Defence Government Departments Closing in 23 days TDR #57618944

Bids Are invited for Repair And Overhauling Service - Com/1018/Ml/Nr O/L-26/A Offloaded Refit Of Metal Lighter; Any Other Suitable Brand; Yes; Buyer Premises - 001 Docking- Vessel To Be Docked In Both Versions.Note 1:- Firms Not To Quote View Docking

Issued by Government Departments · Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Oct 2026
23 days left
EMD
2.95 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair And Overhauling Service - Com/1018/Ml/Nr O/L-26/A Offloaded Refit Of Metal Lighter; Any Other Suitable Brand; Yes; Buyer Premises - 001 Docking- Vessel To Be Docked In Both Versions.Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises [I.E Nd(V)/Slipway]. Last Docking - 12 Dec 23 , 002Hull Cleaningunder Water, Boot Top Area, Shipside, Above Water,Weather Deck And Super Structure.(A) Jet Clean Entire Under Water Area And Boot Top Area (With A Pressure Not Exceeding 3000 Psi) Including Ship Side And Remove The Marine Growth/ Barnacles And Present For Survey. , 002Hull Cleaningtanks(B) Manually Clean All Internal Tanks. The Tanks Should Be Washed Out With Fresh Water And Soap Water To Remove Any Sediment Or Dirt Present In The Tank. Qty 06 Nos , 003 Hull Survey External And Internal Hull Survey. Carry Out Visual And Hammer Survey (In The Presence Of Qc Representatives) In Accordance With No 01/15 Of Under Water Hull Including Boot Top Area, Above Water Hull, Super Structure, All Internal Compartments Weather Decks Including Deck Fittings(I.E. Bollards. Cable Reel Anchor Windlass Foundation ) Firm To Submit 04 Copies Of Hull Survey Report . , 004Utg Surveycarry Out Utg Survey In The Presence Of Qc Representatives Of U/W Hull, Internal Tanks And Weather Deck And Wherever Recquired Ie.Superstructure,Above Water Hull, Tank Top Etc.As Directed By Survey Team. Firm To Submit 04 Copies Of Hull Survey Report. , 005Steel Renewalsquote For Steel Renewal At Various Locations As Per Survey Reportnote 1:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A Quality Ship Building Steel For Shell And Is 2062 Grade `B Quality Steel For Non Structural Works, Degutting/Regutting/ Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging/Panelling, Minor Fittings/ Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. , 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team/ Rmt (A) 25 X 25 Mm , 006Build Ups(B) Carry Out Build Ups As Indicated By The Hull Survey Team/ Rmt (B) 50X50 Mm , 007Fairing Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team/ Surveyor , 008Re-Welding Runcarry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team/ Qc/ Rmt. , 009 Draught Marksdraught Marks, Both Roman And Numeric, Corroded/Eaten Away. To Be Renewed And Painted All Draught Marks. , 010 Sacrificial Anodes(A) Renew Mk - Ii Sacrificial Anodes Which Are Perished Over 50%.Note:- Anodes Will Be Supplied By Firm. , 010 Sacrificial Anodes (B) Renew Mk - Iii Sacrificial Anodes Which Are Perished Over 50%. Note:- Note:- Anodes Will Be Supplied By Firm. , 011 Surface Preparation Under Water Area Including Boot Top Area With Grit Blasting (A) Grit Blasting To Sa 2.5 Standard To Be Carried Out On Complete Uw Area Including Boot Top For Renewal Of Paint As Per No-53/16. , 011 Surface Preparation Under Water Area Including Boot Top Area With Grit Blasting (A) Swveep Blasting Sa1 To Be Carried Out On Complete Uw Area Including Boot Top For Renewal Of Paint As Per No-53/16. , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Area Under Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Penguard Primer - 50 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Area Under Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Anti Corrosive - Jotacote Universal (Grey) - 150 Microns , 012 Painting - Jotun Scheme Under Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (E) 5Th Coat: A/F: Sea Quantum Pro U And Spectrum 150 Microns (Light Red/Dark Red) - 150 Microns Dft , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areapaint Under Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (F) 6Th Coat: A/F: Sea Quantum Pro U And Spectrum 150 Microns (Light Red/Dark Red) - 150 Microns Dft , 012 Painting - Jotun Schemeboot Top Areaboot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (G) 7Th Coat: A/F: Seaquantum Ultra(Black)-1X150 Microns Dft , 013Surface Preparation Above Water Area (A) Carry Out Grit Blasting To Sa 2.5 Standard For Application Of New Paint. , 013Surface Preparation Above Water Area (A) Carry Out Grit Blasting To Sa1standard For Application Of New Paint. , 014 Painting - Jotun Scheme.Above Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer - 50 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic(Grey/ Red Brown) - 125 Microns Dft , 014 Painting - Jotun Schemeabove Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jotamastic(Grey) - 125 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area, Super Structure And Deck Fittings Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Hard Top Xp Ral 7040 (Grey) - 60 Microns Dft , 013Surface Preparation Super Structure(A) Carry Out Powertooling St3standard For Application Of New Paint. , 013Surface Preparation Super Structure(A) Carry Out Power Tooling St1 Standard For Application Of New Paint. , 014 Painting - Jotun Scheme.Super Structure Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer - 50 Microns Dft , 014 Painting - Jotun Scheme. Super Structure Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic 80(Grey/ Red Brown) - 125 Microns Dft , 014 Painting - Jotun Schemesuper Structure Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Ral9010 (White) - 125 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area, Super Structure And Deck Fittings Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Ral 9010(White) - 60 Microns Dft , 015 Surface Preparation Weather Decks And Bridge Top Carry Out Hydrojet Ballasting To Wj 2.5 Standard On Weather Deck And Bridge Top. , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Penguard Primer -50 Microns Dft , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotacote Universal N10 (Aluminium)- 2X150 Microns , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Non Slip Epoxy D.A. Grey With Hardner (Hdns)- 2X250 Microns , 017 Surface Preparation Internal Tanks Carry Out Mechanical Cleaning To St3 Standard As Per Survey Report Of Paint Oem For Paint Application. , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(A) 1St Coat: Primer - Penguard Primer -50 Microns Dft , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(B) 2Nd Coat: Anticorrosive Balloxy (Hb Light) - 150 Microns , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(C) 3Nd Coat: Anticorrosive Balloxy (Hb Light) - 150 Microns , 020Nwt Doors(A) Nwt Wooden Door Broken, To Be Renewed Including Door Frame/ Coaming, Hinges , Door Stopper,And Mortise Lockes.(Godrej) , 020Nwt Doors(B) Nwt Wooden Door Broken, To Be Repaired. Repair Job Also Includs Door Frame/ Coaming, Hinges , Door Stopper, Mortise Lockes Renewel.(Godrej) , 021Sky Lightswater Leakage Observed From Sky Light. Rubber Beading And B/F Nut / T Bolts Of Sky Light To Be Renewed. Post Renewel Of Rubber Beading Chalk Test To Be Undertaken. , 022Cable Reel(A) Overhaulling Of Cable Guide Roller Assembly Including Gear Box And Driving Chain Assembly To Carried Out. Clean Rust , Grease , Oil And Apply New Grease. , 022Cable Reel(B) Oil Leakage Observed Gear Box Assemble. Oil Seal And Drain Plug To Be Renewed. , 023Cable Reel(C) Overhaulling Of Manual Operating Machenism Of Cable Reel To Be Carried Out.Note: Trials To Be Conducted Post Overhaulling In Presence Of Qc. , 023Cable Reel(D) Cable Reel Drum And Its Foundation Corroded/Thinned. Visual And Hammer Survey To Be Carried Out. Repair/Renewel To Be Undertaken As Per Survey Report. , 024Gauardrail And Stanchions(A) Fixed Guardrail Stanchions And Pipes Damaged/ Broken To Be Renewed.Pipe Dia - 2 Inch , 024Gauardrail And Stanchions(B) Fixed Guardrail Ms Rod Damaged/ Broken To Be Renewed.Rod Dia - 1 Inch , 024Gauardrail And Stanchions(C) Guardrails Securing Chain Damaged/ Broken To Be Renewed. Size - 8 Mm , Mat - Ms , 024Gauardrail And Stanchions(D) D- Shackles For Guardrails Securing Chain Damaged/ Broken To Be Renewed. Mat - Ms , 025Wt Hatchbutterfly Nut Demaged/Broken To Be Renewed As Per S Le. Mat- Ss , 025Wt Hatchoverhauling Of Wt Hatch Including Clips To Be Undertaken(04 Clips). , 026Wt Dooroverhauling Of Wt Door Including Clips To Be Undertaken(06 Clips). , 027Rubber Beadingrenewal Of Rubber Beading Of Wt Doors And Wt Hatches.Note: Post Renewal Of Rubber Beading Chalk Test To Be Prooved , 028Furniture(A) Wooden Panelling With Sunmica At Various Location Damaged, To Be Renewed. , 028Furniture(A) Fitment Of Plywood For 04 Bunks To Be Renewed. , 028Furniture(A) Firm To Supply O4 In Mattress , 029Mfmb Laggingmfmb Lagging Perished At Various Location, To Be Renewed. , 030Breather/ Vent Pipe(A) Vent Pipes Of Various On Upper Deck Corroded,Thinned And Holed To Be Renewed. , 030Breather/ Vent Pipe(A) Breather Head Corroded/Damaged. Breather Head To Be Renewed Along With Wiremess And Rubber Seal. , 030Breather/ Vent Pipe(B) Vent Pipe (Goose Neck Type) Corroded/Damaged. Vent Pipe Including Cap,Butterfly Nut To Be Renewed. Size - 50Mm , 031Wire Messwiremess For Mushroom Head Damaged To Be Renewed. , 031Linoleum Sheetlinoleum Sheet To Be Renewed. , 031Sliding Window & Fixed Windowslinding Glass & Fixed Glassof Window Jammed/Damaged. Window Glass Alongwith Locking Clip To Be Renewed. , 032 Bollards Single Bollards (A) Bollards Including Foundation Corroded, Thinned To Be Repaired As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.(I) Vertical Pipe Size: Dia-12, Height- 1.4 Mtr (Ii) Cross Arm Pipe Size - Dia 150Mm , Length - 800 Mm , 032 Bollards Single Bollards (A) Bollards Including Foundation Corroded, Thinned To Be Renewed As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.(I) Vertical Pipe Size: Dia-12, Height- 1.4 Mtr (Ii) Cross Arm Pipe Size - Dia 150Mm , Length - 800 Mm , 033 Bollards Twin Bollards (A) Twin Bollards Including Foundation Corroded, Thinned To Be Repaired As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.Size : Foundation Size 700X350 Mm, Pipe Dia 250Mm , 033 Bollards Twin Bollards (B) Twin Bollards Including Foundation Corroded, Thinned To Be Renewed As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.Size : Foundation Size 700X350 Mm, Dia 250Mm , 034Anchor Windlassoverhauling Of Anchor Windlass To Be Carried Out. Overhauling Invlove Removel Of Drum, Gear Box And Brake Linings And Clean Rust, Grease Of All Component. Post Overhauling Refit And Prove For Satisfactory Operation. , 035Guide Rollerguide Roller Of Chain Cable Jammed To Be Overhauled And Prove For Free Movment. , 036D Shaped Fenders (A) Remove All D Shaped Fenders For Survey Of C Channels And Necessary Repairs Is To Be Attended On Securing Channels Including Nut And Bolts. Post Repair Of C Channels Fenders Is To Be Fitted , 036 D Shaped Fenders (B) D Shaped Fenders Damaged/Perished To Be Renewed.Specification - Epdm Rubber As Per Nes 170. Colour Blacksize On Fender 1500X 200 Mm And Id 75 Mm.Note- Quote For Material , 036D Shaped Fenders Securing Arrangement Nut And Bolts (C) Fender Securing Arrangement I.E Nut And Bolts Corroded/Thinned , To Be Renewed For Securing Of D Fenders Around Ship Side.Size: N24 Size Nut Bolt , Mat - Ss , 037 Surface Preparation Fresh Water Tanks (02 Nos)(A) Carry Out Mechanical Cleaning To St3 Standard For Paint Application. , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Hb (White) -100 Microns Dft , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Penguard Hb(Grey) -100 Microns Dft , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Penguard Hb (White) -100 Microns Dft , 039 Manhole Cover (A) Manhole Cover Of Various Tanks Corroded/Thinned, To Be Renewed . , 039 Manhole Cover (B) Nut And Bolts Of Manhole Cover To Be Renewed As. Mat-Ss , 039 Manhole Cover (C) Rubber Joints Of Manhole Cover To Be Renewed. , 040 Apt Air Pressure Test The Following Tanks And Rectify The Defects Any Observed During Pressure Testing And Prove To 0.14 Kg/ Cm2. Note:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0006 Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. Internal Tank , 041 Surface Preparation Internal Compartment(A) Carry Out Mechanical Cleaning To St3 Standard For Paint Application. , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer -50 Microns Dft , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic 80 (Grey) -150 Microns Dft , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Middle Burnswick Green Finishing Paint -100 Microns Dft , 043 Cable Reels Cover (A) Manufacturing Of Water Proof Canvas Cover For Cable Reels As Per S Le.Approx Size For Each Cable Reel - 15 Sqm , 043 Cable Reels Cover (B) Manufacturing Of Water Proof Canvas Cover For Motors As Per S Le. Approx Size For Each Motor- 4 Sqm , 044 Sanitry System (A) Ss Wash Basin, Corroded To Be Renewed. (Mat- Ceramic, Make - Cera) Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (B) Wc Commode In Crew Washroom Damaged/Corroded. W/C Along With Flush Tank To Be Renewed (Mat- Ceramic, Make - Cera) Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (D) Ss Tap: 1/2 Inch Damaged To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (E) Fresh Water Supply Pipes Deformed/Damaged To Be Renewed. Pipe To Be Connected With Water Tank And Prove System Satisfactory Operation. Mat : Pvc/ Cu - Ni Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (F) Drain Pipe In Crew Bathroom And Wc Corroded Pipe To Be Renewed. Mat-Ms,Dia- 2 Inch , 044 Sanitry System (G) Mirror To Be Renewed (As Per S Le) Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (H) Shower Head To Be Renewed (Cera Make). Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (J) Health Faucet Damaged/Broken In Crew Wc To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (K) Flush Valve Damaged/Broken In Crew Wc To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 045 Extinguishers Firm To Supply Fire Fighting Equipments (A) 9 Ltr Afff Extinguisher , 045 Extinguishers Firm To Supply Fire Fighting Equipments Provision Of Following Extinguishers To Be Undertaken (B) 2 Kg Co2 Extinguisher , 045 Extinguishers Firm To Supply Fire Fighting Equipments Provision Of Following Extinguishers To Be Undertaken (C) 10 Kg Dcp Extinguisher , 045 Ff Items (D) Provision Of Following Fire Hoses To Be Undertaken - Fire Hoses Length 15 Mtr With End Coupling Of Brass , 045 Ff Items (E) Fire Hose Box To Be Renewed At Various Location. , 045 Ff Items (F) Extinguisher Securing Arrangement Of Co2 , Afff , Dcp Extinguisher To Be Made At Various Location. Mat - Ms , 045 Ff Items (G) Firm To Empty Foam Tank. Old Foam Solution To Be Taken Out And Disposed As Per Exiting Guidelines. , 045 Ff Items (H) Firm To Supply Foam Solution Afff (3% Concentration) And Foam To Be Filled Onboard Craft. , 046Dc Bagdc Bag Torn/Damaged. Firm To Supply New Dc Bag With Following Dc Containt(I) Adjustable - 01 Nos(Ii) Jubli Clips - 05 Nos(Iii) Soft Wood Wadges - 15 Nos(Iv) Occam - 1 Kg(V) Spanners - 5 Nos(Vi) Multi Purpose Band -03 Nos(Vii) Stopper Plate/Stopper Pad - 02 Nos , 047Dc Torch(A) Dc Torch Non-Ops / Ber . To Be Renwed As Per S Le. , 047Dc Torch(B) Serveciability Checks Of Dc Torch Battries To Be Carried Out. Defective Battries To Be Renewed. , 048Key Securing Boardkey Hanging Board Damaged/Broken To Be Renewed As Per S Lemat- Wooden , 049Basccabascca Set I.A.W Extant Naval Policies Be Provisioned For Firefighting. Make - Dragger Or Santurian. Capacity 300 Bar , 050Fire Suitfire Suit With Gloves And Boot I.A.W Extant Naval Policies To Be Provisioned For Firefighting. As Per S Le. , 051 Panelling Ss Panelling At Indicated Locations Damaged To Be Renewed. , 052 Life Saving Appliance (A) Firm To Replace With New Life Raft Securing Arrangement (Polyester Webbing With Ss Slip And Hanger) Including Hydrostatic Release Unit (Hru Hammer H20 R). , 052 Life Saving Appliance (B) Firm To New Life Buoy (Tug Name To Be Indicated) , 052 Life Saving Appliance (C) Life Buoy Stand Damaged To Be Renewed. Mat - Ms , 052 Life Saving Appliance (D) Firm To Replace With New Life Jacket Made As Per Solas/Irs/Mmd Standard (With Iso Certificate). Jacket To Be Fitted With Three Buckle With Adjustable Belt Whistle Attached With A Lynyard Reflective Tape 04 Nos , 052 Life Saving Appliance (E) Firm To Manufacture Bracket/ Securing Arrangemnt For Hru And Sling Fitment Of Liferafts. , 053Misc Provision Of New Self Adhesive Photo Luminescent Stickers Imo Symbols & Safety Sign/Escape Route Sign. (150 Mm X 150Mm) . Firm To Provide Stickers As Per S Le , 054Chairschairs At Crew Mesh And Wheel House Damaged. Chairs To Be Renewed With Roller Wheel, Height Adjustable Type Chairs. Make - Damro/Neel Kamal. , 055Kit Lockerskit Lockers Damaged Broken To Be Renewed. Mat- Crca(18 Gauge Sheet). Size - 48X48x180 Cm . , 056Fire Hydrantsfire Hydrants Defective/Broken To Be Renewed With Same Type Of Coupling. Mat- Ss , 057Deck Washing Machinefirm To Supply 01 In Nos Deck Washing Machine, Make - Pressure Jet System, Model - Px2150ir , 058Gangwaymanufacturing Of 5 Mtr Length Aluminium Gangway As Per S Le With Load Test Certificate. , 059Mob Markerfirm To Supply 02 In Nos Mob Marker As Per S Le. , 059Mob Marker Standfirm To Manufacture And Fitment 02 In Nos Mob Marker Stand. , 060Port Holerepair/ Renewal Of 05 In Nos Port Holes To Be Undertaken With Butterfly Nuts. Mat -Brass , 061Berthing Hawserberthing Hawser Damaged/Perished To Be Renewed. Mat - Pp Rope Size - 48 Mm , Length - 220 Mtr Each Set. , 1001 Diesel Generator,Make-Greaves,Model-3G11na, (T) Fuel Shut Off Solenoid Valve To Be Overhauled. , 1001 Diesel Generator,Make-Greaves,Model-3G11na, (U) Coolant Replinish Tank To Be Repaired/Fabricated , 1001 Diesel Generator,Make-Greaves,Model-3G11na (V) Post Completion Of Routine, Engine To Be Proved For Satisfactory Perfomance , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (W) Lub Oil Pressure Gauge.(Range - 0 To 4 Kg/Cm2) , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (X) Fresh Water Pressure Gauge.(Range - 0 To 4 Kg/Cm2) , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (Y) Ignition Switch With Key , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. (A) Dia 80 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. (B) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Domestic Fresh Water System/ Fire Hydrant System (C) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Domestic Fresh Water System/ Fire Hydrant System (D) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Fuel System E) Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (A) Dia 80 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (B) Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (C) Domestic Fresh Water System/ Fire Hydrant System Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (D) Domestic Fresh Water System/ Fire Hydrant System Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. E) Fuel Systemdia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (F) Fuel System Dia 25 Mm , 1004 Miscellaneous: (A) Exhaust Laging Of Dg Exhaust System To Be Renewed,Dia-50Mm , 1004 Miscellaneous: (B) Chemical Cleaning Of Exhaust System Of Dg(Dia-50Mm) , 1004 Miscellaneous: (C) Fuel Ru Tank & Storage Tank Level Indicator Sight Glass To Be Provisioned With New End Cocks/Fittings. , 1004 Miscellaneous: (D) Cleaning Of Fuel Storage Tank To Be Carried Out. , 1004 Miscellaneous: (E) Cleaning Of Ru Tank To Be Carried Out. , 1004 Miscellaneous: (F) Fuel System Hand Pump Overhauling To Be Carried Out. Hand Pump To Be Proved For Satisfactory Operation , 1004 Miscellaneous: (G) Cleaning Of Both Domestic Fresh Water Tank To Be Carried Out.Post Cleaning Paint To Be Applied. , 1004 Miscellaneous: (H) Overhauling Of Cable Drum Guide Mechanism To Be Undertaken. Roller & Chain Arrangement To Repaired And Bearings To Be Renewed.Track And Foundation To Be Sufficientely Strengthen. Operation Of Cable Drum Guide Mechanism To Be Proved For Satisfactory Performance. , 1005Water Leakage Observed From Roof Top Of The Generator Room. To Be Repaired For Preventing Water Leakage. Repair Job Also Includes Reneal Of Packing Of Soft Patch And Associated Fastenrs And Prove For Satsisfactory Of No Water Leakeage Post Repair. , 1006Generator Not Getting Starting View Defect In Control/ Mechanical Isues. (Model Sv Greaves 28Kw 1500Rpm 415V 3 Phase 50 Hz With 12V Battery). Complete Overhauling Of Generator To Be Undertaken And Prove For Satisfactory Operation. , 1007Oil Leakage Observed From Gear Box Cable Drum. Repair Of Gear Box Cable Drum To Be Carried Out. , Electrical Work Package2001 Diesel Alternator20kva,415V,3Ph,50Hz (A) Calibration And Overhauling Of Starter Motor Make Stm 1129 T, Rating 12 V, 2 Kw And Engine Electrical Starter (12V) To Be Overhauled. , 2001 Diesel Alternator28 Kva,415V,3Ph,50Hz (B) Callibration Of Electrical Control Panel & Engine Safety Unit To Be Carried Out. , 2001 Diesel Alternator20kva,415V,3Ph,50Hz (C) Oil Pressure Gauge (0-10 Bar), Water Pressure/ Temprature Gauge (40-120 C), Ammeter (-30 To +30) And Indicators To Be Callibrated , 2001 Diesel Alternator20kva,415V,3Ph,50Hz (D) Battery (12V,180 -Hr Capacity) To Be Renewed , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (A) 0-300 V Voltmeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (B) 0-500 V Voltmeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (C) 0-60 A Ammeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (C) 45-50-55 Frequency Meter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Change Over Switch To Be Replaced With New Switch. , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Indication L To Be Replaced With New L . , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (A) Windlass Motor To Be Overhauled And Prove For Satisfa Tory Performance , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (B) Windlass Control Panel: Make-Geeta Engg,Mumbai , Overhauling Of Control Panel To Be Carried Out. , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (C) Windlass Controller On Upper Deck To Be Overhauled. Controller Protection Cover (Weather Protection Box) To Be Fabricated. , 2004 Cable Drum Motors And Control System (A) Complete Overhauling Of Drum Motor To Be Undertaken And Prove For Satisfactory Operation Motor Type M24120 415V,3Ph,7Hp , 2004 Cable Drum Motors And Control System (B) Cable Drum Control Panel And Controller To Be Overhauled. (Cable Drum Control Panel Type:Cp-3 Make: Is Control System Limited, Kolkata) , 2004 Cable Drum Motors And Control System (C) Cable Drum Reduction Gear To Be Overhauled And Prove For Satisfactory Operation , 2004 Cable Drum Motors And Control System (D) Cable Drum Clutch To Be Repaired. , 2004 Cable Drum Motors And Control System (E) Cable Drum Gearing Mechanism Chain To Be Replaced With New Chain , 2005 Lighting Following Light Fittings Are Corroded And Holder Perished To Be Renewed With Weather Proof Equipment , 2005 Lighting Following Light Fittings And Holder To Be Repaired (A) Light Fittings In Anchor Chain Compartment , 2005 Lighting Following Light Fittings And Holder To Be Repaired (B) Led Reflectors On Upper Deck To Be Replaced. , 2005 Lighting Following Light Fittings And Holder To Be Repaired (C) Reflectors(Port And Stbd) On Roof Top To Renewed. , 2005 Lighting Following Light Fittings And Holder To Be Repaired (D) Navigational Lights I.E. Mast Head, Stern And Bow Lights Light Fittings Corroded, To Be Replaced With New , 2006Battery(A) Serviceability Checks Of 12V X 2 Batteries To Be Carried Out , 2006 Battery (B) Battery Charger To Be Repaired Capacity 12V,8 S , 2006 Battery (C) New Battery Charger To Be Provisioned Capacity 12V,8 S , 2006 Battery (D) New Batteries (12V , 180 Ah) To Be Provided . , 2007 Transformer Transfer To Be Overhauled. Transformer12 Kva, 415/230V : , 2008 Shore Supply Connection Box Shore Supply Connection Box To Be Fabricated. Shore Supply Connection Box 415 V, 3Ph Make: Switch Control Gear Mumbai. Size (2 X 2.5 X 3 Feet) : , 2009 Battery Rack Battery Rack For Stowing Da Starting Batteries To Be Factricated , 2010Flood Lights Defective. (Reflactors Model- Strulite 230V 150W Ip66) Replacment Of Flood Lights To Be Carried Out. , 2011Routines On Cable Drum Required View Rusting Of Drums. Anti Corrosive Paint To Be Applied On All Cable Drum. , 2012Mast Head / Hazard Light Defective. (Tungsten Filament Bulb 230V 40W) Replacement Of Mast Head/ Hzard Light To Be Carried Out. , 2013Weather Deck Light Defective. (Tungsten Filament Bulb 230V 60W) Replacement Of Deck Light To Be Carried Out. , 2014Light Fittings Defective. (As Per S Le) Replacement Of Light Fittings To Be Carried Out. , 2015Exhaust Fan Defective. (Model - Seiecho 230V 2400 Rpm) Replacement Of Fan To Be Carried Out. , 2016Tube Light Fitting Defective. (Philips Pl-L 36W/865/4P 6A) Replacement Of Tube Light To Be Carried Out. , Sparesl 230V ,100W

BOQ

Sl. No. Item TitleItem Description
1001 Docking- Vessel to be docked in both versions.Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises [i.e ND(V)/slipway]. Last docking - 12 Dec 23001 Docking- Vessel to be docked in both versions.Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises [i.e ND(V)/slipway]. Last docking - 12 Dec 23
2002Hull CleaningUnder Water, Boot Top Area, Shipside, above water,Weather Deck and Super Structure.(a) jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/ barnacles and present for survey.002Hull CleaningUnder Water, Boot Top Area, Shipside, above water,Weather Deck and Super Structure.(a) jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/ barnacles and present for survey.
3002Hull CleaningTanks(b) Manually clean all internal tanks. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. Qty 06 Nos002Hull CleaningTanks(b) Manually clean all internal tanks. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. Qty 06 Nos
4003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull including boot top area, above water hull, super structure, all internal compartments weather decks including deck fittings(i.e. bollards. cable reel anchor windlass foundation ) Firm to submit 04 copies of Hull survey report .003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull including boot top area, above water hull, super structure, all internal compartments weather decks including deck fittings(i.e. bollards. cable reel anchor windlass foundation ) Firm to submit 04 copies of Hull survey report .
5004UTG SurveyCarry out UTG survey in the presence of QC representatives of U/W hull, Internal Tanks and weather deck and wherever recquired ie.superstructure,above water hull, tank top etc.as directed by survey team. Firm to submit 04 copies of Hull survey report.004UTG SurveyCarry out UTG survey in the presence of QC representatives of U/W hull, Internal Tanks and weather deck and wherever recquired ie.superstructure,above water hull, tank top etc.as directed by survey team. Firm to submit 04 copies of Hull survey report.
6005Steel RenewalsQuote for steel renewal at various locations as per survey reportNote 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.005Steel RenewalsQuote for steel renewal at various locations as per survey reportNote 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
7006 Build ups Carry out build ups as indicated by the Hull survey team/ RMT (a) 25 x 25 mm006 Build ups Carry out build ups as indicated by the Hull survey team/ RMT (a) 25 x 25 mm
8006Build ups(b) Carry out build ups as indicated by the Hull survey team/ RMT (b) 50x50 mm006Build ups(b) Carry out build ups as indicated by the Hull survey team/ RMT (b) 50x50 mm
9007Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor007Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
10008Re-welding runCarry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.008Re-welding runCarry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
11009 Draught MarksDraught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted all Draught marks.009 Draught MarksDraught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted all Draught marks.
12010 Sacrificial Anodes(a) Renew MK - II sacrificial anodes which are perished over 50%.Note:- Anodes will be supplied by Firm.010 Sacrificial Anodes(a) Renew MK - II sacrificial anodes which are perished over 50%.Note:- Anodes will be supplied by Firm.
13010 Sacrificial Anodes (b) Renew MK - III sacrificial anodes which are perished over 50%. Note:- Note:- Anodes will be supplied by Firm.010 Sacrificial Anodes (b) Renew MK - III sacrificial anodes which are perished over 50%. Note:- Note:- Anodes will be supplied by Firm.
14011 Surface preparation Under Water area including Boot top area with Grit Blasting (a) Grit blasting to SA 2.5 standard to be carried out on complete UW area including boot top for renewal of paint as per NO-53/16.011 Surface preparation Under Water area including Boot top area with Grit Blasting (a) Grit blasting to SA 2.5 standard to be carried out on complete UW area including boot top for renewal of paint as per NO-53/16.
15011 Surface preparation Under Water area including Boot top area with Grit Blasting (a) Swveep blasting SA1 to be carried out on complete UW area including boot top for renewal of paint as per NO-53/16.011 Surface preparation Under Water area including Boot top area with Grit Blasting (a) Swveep blasting SA1 to be carried out on complete UW area including boot top for renewal of paint as per NO-53/16.
16012 Painting - Jotun SchemeUnder Water area including Boot top area Under Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns012 Painting - Jotun SchemeUnder Water area including Boot top area Under Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
17012 Painting - Jotun SchemeUnder Water area including Boot top area Under Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns012 Painting - Jotun SchemeUnder Water area including Boot top area Under Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
18012 Painting - Jotun SchemeUnder Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns012 Painting - Jotun SchemeUnder Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
19012 Painting - Jotun Scheme Under Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns012 Painting - Jotun Scheme Under Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
20012 Painting - Jotun SchemeUnder Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT012 Painting - Jotun SchemeUnder Water area including Boot top areaUnder Water area including Boot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT
21012 Painting - Jotun SchemeUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT012 Painting - Jotun SchemeUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT
22012 Painting - Jotun SchemeBoot top areaBoot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Black)-1x150 microns DFT012 Painting - Jotun SchemeBoot top areaBoot top area to be painted with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Black)-1x150 microns DFT
23013Surface Preparation Above Water Area (a) Carry out grit blasting to SA 2.5 standard for application of new paint.013Surface Preparation Above Water Area (a) Carry out grit blasting to SA 2.5 standard for application of new paint.
24013Surface Preparation Above Water Area (a) Carry out grit blasting to SA1standard for application of new paint.013Surface Preparation Above Water Area (a) Carry out grit blasting to SA1standard for application of new paint.
25014 Painting - JOTUN Scheme.Above Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT014 Painting - JOTUN Scheme.Above Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
26014 Painting - JOTUN Scheme. Above Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT014 Painting - JOTUN Scheme. Above Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
27014 Painting - JOTUN SchemeAbove Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT014 Painting - JOTUN SchemeAbove Water Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT
28014 Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP RAL 7040 (Grey) - 60 microns DFT014 Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP RAL 7040 (Grey) - 60 microns DFT
29013Surface Preparation Super structure(a) Carry out powertooling ST3standard for application of new paint.013Surface Preparation Super structure(a) Carry out powertooling ST3standard for application of new paint.
30013Surface Preparation Super structure(a) Carry out Power tooling ST1 standard for application of new paint.013Surface Preparation Super structure(a) Carry out Power tooling ST1 standard for application of new paint.
31014 Painting - JOTUN Scheme.Super Structure Area Paint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT014 Painting - JOTUN Scheme.Super Structure Area Paint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
32014 Painting - JOTUN Scheme. Super Structure Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80(Grey/ Red Brown) - 125 microns DFT014 Painting - JOTUN Scheme. Super Structure Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80(Grey/ Red Brown) - 125 microns DFT
33014 Painting - JOTUN SchemeSuper Structure Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: RAL9010 (White) - 125 microns DFT014 Painting - JOTUN SchemeSuper Structure Area and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: RAL9010 (White) - 125 microns DFT
34014 Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: RAL 9010(White) - 60 microns DFT014 Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: RAL 9010(White) - 60 microns DFT
35015 Surface Preparation Weather Decks and Bridge Top Carry out Hydrojet ballasting to WJ 2.5 standard on weather deck and bridge top.015 Surface Preparation Weather Decks and Bridge Top Carry out Hydrojet ballasting to WJ 2.5 standard on weather deck and bridge top.
36016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
37016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotacote Universal N10 (Aluminium)- 2X150 microns016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotacote Universal N10 (Aluminium)- 2X150 microns
38016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Non Slip Epoxy D.A. Grey with hardner (HDNS)- 2X250 Microns016 Painting - JOTUN Scheme Weather Decks and Bridge Top Painting of weather decks and bridge top to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Non Slip Epoxy D.A. Grey with hardner (HDNS)- 2X250 Microns
39017 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.017 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
40018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(a) 1st Coat: primer - Penguard Primer -50 microns DFT018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(a) 1st Coat: primer - Penguard Primer -50 microns DFT
41018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
42018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3nd Coat: Anticorrosive Balloxy (HB light) - 150 microns018Painting - JOTUN SchemeInternal TanksPainting of internal tanks to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
43020NWT Doors(a) NWT Wooden door broken, to be renewed including Door frame/ coaming, hinges , door stopper,and mortise lockes.(Godrej)020NWT Doors(a) NWT Wooden door broken, to be renewed including Door frame/ coaming, hinges , door stopper,and mortise lockes.(Godrej)
44020NWT Doors(b) NWT Wooden door broken, to be repaired. Repair job also includs Door frame/ coaming, hinges , door stopper, mortise lockes renewel.(Godrej)020NWT Doors(b) NWT Wooden door broken, to be repaired. Repair job also includs Door frame/ coaming, hinges , door stopper, mortise lockes renewel.(Godrej)
45021Sky LightsWater leakage observed from sky light. Rubber beading and B/F Nut / T bolts of sky light to be renewed. Post renewel of rubber beading chalk test to be undertaken.021Sky LightsWater leakage observed from sky light. Rubber beading and B/F Nut / T bolts of sky light to be renewed. Post renewel of rubber beading chalk test to be undertaken.
46022Cable reel(a) Overhaulling of Cable guide roller assembly including gear box and driving chain assembly to carried out. Clean rust , grease , oil and apply new grease.022Cable reel(a) Overhaulling of Cable guide roller assembly including gear box and driving chain assembly to carried out. Clean rust , grease , oil and apply new grease.
47022Cable Reel(b) Oil leakage observed gear box assemble. Oil seal and drain plug to be renewed.022Cable Reel(b) Oil leakage observed gear box assemble. Oil seal and drain plug to be renewed.
48023Cable Reel(c) Overhaulling of manual operating machenism of Cable Reel to be carried out.Note: trials to be conducted post overhaulling in presence of QC.023Cable Reel(c) Overhaulling of manual operating machenism of Cable Reel to be carried out.Note: trials to be conducted post overhaulling in presence of QC.
49023Cable Reel(d) Cable reel drum and its foundation corroded/thinned. Visual and hammer survey to be carried out. Repair/renewel to be undertaken as per survey report.023Cable Reel(d) Cable reel drum and its foundation corroded/thinned. Visual and hammer survey to be carried out. Repair/renewel to be undertaken as per survey report.
50024Gauardrail and Stanchions(a) Fixed guardrail stanchions and pipes damaged/ broken to be renewed.Pipe Dia - 2 inch024Gauardrail and Stanchions(a) Fixed guardrail stanchions and pipes damaged/ broken to be renewed.Pipe Dia - 2 inch
51024Gauardrail and Stanchions(b) Fixed guardrail MS rod damaged/ broken to be renewed.Rod Dia - 1 inch024Gauardrail and Stanchions(b) Fixed guardrail MS rod damaged/ broken to be renewed.Rod Dia - 1 inch
52024Gauardrail and Stanchions(c) Guardrails Securing chain damaged/ broken to be renewed. Size - 8 mm , Mat - MS024Gauardrail and Stanchions(c) Guardrails Securing chain damaged/ broken to be renewed. Size - 8 mm , Mat - MS
53024Gauardrail and Stanchions(d) D- Shackles for guardrails Securing chain damaged/ broken to be renewed. Mat - MS024Gauardrail and Stanchions(d) D- Shackles for guardrails Securing chain damaged/ broken to be renewed. Mat - MS
54025WT HatchButterfly nut demaged/broken to be renewed as per sample. Mat- SS025WT HatchButterfly nut demaged/broken to be renewed as per sample. Mat- SS
55025WT HatchOverhauling of WT Hatch including clips to be undertaken(04 Clips).025WT HatchOverhauling of WT Hatch including clips to be undertaken(04 Clips).
56026WT DoorOverhauling of WT Door including clips to be undertaken(06 Clips).026WT DoorOverhauling of WT Door including clips to be undertaken(06 Clips).
57027Rubber BeadingRenewal of rubber beading of WT doors and WT hatches.Note: post renewal of rubber beading Chalk Test to be prooved027Rubber BeadingRenewal of rubber beading of WT doors and WT hatches.Note: post renewal of rubber beading Chalk Test to be prooved
58028Furniture(a) Wooden Panelling with Sunmica at various location damaged, to be renewed.028Furniture(a) Wooden Panelling with Sunmica at various location damaged, to be renewed.
59028Furniture(a) Fitment of plywood for 04 bunks to be renewed.028Furniture(a) Fitment of plywood for 04 bunks to be renewed.
60028Furniture(a) Firm to supply o4 in MATTRESS028Furniture(a) Firm to supply o4 in MATTRESS
61029MFMB LaggingMFMB lagging perished at various location, to be renewed.029MFMB LaggingMFMB lagging perished at various location, to be renewed.
62030Breather/ vent pipe(a) Vent pipes of various on upper deck corroded,Thinned and holed to be renewed.030Breather/ vent pipe(a) Vent pipes of various on upper deck corroded,Thinned and holed to be renewed.
63030Breather/ vent pipe(a) Breather head corroded/damaged. Breather head to be renewed along with wiremess and rubber seal.030Breather/ vent pipe(a) Breather head corroded/damaged. Breather head to be renewed along with wiremess and rubber seal.
64030Breather/ vent pipe(b) Vent pipe (Goose neck type) corroded/damaged. Vent pipe including cap,butterfly nut to be renewed. Size - 50mm030Breather/ vent pipe(b) Vent pipe (Goose neck type) corroded/damaged. Vent pipe including cap,butterfly nut to be renewed. Size - 50mm
65031Wire MessWiremess for mushroom head damaged to be renewed.031Wire MessWiremess for mushroom head damaged to be renewed.
66031Linoleum SheetLinoleum sheet to be renewed.031Linoleum SheetLinoleum sheet to be renewed.
67031Sliding Window & Fixed windowSlinding glass & Fixed glassof window jammed/damaged. Window glass alongwith locking clip to be renewed.031Sliding Window & Fixed windowSlinding glass & Fixed glassof window jammed/damaged. Window glass alongwith locking clip to be renewed.
68032 Bollards Single bollards (a) Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.(i) Vertical pipe size: dia-12\\", Height- 1.4 Mtr (ii) Cross arm pipe size - dia 150mm , Length - 800 mm032 Bollards Single bollards (a) Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.(i) Vertical pipe size: dia-12\\", Height- 1.4 Mtr (ii) Cross arm pipe size - dia 150mm , Length - 800 mm
69032 Bollards Single bollards (a) Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.(i) Vertical pipe size: dia-12\\", Height- 1.4 Mtr (ii) Cross arm pipe size - dia 150mm , Length - 800 mm032 Bollards Single bollards (a) Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.(i) Vertical pipe size: dia-12\\", Height- 1.4 Mtr (ii) Cross arm pipe size - dia 150mm , Length - 800 mm
70033 Bollards Twin bollards (a) Twin Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.Size : foundation size 700X350 MM, pipe dia 250MM033 Bollards Twin bollards (a) Twin Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.Size : foundation size 700X350 MM, pipe dia 250MM
71033 Bollards Twin bollards (b) twin Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.Size : foundation size 700X350 MM, Dia 250MM033 Bollards Twin bollards (b) twin Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Firm to undertake load test and provide certificate post repair/ renewal.Size : foundation size 700X350 MM, Dia 250MM
72034Anchor windlassOverhauling of anchor windlass to be carried out. Overhauling invlove removel of drum, gear box and brake linings and clean rust, grease of all component. Post overhauling refit and prove for satisfactory operation.034Anchor windlassOverhauling of anchor windlass to be carried out. Overhauling invlove removel of drum, gear box and brake linings and clean rust, grease of all component. Post overhauling refit and prove for satisfactory operation.
73035Guide RollerGuide Roller of chain cable jammed to be Overhauled and prove for free movment.035Guide RollerGuide Roller of chain cable jammed to be Overhauled and prove for free movment.
74036D SHAPED FENDERS (a) Remove all D shaped fenders for survey of C channels and necessary repairs is to be attended on securing channels including nut and bolts. Post repair of C channels fenders is to be fitted036D SHAPED FENDERS (a) Remove all D shaped fenders for survey of C channels and necessary repairs is to be attended on securing channels including nut and bolts. Post repair of C channels fenders is to be fitted
75036 D SHAPED FENDERS (b) D shaped fenders damaged/perished to be renewed.Specification - EPDM rubber as per NES 170. colour blackSize on fender 1500x 200 mm and ID 75 mm.Note- Quote for material036 D SHAPED FENDERS (b) D shaped fenders damaged/perished to be renewed.Specification - EPDM rubber as per NES 170. colour blackSize on fender 1500x 200 mm and ID 75 mm.Note- Quote for material
76036D shaped fenders securing arrangement nut and bolts (c) Fender securing arrangement i.e nut and bolts corroded/thinned , to be renewed for securing of D fenders around ship side.Size: N24 size nut bolt , Mat - SS036D shaped fenders securing arrangement nut and bolts (c) Fender securing arrangement i.e nut and bolts corroded/thinned , to be renewed for securing of D fenders around ship side.Size: N24 size nut bolt , Mat - SS
77037 Surface Preparation Fresh Water Tanks (02 Nos)(a) Carry out mechanical cleaning to ST3 standard for paint application.037 Surface Preparation Fresh Water Tanks (02 Nos)(a) Carry out mechanical cleaning to ST3 standard for paint application.
78038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT
79038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB(Grey) -100 microns DFT038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB(Grey) -100 microns DFT
80038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Penguard HB (white) -100 microns DFT038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Penguard HB (white) -100 microns DFT
81039 Manhole Cover (a) Manhole cover of various tanks corroded/thinned, to be renewed .039 Manhole Cover (a) Manhole cover of various tanks corroded/thinned, to be renewed .
82039 Manhole Cover (b) Nut and Bolts of Manhole cover to be renewed as. Mat-SS039 Manhole Cover (b) Nut and Bolts of Manhole cover to be renewed as. Mat-SS
83039 Manhole Cover (c) Rubber Joints of manhole cover to be renewed.039 Manhole Cover (c) Rubber Joints of manhole cover to be renewed.
84040 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0006 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank040 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0006 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
85041 Surface Preparation Internal Compartment(a) Carry out mechanical cleaning to ST3 standard for paint application.041 Surface Preparation Internal Compartment(a) Carry out mechanical cleaning to ST3 standard for paint application.
86042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns DFT042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns DFT
87042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80 (Grey) -150 microns DFT042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80 (Grey) -150 microns DFT
88042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Middle burnswick green finishing paint -100 microns DFT042 Painting - JOTUN Scheme.Internal Compartment Deck painting of internal compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Middle burnswick green finishing paint -100 microns DFT
89043 Cable reels Cover (a) Manufacturing of water proof canvas cover for cable reels as per sample.Approx size for each cable reel - 15 Sqm043 Cable reels Cover (a) Manufacturing of water proof canvas cover for cable reels as per sample.Approx size for each cable reel - 15 Sqm
90043 Cable reels Cover (b) Manufacturing of water proof canvas cover for motors as per sample. Approx size for each Motor- 4 Sqm043 Cable reels Cover (b) Manufacturing of water proof canvas cover for motors as per sample. Approx size for each Motor- 4 Sqm
91044 Sanitry system (a) SS Wash basin, corroded to be renewed. (Mat- Ceramic, Make - CERA) Note:- Quoted repair cost shall include cost all items.044 Sanitry system (a) SS Wash basin, corroded to be renewed. (Mat- Ceramic, Make - CERA) Note:- Quoted repair cost shall include cost all items.
92044 Sanitry system (b) WC Commode in crew washroom damaged/corroded. W/C along with flush tank to be renewed (Mat- Ceramic, Make - CERA) Note:- Quoted repair cost shall include cost all items.044 Sanitry system (b) WC Commode in crew washroom damaged/corroded. W/C along with flush tank to be renewed (Mat- Ceramic, Make - CERA) Note:- Quoted repair cost shall include cost all items.
93044 Sanitry system (d) SS tap: 1/2 inch damaged to be renewed. Note:- Quoted repair cost shall include cost all items.044 Sanitry system (d) SS tap: 1/2 inch damaged to be renewed. Note:- Quoted repair cost shall include cost all items.
94044 Sanitry system (e) Fresh water supply pipes deformed/damaged to be renewed. Pipe to be connected with water tank and prove system satisfactory operation. Mat : PVC/ cu - ni Note:- Quoted repair cost shall include cost all items044 Sanitry system (e) Fresh water supply pipes deformed/damaged to be renewed. Pipe to be connected with water tank and prove system satisfactory operation. Mat : PVC/ cu - ni Note:- Quoted repair cost shall include cost all items
95044 Sanitry system (f) Drain pipe in crew bathroom and WC corroded pipe to be renewed. Mat-MS,dia- 2 inch044 Sanitry system (f) Drain pipe in crew bathroom and WC corroded pipe to be renewed. Mat-MS,dia- 2 inch
96044 Sanitry system (g) Mirror to be renewed (As per sample) Note:- Quoted repair cost shall include cost all items044 Sanitry system (g) Mirror to be renewed (As per sample) Note:- Quoted repair cost shall include cost all items
97044 Sanitry system (h) Shower head to be renewed (Cera make). Note:- Quoted repair cost shall include cost all items044 Sanitry system (h) Shower head to be renewed (Cera make). Note:- Quoted repair cost shall include cost all items
98044 Sanitry system (j) Health faucet damaged/broken in crew WC to be renewed. Note:- Quoted repair cost shall include cost all items044 Sanitry system (j) Health faucet damaged/broken in crew WC to be renewed. Note:- Quoted repair cost shall include cost all items
99044 Sanitry system (k) Flush valve damaged/broken in crew WC to be renewed. Note:- Quoted repair cost shall include cost all items044 Sanitry system (k) Flush valve damaged/broken in crew WC to be renewed. Note:- Quoted repair cost shall include cost all items
100045 Extinguishers firm to supply fire fighting equipment's (a) 9 Ltr AFFF extinguisher045 Extinguishers firm to supply fire fighting equipment's (a) 9 Ltr AFFF extinguisher
101045 Extinguishers firm to supply fire fighting equipment's Provision of following extinguishers to be undertaken (b) 2 Kg CO2 Extinguisher045 Extinguishers firm to supply fire fighting equipment's Provision of following extinguishers to be undertaken (b) 2 Kg CO2 Extinguisher
102045 Extinguishers firm to supply fire fighting equipment's Provision of following extinguishers to be undertaken (c) 10 Kg DCP extinguisher045 Extinguishers firm to supply fire fighting equipment's Provision of following extinguishers to be undertaken (c) 10 Kg DCP extinguisher
103045 FF items (d) Provision of following fire hoses to be undertaken - Fire hoses length 15 Mtr with end coupling of Brass045 FF items (d) Provision of following fire hoses to be undertaken - Fire hoses length 15 Mtr with end coupling of Brass
104045 FF items (e) Fire hose box to be renewed at various location.045 FF items (e) Fire hose box to be renewed at various location.
105045 FF items (f) Extinguisher securing arrangement of CO2 , AFFF , DCP extinguisher to be made at various location. Mat - Ms045 FF items (f) Extinguisher securing arrangement of CO2 , AFFF , DCP extinguisher to be made at various location. Mat - Ms
106045 FF items (g) Firm to empty foam tank. Old foam solution to be taken out and disposed as per exiting guidelines.045 FF items (g) Firm to empty foam tank. Old foam solution to be taken out and disposed as per exiting guidelines.
107045 FF items (h) Firm to supply foam solution AFFF (3% concentration) and foam to be filled onboard craft.045 FF items (h) Firm to supply foam solution AFFF (3% concentration) and foam to be filled onboard craft.
108046DC BAGDC bag torn/damaged. Firm to supply new DC bag with following DC containt(i) Adjustable - 01 Nos(ii) Jubli clips - 05 Nos(iii) Soft wood wadges - 15 Nos(iv) Occam - 1 Kg(v) Spanners - 5 nos(vi) Multi purpose band -03 Nos(vii) Stopper plate/Stopper pad - 02 Nos046DC BAGDC bag torn/damaged. Firm to supply new DC bag with following DC containt(i) Adjustable - 01 Nos(ii) Jubli clips - 05 Nos(iii) Soft wood wadges - 15 Nos(iv) Occam - 1 Kg(v) Spanners - 5 nos(vi) Multi purpose band -03 Nos(vii) Stopper plate/Stopper pad - 02 Nos
109047DC Torch(a) DC torch non-ops / BER . To be renwed as per sample.047DC Torch(a) DC torch non-ops / BER . To be renwed as per sample.
110047DC Torch(b) Serveciability checks of DC torch battries to be carried out. Defective battries to be renewed.047DC Torch(b) Serveciability checks of DC torch battries to be carried out. Defective battries to be renewed.
111048KEY SECURING BOARDKey hanging board damaged/broken to be renewed as per sampleMat- Wooden048KEY SECURING BOARDKey hanging board damaged/broken to be renewed as per sampleMat- Wooden
112049BASCCABascca set i.a.w extant naval policies be provisioned for firefighting. Make - Dragger or Santurian. Capacity 300 Bar049BASCCABascca set i.a.w extant naval policies be provisioned for firefighting. Make - Dragger or Santurian. Capacity 300 Bar
113050Fire SuitFire Suit with gloves and boot i.a.w extant naval policies to be provisioned for firefighting. As per sample.050Fire SuitFire Suit with gloves and boot i.a.w extant naval policies to be provisioned for firefighting. As per sample.
114051 Panelling SS panelling at indicated locations damaged to be renewed.051 Panelling SS panelling at indicated locations damaged to be renewed.
115052 Life Saving Appliance (a) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip and Hanger) including Hydrostatic release Unit (HRU Hammer H20 R).052 Life Saving Appliance (a) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip and Hanger) including Hydrostatic release Unit (HRU Hammer H20 R).
116052 Life Saving Appliance (b) Firm to new life buoy (Tug Name to be indicated)052 Life Saving Appliance (b) Firm to new life buoy (Tug Name to be indicated)
117052 Life Saving Appliance (c) Life buoy stand damaged to be renewed. Mat - MS052 Life Saving Appliance (c) Life buoy stand damaged to be renewed. Mat - MS
118052 Life Saving Appliance (d) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lynyard reflective tape 04 nos052 Life Saving Appliance (d) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lynyard reflective tape 04 nos
119052 Life Saving Appliance (e) Firm to manufacture bracket/ securing arrangemnt for HRU and sling fitment of liferafts.052 Life Saving Appliance (e) Firm to manufacture bracket/ securing arrangemnt for HRU and sling fitment of liferafts.
120053Misc Provision of new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 150mm) . Firm to provide stickers as per sample053Misc Provision of new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 150mm) . Firm to provide stickers as per sample
121054ChairsChairs at crew mesh and wheel house damaged. Chairs to be renewed with roller wheel, height adjustable type chairs. Make - Damro/Neel kamal.054ChairsChairs at crew mesh and wheel house damaged. Chairs to be renewed with roller wheel, height adjustable type chairs. Make - Damro/Neel kamal.
122055Kit LockersKit lockers damaged broken to be renewed. Mat- CRCA(18 Gauge sheet). Size - 48x48x180 cm .055Kit LockersKit lockers damaged broken to be renewed. Mat- CRCA(18 Gauge sheet). Size - 48x48x180 cm .
123056Fire HydrantsFire hydrants defective/broken to be renewed with same type of coupling. Mat- SS056Fire HydrantsFire hydrants defective/broken to be renewed with same type of coupling. Mat- SS
124057Deck Washing MachineFirm to supply 01 in nos deck washing machine, Make - Pressure jet system, model - PX2150IR057Deck Washing MachineFirm to supply 01 in nos deck washing machine, Make - Pressure jet system, model - PX2150IR
125058GangwayManufacturing of 5 mtr length Aluminium gangway as per sample with load test certificate.058GangwayManufacturing of 5 mtr length Aluminium gangway as per sample with load test certificate.
126059MOB MarkerFirm to supply 02 in nos MOB Marker as per sample.059MOB MarkerFirm to supply 02 in nos MOB Marker as per sample.
127059MOB Marker StandFirm to Manufacture and fitment 02 in nos MOB Marker stand.059MOB Marker StandFirm to Manufacture and fitment 02 in nos MOB Marker stand.
128060Port HoleRepair/ renewal of 05 in nos port holes to be undertaken with butterfly nuts. Mat -Brass060Port HoleRepair/ renewal of 05 in nos port holes to be undertaken with butterfly nuts. Mat -Brass
129061Berthing HawserBerthing hawser damaged/perished to be renewed. Mat - PP rope Size - 48 mm , Length - 220 mtr each set.061Berthing HawserBerthing hawser damaged/perished to be renewed. Mat - PP rope Size - 48 mm , Length - 220 mtr each set.
1301001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (t) Fuel shut off solenoid valve to be overhauled.1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (t) Fuel shut off solenoid valve to be overhauled.
1311001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (u) Coolant replinish tank to be repaired/fabricated1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (u) Coolant replinish tank to be repaired/fabricated
1321001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA (v) Post completion of routine, engine to be proved for satisfactory perfomance1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA (v) Post completion of routine, engine to be proved for satisfactory perfomance
1331001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (w) Lub oil pressure gauge.(Range - 0 to 4 kg/cm2)1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (w) Lub oil pressure gauge.(Range - 0 to 4 kg/cm2)
1341001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (x) Fresh water pressure gauge.(Range - 0 to 4 kg/cm2)1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (x) Fresh water pressure gauge.(Range - 0 to 4 kg/cm2)
1351001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (y) Ignition switch with key1001 DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, Following gauges of DG control panel to be renewed (y) Ignition switch with key
1361002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure.1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure.
1371002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm
1381002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm
1391002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (c) Dia 50 mm1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (c) Dia 50 mm
1401002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (d) Dia 50 mm1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (d) Dia 50 mm
1411002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Fuel System e) Dia 50 mm1002 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Fuel System e) Dia 50 mm
1421003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure.1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure.
1431003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm
1441003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm
1451003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (c) Domestic fresh water system/ fire hydrant system Dia 50 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (c) Domestic fresh water system/ fire hydrant system Dia 50 mm
1461003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (d) Domestic fresh water system/ fire hydrant system Dia 50 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (d) Domestic fresh water system/ fire hydrant system Dia 50 mm
1471003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. e) Fuel systemDia 50 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. e) Fuel systemDia 50 mm
1481003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (f) Fuel system Dia 25 mm1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (f) Fuel system Dia 25 mm
1491004 MISCELLANEOUS: (a) Exhaust laging of DG exhaust system to be renewed,Dia-50mm1004 MISCELLANEOUS: (a) Exhaust laging of DG exhaust system to be renewed,Dia-50mm
1501004 MISCELLANEOUS: (b) Chemical cleaning of exhaust system of DG(Dia-50mm)1004 MISCELLANEOUS: (b) Chemical cleaning of exhaust system of DG(Dia-50mm)
1511004 MISCELLANEOUS: (c) Fuel RU tank & storage tank level indicator sight glass to be provisioned with new end cocks/fittings.1004 MISCELLANEOUS: (c) Fuel RU tank & storage tank level indicator sight glass to be provisioned with new end cocks/fittings.
1521004 MISCELLANEOUS: (d) Cleaning of fuel storage tank to be carried out.1004 MISCELLANEOUS: (d) Cleaning of fuel storage tank to be carried out.
1531004 MISCELLANEOUS: (e) Cleaning of RU tank to be carried out.1004 MISCELLANEOUS: (e) Cleaning of RU tank to be carried out.
1541004 MISCELLANEOUS: (f) Fuel system hand pump overhauling to be carried out. Hand pump to be proved for satisfactory operation1004 MISCELLANEOUS: (f) Fuel system hand pump overhauling to be carried out. Hand pump to be proved for satisfactory operation
1551004 MISCELLANEOUS: (g) Cleaning of both domestic fresh water tank to be carried out.Post cleaning paint to be applied.1004 MISCELLANEOUS: (g) Cleaning of both domestic fresh water tank to be carried out.Post cleaning paint to be applied.
1561004 MISCELLANEOUS: (h) Overhauling of Cable drum guide mechanism to be undertaken. Roller & Chain arrangement to repaired and bearings to be renewed.Track and foundation to be sufficientely strengthen. Operation of Cable drum guide mechanism to be proved for satisfactory performance.1004 MISCELLANEOUS: (h) Overhauling of Cable drum guide mechanism to be undertaken. Roller & Chain arrangement to repaired and bearings to be renewed.Track and foundation to be sufficientely strengthen. Operation of Cable drum guide mechanism to be proved for satisfactory performance.
1571005Water leakage observed from roof top of the generator room. To be repaired for preventing water leakage. Repair job also includes reneal of packing of soft patch and associated fastenrs and prove for satsisfactory of no water leakeage post repair.1005Water leakage observed from roof top of the generator room. To be repaired for preventing water leakage. Repair job also includes reneal of packing of soft patch and associated fastenrs and prove for satsisfactory of no water leakeage post repair.
1581006Generator not getting starting view defect in Control/ mechanical isues. (Model SV GREAVES 28KW 1500RPM 415V 3 PHASE 50 HZ WITH 12V BATTERY). Complete overhauling of generator to be undertaken and prove for satisfactory operation.1006Generator not getting starting view defect in Control/ mechanical isues. (Model SV GREAVES 28KW 1500RPM 415V 3 PHASE 50 HZ WITH 12V BATTERY). Complete overhauling of generator to be undertaken and prove for satisfactory operation.
1591007Oil leakage observed from gear box cable drum. Repair of gear box cable drum to be carried out.1007Oil leakage observed from gear box cable drum. Repair of gear box cable drum to be carried out.
160Electrical Work Package2001 Diesel Alternator20KVA,415V,3PH,50HZ (a) Calibration and overhauling of starter motor make STM 1129 T, rating 12 V, 2 KW and Engine electrical starter (12V) to be overhauled.Electrical Work Package2001 Diesel Alternator20KVA,415V,3PH,50HZ (a) Calibration and overhauling of starter motor make STM 1129 T, rating 12 V, 2 KW and Engine electrical starter (12V) to be overhauled.
1612001 Diesel Alternator28 KVA,415V,3PH,50HZ (b) Callibration of Electrical Control Panel & Engine safety unit to be carried out.2001 Diesel Alternator28 KVA,415V,3PH,50HZ (b) Callibration of Electrical Control Panel & Engine safety unit to be carried out.
1622001 Diesel Alternator20KVA,415V,3PH,50HZ (c) Oil Pressure Gauge (0-10 bar), Water Pressure/ Temprature gauge (40-120 c), Ammeter (-30 to +30) and indicators to be callibrated2001 Diesel Alternator20KVA,415V,3PH,50HZ (c) Oil Pressure Gauge (0-10 bar), Water Pressure/ Temprature gauge (40-120 c), Ammeter (-30 to +30) and indicators to be callibrated
1632001 Diesel Alternator20KVA,415V,3PH,50HZ (d) Battery (12V,180 Amp-Hr capacity) to be renewed2001 Diesel Alternator20KVA,415V,3PH,50HZ (d) Battery (12V,180 Amp-Hr capacity) to be renewed
1642002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (a) 0-300 V Voltmeter2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (a) 0-300 V Voltmeter
1652002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (b) 0-500 V Voltmeter2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (b) 0-500 V Voltmeter
1662002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (c) 0-60 A Ammeter2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (c) 0-60 A Ammeter
1672002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (c) 45-50-55 Frequency meter2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Calibrate the following Meters to be undertaken and calibration certificate to be rendered (c) 45-50-55 Frequency meter
1682002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Change over switch to be replaced with new switch.2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Change over switch to be replaced with new switch.
1692002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Indication Lamp to be replaced with new Lamp.2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch control Gear Indication Lamp to be replaced with new Lamp.
1702003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (a) Windlass motor to be overhauled and prove for satisfa tory performance2003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (a) Windlass motor to be overhauled and prove for satisfa tory performance
1712003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (b) Windlass control Panel: Make-Geeta Engg,Mumbai , Overhauling of Control Panel to be carried out.2003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (b) Windlass control Panel: Make-Geeta Engg,Mumbai , Overhauling of Control Panel to be carried out.
1722003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (c) Windlass Controller on upper deck to be overhauled. Controller protection cover (weather protection box) to be fabricated.2003 Windlass control System Windlass Motor (5Hp,415V,3Ph) (c) Windlass Controller on upper deck to be overhauled. Controller protection cover (weather protection box) to be fabricated.
1732004 Cable Drum Motors and Control System (a) Complete overhauling of Drum motor to be undertaken and prove for satisfactory operation Motor Type M24120 415V,3Ph,7HP2004 Cable Drum Motors and Control System (a) Complete overhauling of Drum motor to be undertaken and prove for satisfactory operation Motor Type M24120 415V,3Ph,7HP
1742004 Cable Drum Motors and Control System (b) Cable drum control panel and controller to be overhauled. (Cable Drum control panel Type:CP-3 Make: IS control system limited, Kolkata)2004 Cable Drum Motors and Control System (b) Cable drum control panel and controller to be overhauled. (Cable Drum control panel Type:CP-3 Make: IS control system limited, Kolkata)
1752004 Cable Drum Motors and Control System (c) Cable drum reduction gear to be overhauled and prove for satisfactory operation2004 Cable Drum Motors and Control System (c) Cable drum reduction gear to be overhauled and prove for satisfactory operation
1762004 Cable Drum Motors and Control System (d) Cable drum clutch to be repaired.2004 Cable Drum Motors and Control System (d) Cable drum clutch to be repaired.
1772004 Cable Drum Motors and Control System (e) Cable drum gearing mechanism chain to be replaced with new Chain2004 Cable Drum Motors and Control System (e) Cable drum gearing mechanism chain to be replaced with new Chain
1782005 Lighting Following light fittings are corroded and holder perished to be renewed with weather proof equipment2005 Lighting Following light fittings are corroded and holder perished to be renewed with weather proof equipment
1792005 Lighting Following light fittings and holder to be repaired (a) Light Fittings in Anchor Chain Compartment2005 Lighting Following light fittings and holder to be repaired (a) Light Fittings in Anchor Chain Compartment
1802005 Lighting Following light fittings and holder to be repaired (b) LED reflectors on upper deck to be replaced.2005 Lighting Following light fittings and holder to be repaired (b) LED reflectors on upper deck to be replaced.
1812005 Lighting Following light fittings and holder to be repaired (c) Reflectors(port and stbd) on roof top to renewed.2005 Lighting Following light fittings and holder to be repaired (c) Reflectors(port and stbd) on roof top to renewed.
1822005 Lighting Following light fittings and holder to be repaired (d) Navigational Lights i.e. Mast head, Stern and Bow lights light fittings corroded, to be replaced with new2005 Lighting Following light fittings and holder to be repaired (d) Navigational Lights i.e. Mast head, Stern and Bow lights light fittings corroded, to be replaced with new
1832006Battery(a) Serviceability checks of 12V X 2 batteries to be carried out2006Battery(a) Serviceability checks of 12V X 2 batteries to be carried out
1842006 Battery (b) Battery Charger to be repaired Capacity 12V,8Amps2006 Battery (b) Battery Charger to be repaired Capacity 12V,8Amps
1852006 Battery (c) New Battery Charger to be provisioned Capacity 12V,8Amps2006 Battery (c) New Battery Charger to be provisioned Capacity 12V,8Amps
1862006 Battery (d) New batteries (12V , 180 AH) to be provided .2006 Battery (d) New batteries (12V , 180 AH) to be provided .
1872007 Transformer Transfer to be overhauled. Transformer12 KVA, 415/230V :2007 Transformer Transfer to be overhauled. Transformer12 KVA, 415/230V :
1882008 Shore Supply connection box Shore supply connection Box to be Fabricated. Shore Supply connection box 415 V, 3Ph Make: Switch control gear Mumbai. size (2 x 2.5 x 3 feet) :2008 Shore Supply connection box Shore supply connection Box to be Fabricated. Shore Supply connection box 415 V, 3Ph Make: Switch control gear Mumbai. size (2 x 2.5 x 3 feet) :
1892009 Battery Rack Battery rack for stowing DA starting batteries to be factricated2009 Battery Rack Battery rack for stowing DA starting batteries to be factricated
1902010Flood lights defective. (REFLACTORS MODEL- STRULITE 230V 150W IP66) Replacment of flood lights to be carried out.2010Flood lights defective. (REFLACTORS MODEL- STRULITE 230V 150W IP66) Replacment of flood lights to be carried out.
1912011Routines on cable drum required view rusting of drums. Anti corrosive paint to be applied on all cable drum.2011Routines on cable drum required view rusting of drums. Anti corrosive paint to be applied on all cable drum.
1922012Mast Head / Hazard light defective. (Tungsten filament bulb 230V 40W) Replacement of Mast Head/ Hzard light to be carried out.2012Mast Head / Hazard light defective. (Tungsten filament bulb 230V 40W) Replacement of Mast Head/ Hzard light to be carried out.
1932013Weather Deck Light defective. (Tungsten filament bulb 230V 60W) Replacement of Deck light to be carried out.2013Weather Deck Light defective. (Tungsten filament bulb 230V 60W) Replacement of Deck light to be carried out.
1942014Light fittings defective. (As per sample) Replacement of light Fittings to be carried out.2014Light fittings defective. (As per sample) Replacement of light Fittings to be carried out.
1952015Exhaust fan defective. (Model - SEIECHO 230V 2400 RPM) Replacement of fan to be carried out.2015Exhaust fan defective. (Model - SEIECHO 230V 2400 RPM) Replacement of fan to be carried out.
1962016Tube light fitting defective. (PHILIPS PL-L 36W/865/4P 6A) Replacement of Tube light to be carried out.2016Tube light fitting defective. (PHILIPS PL-L 36W/865/4P 6A) Replacement of Tube light to be carried out.
197SPARESLamp 230v ,100wSPARESLamp 230v ,100w

AI Tender Summary

OUR REF NO 57618944
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 15-10-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair And Overhauling Service - Com/1018/Ml/Nr O/L-26/A Offloaded Refit Of Metal Lighter; Any Other Suitable Brand; Yes; Buyer Premises - 001 Docking- Vessel To Be Docked In Both Versions.Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises [I.E Nd(V)/Slipway]. Last Docking - 12 Dec 23 , 002Hull Cleaningunder Water, Boot Top Area, Shipside, Above Water,Weather Deck And Super Structure.(A) Jet Clean Entire Under Water Area And Boot Top Area (With A Pressure Not Exceeding 3000 Psi) Including Ship Side And Remove The Marine Growth/ Barnacles And Present For Survey. , 002Hull Cleaningtanks(B) Manually Clean All Internal Tanks. The Tanks Should Be Washed Out With Fresh Water And Soap Water To Remove Any Sediment Or Dirt Present In The Tank. Qty 06 Nos , 003 Hull Survey External And Internal Hull Survey. Carry Out Visual And Hammer Survey (In The Presence Of Qc Representatives) In Accordance With No 01/15 Of Under Water Hull Including Boot Top Area, Above Water Hull, Super Structure, All Internal Compartments Weather Decks Including Deck Fittings(I.E. Bollards. Cable Reel Anchor Windlass Foundation ) Firm To Submit 04 Copies Of Hull Survey Report . , 004Utg Surveycarry Out Utg Survey In The Presence Of Qc Representatives Of U/W Hull, Internal Tanks And Weather Deck And Wherever Recquired Ie.Superstructure,Above Water Hull, Tank Top Etc.As Directed By Survey Team. Firm To Submit 04 Copies Of Hull Survey Report. , 005Steel Renewalsquote For Steel Renewal At Various Locations As Per Survey Reportnote 1:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A Quality Ship Building Steel For Shell And Is 2062 Grade `B Quality Steel For Non Structural Works, Degutting/Regutting/ Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging/Panelling, Minor Fittings/ Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. , 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team/ Rmt (A) 25 X 25 Mm , 006Build Ups(B) Carry Out Build Ups As Indicated By The Hull Survey Team/ Rmt (B) 50X50 Mm , 007Fairing Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team/ Surveyor , 008Re-Welding Runcarry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team/ Qc/ Rmt. , 009 Draught Marksdraught Marks, Both Roman And Numeric, Corroded/Eaten Away. To Be Renewed And Painted All Draught Marks. , 010 Sacrificial Anodes(A) Renew Mk - Ii Sacrificial Anodes Which Are Perished Over 50%.Note:- Anodes Will Be Supplied By Firm. , 010 Sacrificial Anodes (B) Renew Mk - Iii Sacrificial Anodes Which Are Perished Over 50%. Note:- Note:- Anodes Will Be Supplied By Firm. , 011 Surface Preparation Under Water Area Including Boot Top Area With Grit Blasting (A) Grit Blasting To Sa 2.5 Standard To Be Carried Out On Complete Uw Area Including Boot Top For Renewal Of Paint As Per No-53/16. , 011 Surface Preparation Under Water Area Including Boot Top Area With Grit Blasting (A) Swveep Blasting Sa1 To Be Carried Out On Complete Uw Area Including Boot Top For Renewal Of Paint As Per No-53/16. , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Area Under Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Penguard Primer - 50 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Area Under Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Anti Corrosive - Jotacote Universal (Grey) - 150 Microns , 012 Painting - Jotun Scheme Under Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areaunder Water Area Including Boot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (E) 5Th Coat: A/F: Sea Quantum Pro U And Spectrum 150 Microns (Light Red/Dark Red) - 150 Microns Dft , 012 Painting - Jotun Schemeunder Water Area Including Boot Top Areapaint Under Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (F) 6Th Coat: A/F: Sea Quantum Pro U And Spectrum 150 Microns (Light Red/Dark Red) - 150 Microns Dft , 012 Painting - Jotun Schemeboot Top Areaboot Top Area To Be Painted With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (G) 7Th Coat: A/F: Seaquantum Ultra(Black)-1X150 Microns Dft , 013Surface Preparation Above Water Area (A) Carry Out Grit Blasting To Sa 2.5 Standard For Application Of New Paint. , 013Surface Preparation Above Water Area (A) Carry Out Grit Blasting To Sa1standard For Application Of New Paint. , 014 Painting - Jotun Scheme.Above Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer - 50 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic(Grey/ Red Brown) - 125 Microns Dft , 014 Painting - Jotun Schemeabove Water Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jotamastic(Grey) - 125 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area, Super Structure And Deck Fittings Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Hard Top Xp Ral 7040 (Grey) - 60 Microns Dft , 013Surface Preparation Super Structure(A) Carry Out Powertooling St3standard For Application Of New Paint. , 013Surface Preparation Super Structure(A) Carry Out Power Tooling St1 Standard For Application Of New Paint. , 014 Painting - Jotun Scheme.Super Structure Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer - 50 Microns Dft , 014 Painting - Jotun Scheme. Super Structure Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic 80(Grey/ Red Brown) - 125 Microns Dft , 014 Painting - Jotun Schemesuper Structure Area And Deck Fittingspaint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Ral9010 (White) - 125 Microns Dft , 014 Painting - Jotun Scheme. Above Water Area, Super Structure And Deck Fittings Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Ral 9010(White) - 60 Microns Dft , 015 Surface Preparation Weather Decks And Bridge Top Carry Out Hydrojet Ballasting To Wj 2.5 Standard On Weather Deck And Bridge Top. , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Penguard Primer -50 Microns Dft , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotacote Universal N10 (Aluminium)- 2X150 Microns , 016 Painting - Jotun Scheme Weather Decks And Bridge Top Painting Of Weather Decks And Bridge Top To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Non Slip Epoxy D.A. Grey With Hardner (Hdns)- 2X250 Microns , 017 Surface Preparation Internal Tanks Carry Out Mechanical Cleaning To St3 Standard As Per Survey Report Of Paint Oem For Paint Application. , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(A) 1St Coat: Primer - Penguard Primer -50 Microns Dft , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(B) 2Nd Coat: Anticorrosive Balloxy (Hb Light) - 150 Microns , 018Painting - Jotun Schemeinternal Tankspainting Of Internal Tanks To Be Carried Out With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.(C) 3Nd Coat: Anticorrosive Balloxy (Hb Light) - 150 Microns , 020Nwt Doors(A) Nwt Wooden Door Broken, To Be Renewed Including Door Frame/ Coaming, Hinges , Door Stopper,And Mortise Lockes.(Godrej) , 020Nwt Doors(B) Nwt Wooden Door Broken, To Be Repaired. Repair Job Also Includs Door Frame/ Coaming, Hinges , Door Stopper, Mortise Lockes Renewel.(Godrej) , 021Sky Lightswater Leakage Observed From Sky Light. Rubber Beading And B/F Nut / T Bolts Of Sky Light To Be Renewed. Post Renewel Of Rubber Beading Chalk Test To Be Undertaken. , 022Cable Reel(A) Overhaulling Of Cable Guide Roller Assembly Including Gear Box And Driving Chain Assembly To Carried Out. Clean Rust , Grease , Oil And Apply New Grease. , 022Cable Reel(B) Oil Leakage Observed Gear Box Assemble. Oil Seal And Drain Plug To Be Renewed. , 023Cable Reel(C) Overhaulling Of Manual Operating Machenism Of Cable Reel To Be Carried Out.Note: Trials To Be Conducted Post Overhaulling In Presence Of Qc. , 023Cable Reel(D) Cable Reel Drum And Its Foundation Corroded/Thinned. Visual And Hammer Survey To Be Carried Out. Repair/Renewel To Be Undertaken As Per Survey Report. , 024Gauardrail And Stanchions(A) Fixed Guardrail Stanchions And Pipes Damaged/ Broken To Be Renewed.Pipe Dia - 2 Inch , 024Gauardrail And Stanchions(B) Fixed Guardrail Ms Rod Damaged/ Broken To Be Renewed.Rod Dia - 1 Inch , 024Gauardrail And Stanchions(C) Guardrails Securing Chain Damaged/ Broken To Be Renewed. Size - 8 Mm , Mat - Ms , 024Gauardrail And Stanchions(D) D- Shackles For Guardrails Securing Chain Damaged/ Broken To Be Renewed. Mat - Ms , 025Wt Hatchbutterfly Nut Demaged/Broken To Be Renewed As Per S Le. Mat- Ss , 025Wt Hatchoverhauling Of Wt Hatch Including Clips To Be Undertaken(04 Clips). , 026Wt Dooroverhauling Of Wt Door Including Clips To Be Undertaken(06 Clips). , 027Rubber Beadingrenewal Of Rubber Beading Of Wt Doors And Wt Hatches.Note: Post Renewal Of Rubber Beading Chalk Test To Be Prooved , 028Furniture(A) Wooden Panelling With Sunmica At Various Location Damaged, To Be Renewed. , 028Furniture(A) Fitment Of Plywood For 04 Bunks To Be Renewed. , 028Furniture(A) Firm To Supply O4 In Mattress , 029Mfmb Laggingmfmb Lagging Perished At Various Location, To Be Renewed. , 030Breather/ Vent Pipe(A) Vent Pipes Of Various On Upper Deck Corroded,Thinned And Holed To Be Renewed. , 030Breather/ Vent Pipe(A) Breather Head Corroded/Damaged. Breather Head To Be Renewed Along With Wiremess And Rubber Seal. , 030Breather/ Vent Pipe(B) Vent Pipe (Goose Neck Type) Corroded/Damaged. Vent Pipe Including Cap,Butterfly Nut To Be Renewed. Size - 50Mm , 031Wire Messwiremess For Mushroom Head Damaged To Be Renewed. , 031Linoleum Sheetlinoleum Sheet To Be Renewed. , 031Sliding Window & Fixed Windowslinding Glass & Fixed Glassof Window Jammed/Damaged. Window Glass Alongwith Locking Clip To Be Renewed. , 032 Bollards Single Bollards (A) Bollards Including Foundation Corroded, Thinned To Be Repaired As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.(I) Vertical Pipe Size: Dia-12, Height- 1.4 Mtr (Ii) Cross Arm Pipe Size - Dia 150Mm , Length - 800 Mm , 032 Bollards Single Bollards (A) Bollards Including Foundation Corroded, Thinned To Be Renewed As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.(I) Vertical Pipe Size: Dia-12, Height- 1.4 Mtr (Ii) Cross Arm Pipe Size - Dia 150Mm , Length - 800 Mm , 033 Bollards Twin Bollards (A) Twin Bollards Including Foundation Corroded, Thinned To Be Repaired As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.Size : Foundation Size 700X350 Mm, Pipe Dia 250Mm , 033 Bollards Twin Bollards (B) Twin Bollards Including Foundation Corroded, Thinned To Be Renewed As Per Hull Survey Report. Firm To Undertake Load Test And Provide Certificate Post Repair/ Renewal.Size : Foundation Size 700X350 Mm, Dia 250Mm , 034Anchor Windlassoverhauling Of Anchor Windlass To Be Carried Out. Overhauling Invlove Removel Of Drum, Gear Box And Brake Linings And Clean Rust, Grease Of All Component. Post Overhauling Refit And Prove For Satisfactory Operation. , 035Guide Rollerguide Roller Of Chain Cable Jammed To Be Overhauled And Prove For Free Movment. , 036D Shaped Fenders (A) Remove All D Shaped Fenders For Survey Of C Channels And Necessary Repairs Is To Be Attended On Securing Channels Including Nut And Bolts. Post Repair Of C Channels Fenders Is To Be Fitted , 036 D Shaped Fenders (B) D Shaped Fenders Damaged/Perished To Be Renewed.Specification - Epdm Rubber As Per Nes 170. Colour Blacksize On Fender 1500X 200 Mm And Id 75 Mm.Note- Quote For Material , 036D Shaped Fenders Securing Arrangement Nut And Bolts (C) Fender Securing Arrangement I.E Nut And Bolts Corroded/Thinned , To Be Renewed For Securing Of D Fenders Around Ship Side.Size: N24 Size Nut Bolt , Mat - Ss , 037 Surface Preparation Fresh Water Tanks (02 Nos)(A) Carry Out Mechanical Cleaning To St3 Standard For Paint Application. , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Hb (White) -100 Microns Dft , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Penguard Hb(Grey) -100 Microns Dft , 038 Painting - Jotun Scheme. Fresh Water Tanks (02 Nos) Paint Two In No. Fresh Water Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Penguard Hb (White) -100 Microns Dft , 039 Manhole Cover (A) Manhole Cover Of Various Tanks Corroded/Thinned, To Be Renewed . , 039 Manhole Cover (B) Nut And Bolts Of Manhole Cover To Be Renewed As. Mat-Ss , 039 Manhole Cover (C) Rubber Joints Of Manhole Cover To Be Renewed. , 040 Apt Air Pressure Test The Following Tanks And Rectify The Defects Any Observed During Pressure Testing And Prove To 0.14 Kg/ Cm2. Note:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0006 Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. Internal Tank , 041 Surface Preparation Internal Compartment(A) Carry Out Mechanical Cleaning To St3 Standard For Paint Application. , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Penguard Primer -50 Microns Dft , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jotamastic 80 (Grey) -150 Microns Dft , 042 Painting - Jotun Scheme.Internal Compartment Deck Painting Of Internal Compartment To Be Carried Out With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Middle Burnswick Green Finishing Paint -100 Microns Dft , 043 Cable Reels Cover (A) Manufacturing Of Water Proof Canvas Cover For Cable Reels As Per S Le.Approx Size For Each Cable Reel - 15 Sqm , 043 Cable Reels Cover (B) Manufacturing Of Water Proof Canvas Cover For Motors As Per S Le. Approx Size For Each Motor- 4 Sqm , 044 Sanitry System (A) Ss Wash Basin, Corroded To Be Renewed. (Mat- Ceramic, Make - Cera) Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (B) Wc Commode In Crew Washroom Damaged/Corroded. W/C Along With Flush Tank To Be Renewed (Mat- Ceramic, Make - Cera) Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (D) Ss Tap: 1/2 Inch Damaged To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items. , 044 Sanitry System (E) Fresh Water Supply Pipes Deformed/Damaged To Be Renewed. Pipe To Be Connected With Water Tank And Prove System Satisfactory Operation. Mat : Pvc/ Cu - Ni Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (F) Drain Pipe In Crew Bathroom And Wc Corroded Pipe To Be Renewed. Mat-Ms,Dia- 2 Inch , 044 Sanitry System (G) Mirror To Be Renewed (As Per S Le) Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (H) Shower Head To Be Renewed (Cera Make). Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (J) Health Faucet Damaged/Broken In Crew Wc To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 044 Sanitry System (K) Flush Valve Damaged/Broken In Crew Wc To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 045 Extinguishers Firm To Supply Fire Fighting Equipments (A) 9 Ltr Afff Extinguisher , 045 Extinguishers Firm To Supply Fire Fighting Equipments Provision Of Following Extinguishers To Be Undertaken (B) 2 Kg Co2 Extinguisher , 045 Extinguishers Firm To Supply Fire Fighting Equipments Provision Of Following Extinguishers To Be Undertaken (C) 10 Kg Dcp Extinguisher , 045 Ff Items (D) Provision Of Following Fire Hoses To Be Undertaken - Fire Hoses Length 15 Mtr With End Coupling Of Brass , 045 Ff Items (E) Fire Hose Box To Be Renewed At Various Location. , 045 Ff Items (F) Extinguisher Securing Arrangement Of Co2 , Afff , Dcp Extinguisher To Be Made At Various Location. Mat - Ms , 045 Ff Items (G) Firm To Empty Foam Tank. Old Foam Solution To Be Taken Out And Disposed As Per Exiting Guidelines. , 045 Ff Items (H) Firm To Supply Foam Solution Afff (3% Concentration) And Foam To Be Filled Onboard Craft. , 046Dc Bagdc Bag Torn/Damaged. Firm To Supply New Dc Bag With Following Dc Containt(I) Adjustable - 01 Nos(Ii) Jubli Clips - 05 Nos(Iii) Soft Wood Wadges - 15 Nos(Iv) Occam - 1 Kg(V) Spanners - 5 Nos(Vi) Multi Purpose Band -03 Nos(Vii) Stopper Plate/Stopper Pad - 02 Nos , 047Dc Torch(A) Dc Torch Non-Ops / Ber . To Be Renwed As Per S Le. , 047Dc Torch(B) Serveciability Checks Of Dc Torch Battries To Be Carried Out. Defective Battries To Be Renewed. , 048Key Securing Boardkey Hanging Board Damaged/Broken To Be Renewed As Per S Lemat- Wooden , 049Basccabascca Set I.A.W Extant Naval Policies Be Provisioned For Firefighting. Make - Dragger Or Santurian. Capacity 300 Bar , 050Fire Suitfire Suit With Gloves And Boot I.A.W Extant Naval Policies To Be Provisioned For Firefighting. As Per S Le. , 051 Panelling Ss Panelling At Indicated Locations Damaged To Be Renewed. , 052 Life Saving Appliance (A) Firm To Replace With New Life Raft Securing Arrangement (Polyester Webbing With Ss Slip And Hanger) Including Hydrostatic Release Unit (Hru Hammer H20 R). , 052 Life Saving Appliance (B) Firm To New Life Buoy (Tug Name To Be Indicated) , 052 Life Saving Appliance (C) Life Buoy Stand Damaged To Be Renewed. Mat - Ms , 052 Life Saving Appliance (D) Firm To Replace With New Life Jacket Made As Per Solas/Irs/Mmd Standard (With Iso Certificate). Jacket To Be Fitted With Three Buckle With Adjustable Belt Whistle Attached With A Lynyard Reflective Tape 04 Nos , 052 Life Saving Appliance (E) Firm To Manufacture Bracket/ Securing Arrangemnt For Hru And Sling Fitment Of Liferafts. , 053Misc Provision Of New Self Adhesive Photo Luminescent Stickers Imo Symbols & Safety Sign/Escape Route Sign. (150 Mm X 150Mm) . Firm To Provide Stickers As Per S Le , 054Chairschairs At Crew Mesh And Wheel House Damaged. Chairs To Be Renewed With Roller Wheel, Height Adjustable Type Chairs. Make - Damro/Neel Kamal. , 055Kit Lockerskit Lockers Damaged Broken To Be Renewed. Mat- Crca(18 Gauge Sheet). Size - 48X48x180 Cm . , 056Fire Hydrantsfire Hydrants Defective/Broken To Be Renewed With Same Type Of Coupling. Mat- Ss , 057Deck Washing Machinefirm To Supply 01 In Nos Deck Washing Machine, Make - Pressure Jet System, Model - Px2150ir , 058Gangwaymanufacturing Of 5 Mtr Length Aluminium Gangway As Per S Le With Load Test Certificate. , 059Mob Markerfirm To Supply 02 In Nos Mob Marker As Per S Le. , 059Mob Marker Standfirm To Manufacture And Fitment 02 In Nos Mob Marker Stand. , 060Port Holerepair/ Renewal Of 05 In Nos Port Holes To Be Undertaken With Butterfly Nuts. Mat -Brass , 061Berthing Hawserberthing Hawser Damaged/Perished To Be Renewed. Mat - Pp Rope Size - 48 Mm , Length - 220 Mtr Each Set. , 1001 Diesel Generator,Make-Greaves,Model-3G11na, (T) Fuel Shut Off Solenoid Valve To Be Overhauled. , 1001 Diesel Generator,Make-Greaves,Model-3G11na, (U) Coolant Replinish Tank To Be Repaired/Fabricated , 1001 Diesel Generator,Make-Greaves,Model-3G11na (V) Post Completion Of Routine, Engine To Be Proved For Satisfactory Perfomance , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (W) Lub Oil Pressure Gauge.(Range - 0 To 4 Kg/Cm2) , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (X) Fresh Water Pressure Gauge.(Range - 0 To 4 Kg/Cm2) , 1001 Diesel Generator,Make-Greaves,Model-3G11na, Following Gauges Of Dg Control Panel To Be Renewed (Y) Ignition Switch With Key , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. (A) Dia 80 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. (B) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Domestic Fresh Water System/ Fire Hydrant System (C) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Domestic Fresh Water System/ Fire Hydrant System (D) Dia 50 Mm , 1002 Following Valves Are To Be Overhauled & Pressure Tested Upto 1.5 Times Of Working Pressure. Fuel System E) Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (A) Dia 80 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (B) Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (C) Domestic Fresh Water System/ Fire Hydrant System Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (D) Domestic Fresh Water System/ Fire Hydrant System Dia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. E) Fuel Systemdia 50 Mm , 1003 Following System Pipes Are To Be Chemically Cleaned & Pressure Tested Upto 1.5 Times Of Working Pressure. (F) Fuel System Dia 25 Mm , 1004 Miscellaneous: (A) Exhaust Laging Of Dg Exhaust System To Be Renewed,Dia-50Mm , 1004 Miscellaneous: (B) Chemical Cleaning Of Exhaust System Of Dg(Dia-50Mm) , 1004 Miscellaneous: (C) Fuel Ru Tank & Storage Tank Level Indicator Sight Glass To Be Provisioned With New End Cocks/Fittings. , 1004 Miscellaneous: (D) Cleaning Of Fuel Storage Tank To Be Carried Out. , 1004 Miscellaneous: (E) Cleaning Of Ru Tank To Be Carried Out. , 1004 Miscellaneous: (F) Fuel System Hand Pump Overhauling To Be Carried Out. Hand Pump To Be Proved For Satisfactory Operation , 1004 Miscellaneous: (G) Cleaning Of Both Domestic Fresh Water Tank To Be Carried Out.Post Cleaning Paint To Be Applied. , 1004 Miscellaneous: (H) Overhauling Of Cable Drum Guide Mechanism To Be Undertaken. Roller & Chain Arrangement To Repaired And Bearings To Be Renewed.Track And Foundation To Be Sufficientely Strengthen. Operation Of Cable Drum Guide Mechanism To Be Proved For Satisfactory Performance. , 1005Water Leakage Observed From Roof Top Of The Generator Room. To Be Repaired For Preventing Water Leakage. Repair Job Also Includes Reneal Of Packing Of Soft Patch And Associated Fastenrs And Prove For Satsisfactory Of No Water Leakeage Post Repair. , 1006Generator Not Getting Starting View Defect In Control/ Mechanical Isues. (Model Sv Greaves 28Kw 1500Rpm 415V 3 Phase 50 Hz With 12V Battery). Complete Overhauling Of Generator To Be Undertaken And Prove For Satisfactory Operation. , 1007Oil Leakage Observed From Gear Box Cable Drum. Repair Of Gear Box Cable Drum To Be Carried Out. , Electrical Work Package2001 Diesel Alternator20kva,415V,3Ph,50Hz (A) Calibration And Overhauling Of Starter Motor Make Stm 1129 T, Rating 12 V, 2 Kw And Engine Electrical Starter (12V) To Be Overhauled. , 2001 Diesel Alternator28 Kva,415V,3Ph,50Hz (B) Callibration Of Electrical Control Panel & Engine Safety Unit To Be Carried Out. , 2001 Diesel Alternator20kva,415V,3Ph,50Hz (C) Oil Pressure Gauge (0-10 Bar), Water Pressure/ Temprature Gauge (40-120 C), Ammeter (-30 To +30) And Indicators To Be Callibrated , 2001 Diesel Alternator20kva,415V,3Ph,50Hz (D) Battery (12V,180 -Hr Capacity) To Be Renewed , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (A) 0-300 V Voltmeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (B) 0-500 V Voltmeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (C) 0-60 A Ammeter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Calibrate The Following Meters To Be Undertaken And Calibration Certificate To Be Rendered (C) 45-50-55 Frequency Meter , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Change Over Switch To Be Replaced With New Switch. , 2002 Switch Board Main Switch Board 415V, 3Ph, Make: Switch Control Gear Indication L To Be Replaced With New L . , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (A) Windlass Motor To Be Overhauled And Prove For Satisfa Tory Performance , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (B) Windlass Control Panel: Make-Geeta Engg,Mumbai , Overhauling Of Control Panel To Be Carried Out. , 2003 Windlass Control System Windlass Motor (5Hp,415V,3Ph) (C) Windlass Controller On Upper Deck To Be Overhauled. Controller Protection Cover (Weather Protection Box) To Be Fabricated. , 2004 Cable Drum Motors And Control System (A) Complete Overhauling Of Drum Motor To Be Undertaken And Prove For Satisfactory Operation Motor Type M24120 415V,3Ph,7Hp , 2004 Cable Drum Motors And Control System (B) Cable Drum Control Panel And Controller To Be Overhauled. (Cable Drum Control Panel Type:Cp-3 Make: Is Control System Limited, Kolkata) , 2004 Cable Drum Motors And Control System (C) Cable Drum Reduction Gear To Be Overhauled And Prove For Satisfactory Operation , 2004 Cable Drum Motors And Control System (D) Cable Drum Clutch To Be Repaired. , 2004 Cable Drum Motors And Control System (E) Cable Drum Gearing Mechanism Chain To Be Replaced With New Chain , 2005 Lighting Following Light Fittings Are Corroded And Holder Perished To Be Renewed With Weather Proof Equipment , 2005 Lighting Following Light Fittings And Holder To Be Repaired (A) Light Fittings In Anchor Chain Compartment , 2005 Lighting Following Light Fittings And Holder To Be Repaired (B) Led Reflectors On Upper Deck To Be Replaced. , 2005 Lighting Following Light Fittings And Holder To Be Repaired (C) Reflectors(Port And Stbd) On Roof Top To Renewed. , 2005 Lighting Following Light Fittings And Holder To Be Repaired (D) Navigational Lights I.E. Mast Head, Stern And Bow Lights Light Fittings Corroded, To Be Replaced With New , 2006Battery(A) Serviceability Checks Of 12V X 2 Batteries To Be Carried Out , 2006 Battery (B) Battery Charger To Be Repaired Capacity 12V,8 S , 2006 Battery (C) New Battery Charger To Be Provisioned Capacity 12V,8 S , 2006 Battery (D) New Batteries (12V , 180 Ah) To Be Provided . , 2007 Transformer Transfer To Be Overhauled. Transformer12 Kva, 415/230V : , 2008 Shore Supply Connection Box Shore Supply Connection Box To Be Fabricated. Shore Supply Connection Box 415 V, 3Ph Make: Switch Control Gear Mumbai. Size (2 X 2.5 X 3 Feet) : , 2009 Battery Rack Battery Rack For Stowing Da Starting Batteries To Be Factricated , 2010Flood Lights Defective. (Reflactors Model- Strulite 230V 150W Ip66) Replacment Of Flood Lights To Be Carried Out. , 2011Routines On Cable Drum Required View Rusting Of Drums. Anti Corrosive Paint To Be Applied On All Cable Drum. , 2012Mast Head / Hazard Light Defective. (Tungsten Filament Bulb 230V 40W) Replacement Of Mast Head/ Hzard Light To Be Carried Out. , 2013Weather Deck Light Defective. (Tungsten Filament Bulb 230V 60W) Replacement Of Deck Light To Be Carried Out. , 2014Light Fittings Defective. (As Per S Le) Replacement Of Light Fittings To Be Carried Out. , 2015Exhaust Fan Defective. (Model - Seiecho 230V 2400 Rpm) Replacement Of Fan To Be Carried Out. , 2016Tube Light Fitting Defective. (Philips Pl-L 36W/865/4P 6A) Replacement Of Tube Light To Be Carried Out. , Sparesl 230V ,100W
Basic Detail
Tender No GEM/2026/B/8016395
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 21 Sep 2026
Submission Date 15 Oct 2026
Open Date 16 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 2.95 Lakhs
Exemption Not Available
Document List
b6f08fad-11ee-4ac9-ae2e-bbfdbcd6ac86.pdf
1789982288.xlsx
1789036142.pdf
1789036379.pdf
1789036392.pdf
1789036398.pdf
1789036404.pdf
1789036610.pdf
1789982476.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 23 days
Oct 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 24 days

Tender Documents

Download All (ZIP) ↓
pdf

b6f08fad-11ee-4ac9-ae2e-bbfdbcd6ac86.pdf

xlsx

1789982288.xlsx

pdf

1789036142.pdf

pdf

1789036379.pdf

pdf

1789036392.pdf

pdf

1789036398.pdf

pdf

1789036404.pdf

pdf

1789036610.pdf

pdf

1789982476.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders