Supply Of Converter A & B enable control & HOG A & B control auxiliary contactor AS PER ATTACHED BOM. => Limited
Tender Overview
Project Description
Supply Of converter a & b enable control & hog a & b control auxiliary contactor as per attached bom. , converter a & b enable control auxiliary contactor(s2hk1 & s2hk2) with 24v dc coil aux. co ntact 2no+ 3nc suitable for switch board cabinet for hog compliant lslrd coaches as per rdso specific ation no. rdso/pe/spec/tl/0195-2019 (rev.-0) or latest. make as per bom , page no- 24, sl. no14 [ warra nty period: 30 months after the date of delivery ] ] , hog a & b control auxiliary contactor (s2k8 & s2k9) with 24v dc coil, aux 3 no+ 4 nc. mate rial shall conforming rdso specification no. rdso/ pe/ spec/ tl/0195-2019 (rev-0) or latest make as per bo m , page no- 24, sl. no 15. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Converter A & B enable control auxiliary contactor(S2HK1 & S2HK2) with 24V DC coil aux. co ntact 2NO+ 3NC Suitable for Switch Board Cabinet for HOG Compliant LSLRD Coaches as per RDSO specific ation no. RDSO/PE/Spec/TL/0195-2019 (Rev.-0) or latest. Make as per BOM , Page No- 24, Sl. No14 [ Warra nty Period: 30 Months after the date of delivery ] ] |
| 2 | HOG A & B control auxiliary contactor (S2K8 & S2K9) with 24V DC coil, aux 3 NO+ 4 NC. Mate rial shall conforming RDSO specification no. RDSO/ PE/ Spec/ TL/0195-2019 (rev-0) or latest Make as per BO M , Page No- 24, Sl. No 15. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender