Tender For Design, Engineering, Supply Installation Testing and Commissioning of Substation Automation System With Scada For Power Distribution System At Nfc, Kota
Tender Value
9.50 Crore
Estimated cost
Bid Submission
24 Oct 2026
32 days left
EMD
19 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chittorgarh → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Design, Engineering, Supply Installation Testing and Commissioning of Substation Automation System With Scada For Power Distribution System At Nfc, Kota
BOQ
| Sl. No. | Item Description |
| 1 | Local SCADA System at SS-03:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Substation : SS-03. complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 2 | Local SCADA System at SS-04:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Substation : SS-04. complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 3 | Local SCADA System at LC-01:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-01. complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 4 | Local SCADA System at LC-02:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-02 complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 5 | Local SCADA System at LC-03:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-03 complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 6 | Local SCADA System at ETP-LC:SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : ETP-LC complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete |
| 7 | SITC of required I/O modules and Interfacing modules to existing PLC system and integrating the data to existing Local SCADA Software along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs from 1Nos of LT-PCC panel as listed in Technical Specification and PLC panel in Substation : SS02-M01. complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items and complete |
| 8 | SITC of required I/O modules and Interfacing modules to existing PLC system and integrating the data to existing Local SCADA Software along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs from 1 Nos of LT-PCC panel as listed in Technical Specification and PLC panel in Substation : SS02-M02 . complete as per scope of work detailed in Technical Specification.Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items and complete |
| 9 | Establishment of CCR and Integration of 10 no of Substations SITC of High-Availability (Hot-Standby) server pair , Long-Term Historian & Archiving Storage , IT/Domain Controller, Engineering Workstation- 1 Nos , Operator Work Stations - 2 Nos, Giant LED screen/ Videowall, GPS master time server, firewall, parallel redundant UPS, Printer-1 No, Laptop-2 Nos, SCADA software including licenses, Managed Core Ethernet Switches, Edge Switches at 4 locations and other integrating hardwares and associated interconnecting cabling as per scope of work detailed in technical specification for integrating data from 6 nos of substation nodes with new Substation Automation Systems (SAS) under this project and 4 nos of substation nodes with already existing PLC based SAS panel to the Central Control Room (CCR) complete as per technical specification.Note: Rate shall be inclusive of all furnitures such as PC & printer tables as required, chairs, UPS rack, trolley, supply of mandatory spares etc, transportation, all labour and materials |
| 10 | Supply, laying, testing, and commissioning (SITC) of 12-Core, industrial-grade, loose-tube, jelly-filled, Corrugated Steel Tape (CST) armored, Single-Mode Fiber (SMF) Optic Cable with an FRLS/HDPE outer sheath and compliant with ITU-T G.652.D. The scope includes laying the cable in HDPE pipes through existing trenches, and overhead cable trays, including all requisite pulling, dressing, clamping, End-to-End Termination & Splicing and necessary cable identification tags between all station switches at each substation nodes and managed core ethernet switches at Central Control Room (CCR) |
| 11 | Supply |
| 12 | Installaion Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 32 daysOct 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 36 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender