Housing Urban and Rular Development Government Departments Closing in 6 days TDR #57619691

Tender For New Construction Work Of Road From Village Jivana, Development Block Baraut Towards Village Bavli In Baghpat District Under The Financial Year 2026-27

Issued by Government Departments · Baghpat, Uttar Pradesh
Tender Value
1.52 Crore
Estimated cost
Bid Submission
28 Sep 2026
6 days left
EMD
9.63 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Baghpat → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for New Construction Work Of Road From Village Jivana, Development Block Baraut Towards Village Bavli In Baghpat District Under The Financial Year 2026-27

BOQ

Name of Work:-
Sl. No. Item Description
1Construciton of embankment with apporved material obtained from borrow pis with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet reqirement of Tables 300.1 and 300.2 with a lead upto 100 as per Technical Specification clause 301.5. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
2Construciton of subgrade and earthen shouldres with approved material obtained from borrow pits with all lifts and leads, tranporting to site, spreading, grading to required slpoe and compacted meet requirement of table 300.2 with lead upto 100m as per Technical specification clause 303.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
3Providing,laying and spearding material on a prepared sub grade, adding cement @ 2% by weight to the spraed Material manually, mixing in place with rotavator and compacting with the road rollar at OMC to achive the desired unconfined compressive strength and to from a layer of sub- base. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
4Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
5Providing,laying and spreading material on a prepared sub cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
6Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per Technical Specification Clause 503. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
7Providing and laying and rolling of open graded premix carpet by Manual Means of 20 mm thickness composed of 13.2 mm to 5.6 mm agregates using V.G.-10 grade bitumen bitumen to required line grade and level to serve as wearing course on previously prepared base by manual MORD specific ations 508 (excluding cost of labour cess & GST). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
8Providing and laying seal coat by manual means with 80/100 grade bitumen sealing the voids in bitumens surface laid to the specified levels grade and cross fall using type C as per Technical Specification Clause 510 (excluding cost of labour cess & GST). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
9Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 / ii) Ordinary Kilometer Stone (Precast). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
10Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703/iii) 200 m stone (precast). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
11Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. DSR 2023 SI. No. 2.6.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
12Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. 1:5:10 (1 cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023 SI.No. 4.1.10. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
13Laying of hume pipe in position ( Labor only) including labour and T & P etc. required for completion of the work. ( SI No. 10.27). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
14Brick work with common bunt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand. DSR SI.No. 6.1.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
15Pointing on brick work or brick flooring with cement mortar. Struck or weathered pointing 1:3 (1 cement : 3 fine sand): DSR 2023 SI.No. 13.31.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
16Cost of 350mm dia NP-3 Class hume pipe. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
17Laying of hume pipe 600mm dia for diversion of nala water. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
18M-150 brick on edge pavement on patries laid dry joints filling with local sand including prepration of base to proper slope and its ramming spreading layer of 1cm.of local sand over the sub grade including supply of all materials labour T&P etc.proper complitation of the work.S.I.763. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
19Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 m and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
20Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401(including,labour cess but excluding G.S.T). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
21Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(M-10)(P.C.C). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
22Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5(M-30). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
23M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.As per UPPWD SOR no 504. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
24Supply & Fixing of 100 mm dia Drainage Spouts of MS with gratings as per drawing including cost of all materials, labour, T & P etc. required for proper completion of the work as per drawing and Technical specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
25Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
26Painting and lattering on both side parapet. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
27Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 m and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge.
28Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57619691
AUTHORITY Government Departments
TENDER VALUE 1.52 Crore
LAST DATE 28-09-2026
Authority
Authority Name Public Works Department
Work Description Tender for New Construction Work Of Road From Village Jivana, Development Block Baraut Towards Village Bavli In Baghpat District Under The Financial Year 2026-27
Basic Detail
Tender No 3691/11Cashier-MC PD Baghpat Dt 25-08-2026
Bidding Type Tender
Location
City Baghpat
State Uttar Pradesh
Key Dates
Publish Date 21 Sep 2026
Submission Date 28 Sep 2026
Open Date 28 Sep 2026
Finance
Tender Value 1.52 Crore
Tender Fee 2714
EMD 9.63 Lakhs
Exemption Not Available
Document List
b52ca311-566b-4072-b24c-280fec75aa3e.html
BOQ_2237973.xls
Tendernotice_1 (75).pdf
Tendernotice_2 (16).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Sep 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

b52ca311-566b-4072-b24c-280fec75aa3e.html

xls

BOQ_2237973.xls

pdf

Tendernotice_1 (75).pdf

pdf

Tendernotice_2 (16).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders