Tender For New Construction Work Of Road From Ashok Ke Bhatte To Khampur Road In Village Dhikana, Block Baraut, District Baghpat Under The Financial Year 2026-27
Tender Value
1.72 Crore
Estimated cost
Bid Submission
28 Sep 2026
6 days left
EMD
10.61 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baghpat → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Work Of Road From Ashok Ke Bhatte To Khampur Road In Village Dhikana, Block Baraut, District Baghpat Under The Financial Year 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distacnce of 100 m. including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-section. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 2 | Construciton of embankment with apporved material obtained from borrow pis with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet reqirement of Tables 300.1 and 300.2 with a lead upto 100 as per Technical Specification clause 301.5. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 3 | Construciton of subgrade and earthen shouldres with approved material obtained from borrow pits with all lifts and leads, tranporting to site, spreading, grading to required slpoe and compacted meet requirement of table 300.2 with lead upto 100m as per Technical specification clause 303.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 5 | Providing,laying and spreading material on a prepared sub cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 6 | Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per Technical Specification Clause 503. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | Providing and laying and rolling of open graded premix carpet by Manual Means of 20 mm thickness composed of 13.2 mm to 5.6 mm agregates using V.G.-10 grade bitumen bitumen to required line grade and level to serve as wearing course on previously prepared base by manual MORD specific ations 508 (excluding cost of labour cess & GST). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 8 | Providing and laying seal coat by manual means with 80/100 grade bitumen sealing the voids in bitumens surface laid to the specified levels grade and cross fall using type C as per Technical Specification Clause 510 (excluding cost of labour cess & GST). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 9 | Direction and Place Identification signs with size more than 0.9 sqm size board / A. Retro-reflectorised Traffic Signs / (i) Providing and erecting direction and place identification retro-\reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 10 | Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 / ii) Ordinary Kilometer Stone (Precast). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 11 | Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703/iii) 200 m stone (precast). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 12 | Construction of 350mm Dai NP-3 Hume pipe culvert. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 13 | Laying of hume pipe 600mm dia for diversion of nala water. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 14 | M-150 brick on edge pavement on patries laid dry joints filling with local sand including prepration of base to proper slope and its ramming spreading layer of 1cm.of local sand over the sub grade including supply of all materials labour T&P etc.proper complitation of the work.S.I.763. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 15 | Dismantling of brick works including stacking of materials as dericeted by engineer incharge within a distance of 60 meters.al as per s.i.no.692. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 16 | Removal of unserviceable soil including excavation,loading and disposal up to 1000 meters lead but excluding replacement by sutiable soil which ahall be paid separately as per clause 305. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 17 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 m and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 18 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401(including,labour cess but excluding G.S.T). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 19 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(M-10)(P.C.C). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 20 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5(M-30). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 21 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.As per UPPWD SOR no 504. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 22 | Supply & Fixing of 100 mm dia Drainage Spouts of MS with gratings as per drawing including cost of all materials, labour, T & P etc. required for proper completion of the work as per drawing and Technical specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 23 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 24 | Providing and erecting direction and place identification retroreflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. With 7 years warranty. Rates include design, fabrication, supply, transportation and erection of the sign board and also inclusive of taxes, royalty etc. all T&P/machine material and labour required for proper completion of work. Note : The Composite warranty jointly signed by original manufacturer & authorized converter of at least 7 years shall be furnished on non judicial stamp of required denomination both for retro reflective sheet and also complete signage. (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) New Item no 2. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 25 | Painting and lattering on both side parapet. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 26 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 m and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 27 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.