Drinking Water Supply and Sanitation Government Departments Closing in 2 days TDR #57618106

Tender For Concrete Lining Of 1 R Disty Offtaking At Rd 148466/R Of Bml Including Pucca Structure ( Reach Rd 35820-46600)

Issued by Government Departments · Patiala, Punjab
Tender Value
3.60 Crore
Estimated cost
Bid Submission
19 Oct 2026
2 days left
EMD
7.20 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Patiala → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Concrete Lining Of 1 R Disty Offtaking At Rd 148466/R Of Bml Including Pucca Structure ( Reach Rd 35820-46600)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 12-Oct-2026 Corrigendum1 Date 19-Oct-2026

BOQ

Name of Work:- Concrete lining of 1 R Disty offtaking at RD 148466/R of BML including pucca structure ( Reach RD 35820-46600)
Sl. No. Item Description
1Ordinary jungle clearance of both banks of distributaries, minors and drains with discharge upto 9 cs including boundary roadDischarge upto 1.5 cum/s
2Ordinary jungle clearance of both banks of distributaries, minors and drains with discharge upto 9 cs including boundary roadDischarge 1.5 Cum/s but upto 4.5 cum/s
3Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.
4Excavation of soil( any type ) using hydraulic excavator CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, including all lift and combined lead up to 30 mtr.
5Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations location with all lifts and leads for Rural area lead upto 3 KM
6Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations location with all lifts and leads for Urban area lead upto 5 KM
7Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
8Dressing of Earth work ( NEW )
9Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing (0 to 1.5 mtr depth)
10Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing (1.5 to 3.0 mtr depth)
11Dressing and preparation of sub grade for side slopes.
12Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
13Cement concrete lining 10cm thick or less with mechanical paver for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km (For Trapozoidal Section and Cup Section of all radius) For bed &side slopes
14Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) (for bed & Side Slope)
15Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Coping
16Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Sleeper
17Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
18Filling of construction/contraction joints sealing compound including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications
19Extra for Bitumen Painting @ 0.69 kg per Sqmt. supply carriage of material complete in all respect
20Providing & laying 150 micron Polyethene Sheet over sleeper
21Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
22Dressing of dowel along water carring channel in addtion to payment for dressed earth work
23Earth Work involved in dismantling of outlet ’H’ upto 0.50 mt
24Dismantling of APM of type outlet involved dismantling cement masonry & RCC slab with ‘H’ upto 0.50 mt.
25Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976
26Adjusting new APM block in correct ‘y’ and fixing in position
27Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
28First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth.
29Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
30Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars FE 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete in all respect.
31Extra labour for dressing of bricks for outlet with ‘H’ upto .5 mtr
32First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level.
3312.50 mm thick cement plaster 1:4
34Rehandling of E/Work
35Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. Mechanical Means depth upto 3Mtr
36Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
37Plain/Reinforced cement concrete M-20 in sub structure complete as per drawing and technical specifications.with batching plant transit mixer and concrete pump
38Plain/Reinforced cement concrete M-25 in sub structure complete as per drawing and technical specifications.with batching plant transit mixer and concrete pump
39Plain/Reinforced cement concrete M-30 in sub structure complete as per drawing and technical specifications.with batching plant transit mixer and concrete pump
40Laying/Dumping stone/Bajri (In Jharies)
41Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
42Cement Concrete 1:2:4 complete in all respect.
43Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish
44Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surface
45Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work,mettalic or plastered,concrete surface to give an even shade.
46Painting New letters and figures on black synthetic enamel paint to an even shade on surface
47Providing and laying 80 mm thick factory made cement concrete interlocking Paving blocks of M40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-inCharge
48Cement concrete 1:4:8 (b)With stone aggregate 40mm gauge (2)mixing by mechanical means using concrete mixer volumetric type
49Centering and shuttering for columns (Square or rectangular )
5010 mm thick Cement Plaster 1:4
51Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
52Plain/Reinforced cement concrete (RCC Grade M10 ) in sub-structure complete as per drawing and Technical Specifications
53Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H Specifications
54Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
55PCC M15 Grade levelling course below approach slab complete as per drawing and MoRT&H MoRT&H specification clause 2700
56Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)
57Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -33022/1/94-DO Ill dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
58Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
59Supplying and lying dry brick ballast. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57618106
AUTHORITY Government Departments
TENDER VALUE 3.60 Crore
LAST DATE 19-10-2026
Authority
Authority Name Water Resources Department
Work Description Tender for Concrete Lining Of 1 R Disty Offtaking At Rd 148466/R Of Bml Including Pucca Structure ( Reach Rd 35820-46600)
Basic Detail
Tender No 57/26-27
Bidding Type Tender
Location
City Patiala
State Punjab
Key Dates
Publish Date 12 Oct 2026
Submission Date 19 Oct 2026
Open Date 20 Oct 2026
Finance
Tender Value 3.60 Crore
Tender Fee 5000
EMD 7.20 Lakhs
Exemption Not Available
Document List
BOQ_357876.xls
d571d6ba-1c74-4e2a-b891-064353727129.html
Tendernotice_1 (20).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 19, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 2 days
Oct 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Oct 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_357876.xls

html

d571d6ba-1c74-4e2a-b891-064353727129.html

pdf

Tendernotice_1 (20).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender