Tender For Construction Of Cdpo Office Building At Bargarh
Tender Value
1.02 Crore
Estimated cost
Bid Submission
06 Oct 2026
14 days left
EMD
1.02 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bargarh → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Cdpo Office Building At Bargarh
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Leadnd cost of labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge. |
| 2 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead |
| 3 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead |
| 4 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 5 | Providing, supplying filling in foundation and plinth with sand including watering ramming cost, conveyance royality and all taxes of materials and cost of labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge. G. Floor |
| 6 | Cement Concrete of proportion (1:3:6) with hard granite crusher broken metal of approved quality of 40mm size from approved quarry including hoisting and laying concrete, watering and curing, centring, shuttering and finished the exposed surface smoth including all cost, conveyance, royalities, taxes of materials and labour T&P required for the work etc. complete as per direction of the Engineer-in-charge. G. Floor |
| 7 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Column base G. floor |
| 8 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Column & beam G. Floor |
| 9 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Column & beam 1st floor |
| 10 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Column & beam 2nd Floor |
| 11 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Plinth band G. Floor |
| 12 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Lintel Band G. Floor |
| 13 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Lintel Band 1st Floor |
| 14 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Lintel Band 2nd Floor |
| 15 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC Chajja G. Floor |
| 16 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC Chajja 1st Floor |
| 17 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC Chajja 2nd Floor |
| 18 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC roof slab G. Floor |
| 19 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC roof slab 1st floor |
| 20 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. RCC roof slab 2nd Floor |
| 21 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Stair case G. Floor |
| 22 | R.C.C. work (1:1.5:3) having compressive strength ( in works test) with using 12mm size black hard crusher broken granite chips including hoisting, lowering, laying and compacting concrete, including cost, conveyance, royalities, and all taxes and cost of all labour with T&P and rigid smooth centring, shuttering work with false work etc. complete as per the specification and direction of the Engineer-in-charge. Stair case 1st floor |
| 23 | Fly ash bricks of 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) including watering, cuiring and cost, conveyance, taxes royality labour etc complete as per the specification and direction of the Engineer-in-charge. In Foundation & plinth G. Floor |
| 24 | Fly ash bricks of 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) including watering, cuiring and cost, conveyance, taxes royality labour etc complete as per the specification and direction of the Engineer-in-charge. In Superstructure G. Floor |
| 25 | Fly ash bricks of 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) including watering, cuiring and cost, conveyance, taxes royality labour etc complete as per the specification and direction of the Engineer-in-charge. In Superstructure 1st floor |
| 26 | Fly ash bricks of 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) including watering, cuiring and cost, conveyance, taxes royality labour etc complete as per the specification and direction of the Engineer-in-charge. In Superstructure 2nd Floor |
| 27 | Providing strainghtening, cutting, bending, binding, M.S. or T.S. rods/ HYSD Bar reinforcements and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost conveyance and all taxes of all M.S. rods or T.S rods binding wires 18 to 20 gauge as required for RCC work etc complete as per the specification and direction of the Engineer-in-charge G. Floor |
| 28 | Providing strainghtening, cutting, bending, binding, M.S. or T.S. rods/ HYSD Bar reinforcements and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost conveyance and all taxes of all M.S. rods or T.S rods binding wires 18 to 20 gauge as required for RCC work etc complete as per the specification and direction of the Engineer-in-charge 1st floor |
| 29 | Providing strainghtening, cutting, bending, binding, M.S. or T.S. rods/ HYSD Bar reinforcements and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost conveyance and all taxes of all M.S. rods or T.S rods binding wires 18 to 20 gauge as required for RCC work etc complete as per the specification and direction of the Engineer-in-charge 2nd Floor |
| 30 | Supply fitting and fixing vetrified floor tiles in floor 600mmx600mm printed/coloured series trade on steps and landing on 25mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer in charge . G. Floor |
| 31 | Providing supplying fitting and fixing of M.S. doors shutter frame, windows frame, shutters with grill gate etc. complete including cost, carriage, labour, taxes and T&P etc. complete as per specification and direction of the Engineer-in-charge. G. Floor |
| 32 | Providing supplying fitting and fixing of M.S. doors shutter frame, windows frame, shutters with grill gate etc. complete including cost, carriage, labour, taxes and T&P etc. complete as per specification and direction of the Engineer-in-charge. 1st floor |
| 33 | Providing supplying fitting and fixing of M.S. doors shutter frame, windows frame, shutters with grill gate etc. complete including cost, carriage, labour, taxes and T&P etc. complete as per specification and direction of the Engineer-in-charge. 2nd Floor |
| 34 | Supplying,fitting & fixing aluminium door with OEL anodized aluminium door section of 9202 as vertical member,9201 as top member and 9200 as bottom and middle member and 12mm thick pre-laminated board fixed on door frame by meansof tapered clip no 4660 and the frame to be completed by means jointing angle no 1855 including all cost of labour, T&P, hire charges of drilling machine and etc complete G. Floor |
| 35 | Supplying, fitting, fixing fully glazed aluminum framed openable doors using 15 micron anodized OEL aluminum section 2082 as out section,9139 as mullion section,4124 as a shutter section frame with tapered clip of section 4125, aluminum angle, rubber beading, friction stay and handle etc with 5mm black glass. G. Floor |
| 36 | Supplying, fitting, fixing up window (sliding type) made up aluminium section 151-154, 151-155,aswindow frame Section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as pannel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes of labour, T&P etc. complete asper direction of E.I.C G. Floor |
| 37 | Supplying, fitting, fixing up window (sliding type) made up aluminium section 151-154, 151-155,aswindow frame Section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as pannel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes of labour, T&P etc. complete asper direction of E.I.C 1st floor |
| 38 | 16mm thick cement plaster (1:6) finished smooth to surface of brick walls after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge. G. Floor |
| 39 | 16mm thick cement plaster (1:6) finished smooth to surface of brick walls after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge. 1st Floor |
| 40 | 16mm thick cement plaster (1:6) finished smooth to surface of brick walls after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge. 2nd Floor |
| 41 | 12mm thick cement plaster (1:6) finished smooth to surface of brick works after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge.G. Floor |
| 42 | 12mm thick cement plaster (1:6) finished smooth to surface of brick works after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge.1st Floor |
| 43 | 12mm thick cement plaster (1:6) finished smooth to surface of brick works after racking out joints including watering and curing with cost and conveyance royalities and taxes of all materials and cost of all labour, T&P required for the work as directed by the Engineer-in-charge.2nd Floor |
| 44 | Supply fitting and fixing vetrified floor tiles in floor 600mmx600mm printed/coloured series trade on steps and landing on 25mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer in charge .G. Floor |
| 45 | Supply fitting and fixing vetrified floor tiles in floor 600mmx600mm printed/coloured series trade on steps and landing on 25mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer in charge .1st Floor |
| 46 | Supplying fitting and fixing ceramic tiles in walls on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and polishing etc as per directin of the Engineer in charge . G. Floor |
| 47 | Supplying fitting and fixing ceramic tiles in walls on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and polishing etc as per directin of the Engineer in charge . 1st Floor |
| 48 | Providing & Fixing Antiskid Ceramic tiles in floors Including cost and conveyance of all materials to site, and all labour charges complete including cost at tiles etc.as per direction of the Engineer-in-charge.1st Floor |
| 49 | Painting two coats over a coat of primer with any approved shade over the iron works including cost conveyance of all materials including cost of primer with all taxes and cost of all labour with T&P required for the work as directed by the Engineer-in-charge.G. Floor |
| 50 | Painting two coats over a coat of primer with any approved shade over the iron works including cost conveyance of all materials including cost of primer with all taxes and cost of all labour with T&P required for the work as directed by the Engineer-in-charge.1st Floor |
| 51 | Painting two coats over a coat of primer with any approved shade over the iron works including cost conveyance of all materials including cost of primer with all taxes and cost of all labour with T&P required for the work as directed by the Engineer-in-charge.2nd Floor |
| 52 | Wall painting two coats with any approved quality of Weather seal coat over a coat of priming on new work to give an even shade including cost of all materials, labour, T&p required for the work complete.G. Floor |
| 53 | Wall painting two coats with any approved quality of Weather seal coat over a coat of priming on new work to give an even shade including cost of all materials, labour, T&p required for the work complete.1st Floor |
| 54 | Wall painting two coats with any approved quality of Weather seal coat over a coat of priming on new work to give an even shade including cost of all materials, labour, T&p required for the work complete.2nd Floor |
| 55 | Distempering two coats to wall with any approved shade over the walls including cost of distemper with all taxes and cost of all labour with T&P required for the work as per specification and direction of the Engineer-in-charge.G. Floor |
| 56 | Distempering two coats to wall with any approved shade over the walls including cost of distemper with all taxes and cost of all labour with T&P required for the work as per specification and direction of the Engineer-in-charge.1st Floor |
| 57 | Distempering two coats to wall with any approved shade over the walls including cost of distemper with all taxes and cost of all labour with T&P required for the work as per specification and direction of the Engineer-in-charge.2nd Floor |
| 58 | Wall Priming one coat with any approved primer on New Plastered surface of with any approved primer including cost of primer etc complete as per direction of the engineer-in-Charge.G. Floor |
| 59 | Finishing walls surface of walls with Acrylic wall putty (water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials,taxes, labour T&P etc. complete as per direction of the Engineer-in-charge.G. Floor |
| 60 | Finishing walls surface of walls with Acrylic wall putty (water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials,taxes, labour T&P etc. complete as per direction of the Engineer-in-charge.1st Floor |
| 61 | Finishing walls surface of walls with Acrylic wall putty (water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials,taxes, labour T&P etc. complete as per direction of the Engineer-in-charge.2nd Floor |
| 62 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing in all floors using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete in all respect. G. Floor |
| 63 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing in all floors using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete in all respect. 1st Floor |
| 64 | Cement Concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry in foundation laying concrete including watering, curing cost, conveyance taxes, royality of all materials required for the work etc. complete as per specification and direction of the Engineer-in-charge. G. Floor |
| 65 | Providing & laying 80mm thick factory made cement concrete interlocking paver block of grade M-40 grade made by block making machine with strong vibratory compaction of approved size, dressing & shape, laid in required colour & pattern over and including 50mm thick compacted bed of course sand, filling the joints with line sand etc complete as per direction of the Engineer-In-Charge.G. Floor |
| 66 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work per 1 sqm.1st Floor |
| 67 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work per 1 sqm. 2nd Floor |
| 68 | 20 mm thick grading Plaster using cement Plaster 1:4 on roof slab cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer in Charge 2nd Floor |
| 69 | 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment. 2nd Floor |
| 70 | Supply fitting and fixing 110 mm dia PVC rain water down pipe with spouts of 500 mm length including cutting holes in parapet making good to be damages in CC 1:2:4 with portland slag cement (PSC) etc. as per direction of Engineer-in-Charge. 2nd Floor Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysOct 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender