Earth Filling Etc. In Sector-11 (Part B) Bahadurgarh With 03 Years Defect Liability Period Free Of Cost (Idc Work). A/C Rs.60.09 Lacs E/M Rs.120180/- T/Limit : 04 Months
Tender Overview
Project Description
Tender for Development Of Parks With Toe Wall, Grill Fencing And Earth Filling Etc. In Sector-11 (Part B) Bahadurgarh With 03 Years Defect Liability Period Free Of Cost (Idc Work). A/C Rs.60.09 Lacs E/M Rs.120180/- T/Limit : 04 Months
BOQ
| Sl. No. | Item Description |
| 1 | 4.7.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth and lift up to 1.5 m, as directed by Engineer-in- Charge:1..1 All kinds of soil 50m lead |
| 2 | 9.34.6 SHEET ROOFING Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm ( plus 0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete :6 Gutter (600 mm over all girth) |
| 3 | 4.12.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m,as directed by Engineer-in-charge.1 All kinds of soil |
| 4 | 10.8 CEMENT CONCRETE FLOORING Providing and laying of conglomerate floor 40mm thick cement concrete topping. |
| 5 | 11.6.1 CEMENT PLASTER (IN FINE SAND) 15 mm cement plaster on the rough side of single or half brick wall of mix :1 1:4 (1 cement: 4 fine sand) |
| 6 | 10.30.2 TILE FLOORING Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).2 Medium shade pigment using 50% white cement 50% Grey cement. |
| 7 | 13.29.2 SIGLE/BUILT-UP STEEL/TUBULAR SECTIONS Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 8 | 13.30.2 SIGLE/BUILT-UP STEEL/TUBULAR SECTIONS Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.2 Hot finished seamless type tubes |
| 9 | 11.68.3 INTERIOR FINISHING Applying priming coat:3 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works. |
| 10 | 10.100.1 OTHER MISCELLANEOUS ITEMS USED FOR FLOORING 0 Cement Concrete 1:8:16 Flooring1 Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. |
| 11 | 11.78 INTERIOR FINISHING Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. |
| 12 | 17.8.1 Clearing and Grubbing Road Land . Compaction1 Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling. |
| 13 | 7.20.2 BRICK WORK Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in:2 Cement Mortar 1:6 (1 cement : 6 coarse sand). |
| 14 | 30.24 FINISHING WORKS Distempering with dry distemper of approved brand and manufacture(one or more coats) and of required shade on old work to give an even shade. |
| 15 | 26.58.1 Supply and installation of garden bench1 Chair type garden bench with L-shaped sides made of reinforced concrete (M30), thickness 100 mm, overall height 1000 mm, base width 620mm. Back and seat shall consist of 5 Nos. reinforced concrete planks 1500 mm x 100 mm x 50 mm one plank 1500 mm x 200 mm x 50 mm. Seating height of the bench shall be 450 mm. The bench shall be fixed with nuts on concrete mount, all holes sealed after assembly and installation. All materials required to be as per BIS specifications. |
| 16 | 6.1.1 A CEMENT CONCRETE (CAST IN SITU) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level:1 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 17 | 6.2.2 A CEMENT CONCRETE (CAST IN SITU) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing:2 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 18 | 6.8.2 B DAMP-PROOF COURSE Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)2 40mm thick |
| 19 | 6.14.2 D REINFORCED CEMENT CONCRETE Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :2 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 20 | 6.29.3 I CENTRING AND SHUTTERING (FORM WORK) Centering and shuttering including strutting, propping etc. And removal of form work for :3 Columns, piers, abutments, pillars, posts and struts |
| 21 | 6.39.1 K CEMENT CONCRETE PRECAST Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete1 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 22 | 3.1.2 Schedule A By Mechanical Transport including loading, unloading and stacking2 Earth (Beyond 5km up to 10km per KM) |
| 23 | 6.33.3 J STEEL REINFORCEMENT Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level3 Cold twisted bars. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender