Tender For Repair/ Maintenance Of Fire Hydrant Pump, Pipe Lines And Connected Item At Bhisiana Under Ge (Af) Bhisiana
Tender Overview
Project Description
Tender for Repair/ Maintenance Of Fire Hydrant Pump, Pipe Lines And Connected Item At Bhisiana Under Ge (Af) Bhisiana
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Oct-2026 | Corrigendum02 | BOQ | 12-Oct-2026 |
| 2 | 01-Oct-2026 | Corrigendum01 | Date | 12-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in trenches (Manual), not exceeding 1.5m wide and not exceeding 1.5m in depth for foundations of shafts, wells, cess pits, manholes, pipe line, cable in trenches etc., not exceeding 10 Sqm on plan and getting out in any type of soft including trimming the sides and forming bottom surfaces to required levels complete all as specified and as directed. |
| 2 | Returning, filling including spreading, leveling watering and well ramming in layers not exceeding 25cm thick in soft/loose soil complete all as specified and as directed. |
| 3 | Removing excavated material (surplus soil) to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and as directed. |
| 4 | Material and labour in repair/replacement of existing hose box made of 18 gauge MS sheet, size 800 mm × 600 mm × 250 mm, complete with double-leaf doors glazed with 4 mm thick glass and door frame made of 16 gauge MS sheet, including taking down the existing unserviceable hose box, dismantling, cutting and removal of defective portions, fabrication and replacement of MS sheet, door frame and doors as required, providing and fixing 4 mm thick glass, hinges, handles, locking arrangement, stays and necessary nuts, bolts and other fixing accessories, surface preparation and application of one coat of suitable metal primer and two finishing coats of fire red paint externally and brilliant white paint internally, including all materials, labour, tools and tackles and disposal of dismantled materials as directed by Engineer-in-Charge, complete all as specified and as directed by Engineer-in-Charge. |
| 5 | Taking out of unserviceable CI/GI/MS pipes of 80 mm dia bore, including all fittings with flanged ends, complete with disconnecting pipe joints and fittings, removing nuts, bolts, gaskets and other jointing materials, carefully taking down and handling the pipes and fittings, including stacking the serviceable materials and disposal of unserviceable materials at the place directed by the Engineer-in-Charge.Note: Excavation and earth work shall be measured and paid for separately. |
| 6 | Taking out of unserviceable CI/GI/MS pipes of 100 mm dia bore, including all fittings with flanged ends, complete with disconnecting pipe joints and fittings, removing nuts, bolts, gaskets and other jointing materials, carefully taking down and handling the pipes and fittings, including stacking the serviceable materials and disposal of unserviceable materials at the place directed by the Engineer-in-Charge.Note: Excavation and earth work shall be measured and paid for separately. |
| 7 | Taking out of unserviceable CI/GI/MS pipes of 150 mm dia bore, including all fittings with flanged ends, complete with disconnecting pipe joints and fittings, removing nuts, bolts, gaskets and other jointing materials, carefully taking down and handling the pipes and fittings, including stacking the serviceable materials and disposal of unserviceable materials at the place directed by the Engineer-in-Charge.Note: Excavation and earth work shall be measured and paid for separately. |
| 8 | Supply, fixing and testing of MS ERW pipe of 80 mm bore, heavy grade, conforming to IS 1239 Part-I, including all necessary accessories such as flanges, tees, bends, reducers and other required fittings, jointing by welding, including nuts, bolts, gaskets and other jointing materials, cleaning and preparation of pipe surface, testing for leakage and satisfactory operation, and painting of exposed pipe with two coats of first-quality enamel paint, and for buried/underground portions providing anticorrosive treatment with one coat of bitumen followed by wrapping with bitumen hessian cloth, complete all as specified and as directed by the Engineer-in-Charge. |
| 9 | Supply, fixing and testing of MS ERW pipe of 100 mm bore, heavy grade, conforming to IS 1239 Part-I, including all necessary accessories such as flanges, tees, bends, reducers and other required fittings, jointing by welding, including nuts, bolts, gaskets and other jointing materials, cleaning and preparation of pipe surface, testing for leakage and satisfactory operation, and painting of exposed pipe with two coats of first-quality enamel paint, and for buried/underground portions providing anticorrosive treatment with one coat of bitumen followed by wrapping with bitumen hessian cloth, complete all as specified and as directed by the Engineer-in-Charge. |
| 10 | Supply, fixing and testing of MS ERW pipe of 150 mm bore, heavy grade, conforming to IS 1239 Part-I, including all necessary accessories such as flanges, tees, bends, reducers and other required fittings, jointing by welding, including nuts, bolts, gaskets and other jointing materials, cleaning and preparation of pipe surface, testing for leakage and satisfactory operation, and painting of exposed pipe with two coats of first-quality enamel paint, and for buried/underground portions providing anticorrosive treatment with one coat of bitumen followed by wrapping with bitumen hessian cloth, complete all as specified and as directed by the Engineer-in-Charge. |
| 11 | Supply, fixing and testing of air vessel (air cushion tank) of size 250 mm dia × 1000 mm high, with dished top, fabricated from minimum 6 mm thick MS pipe/plate, complete with 20 mm dia brass air valve (ball type), 200 mm air relief valve, 20 mm dia stop valve, pressure gauge with brass stop cock, nipples, tees, elbows and all necessary connecting fittings, including taking down and removal of existing unserviceable air vessel, dismantling of connected fittings, fixing and connecting the new air vessel to the existing system, welding/threaded joints as required, leak testing and pressure testing, including nuts, bolts, gaskets, jointing materials and all necessary materials, labour, tools and tackles, complete all as specified and as directed by the Engineer-in-Charge. |
| 12 | Supply and fixing in repair/replacement of cast iron sluice valve, heavy duty, Class PN 1.6, conforming to IS 14846:2000, with flanged ends, 80 mm nominal bore, ISI marked, complete with gun metal or stainless steel spindle and cast iron hand wheel, including rubber/fibre board gaskets, nuts, washers and other necessary jointing materials, suitable for fire-fighting pressurised pipeline, including taking down and removal of existing unserviceable valve, disconnecting from existing pipeline, necessary excavation, refixing/reconnecting, testing for leakage and satisfactory operation, and returning and filling of excavated earth, complete all as specified and as directed by the Engineer-in-Charge. |
| 13 | Supply and fixing in repair/replacement of cast iron sluice valve, heavy duty, Class PN 1.6, conforming to IS 14846:2000, with flanged ends, 150 mm nominal bore, ISI marked, complete with gun metal or stainless steel spindle and cast iron hand wheel, including rubber/fibre board gaskets, nuts, washers and other necessary jointing materials, suitable for fire-fighting pressurised pipeline, including taking down and removal of existing unserviceable valve, disconnecting from existing pipeline, necessary excavation, refixing/reconnecting, testing for leakage and satisfactory operation, and returning and filling of excavated earth, complete all as specified and as directed by the Engineer-in-Charge. |
| 14 | Supply and fixing in repair/replacement of cast iron butterfly valve, PN 1.6, ISI marked, conforming to IS 13095, with nitrile rubber lining/seating, 80 mm nominal bore, complete with necessary operating arrangement, including taking down and removal of existing unserviceable butterfly valve, disconnecting from existing pipeline, providing necessary gaskets, nuts, bolts, washers and other jointing materials, fixing and connecting the new valve, testing for leakage and satisfactory operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 15 | Supply and fixing in repair/replacement of cast iron butterfly valve, PN 1.6, ISI marked, conforming to IS 13095, with nitrile rubber lining/seating, 100 mm nominal bore, complete with necessary operating arrangement, including taking down and removal of existing unserviceable butterfly valve, disconnecting from existing pipeline, providing necessary gaskets, nuts, bolts, washers and other jointing materials, fixing and connecting the new valve, testing for leakage and satisfactory operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 16 | Supply and fixing in repair/replacement of cast iron butterfly valve, PN 1.6, ISI marked, conforming to IS 13095, with nitrile rubber lining/seating, 150 mm nominal bore, complete with necessary operating arrangement, including taking down and removal of existing unserviceable butterfly valve, disconnecting from existing pipeline, providing necessary gaskets, nuts, bolts, washers and other jointing materials, fixing and connecting the new valve, testing for leakage and satisfactory operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 17 | Supply, fixing and testing of fire brigade inlet connection, 4-way, with 63 mm dia instantaneous type male couplings, complete with non-return valves and sluice valves, including necessary nuts, bolts, rubber insertions/gaskets and other jointing materials, including taking down and removal of existing unserviceable fire brigade inlet connection, disconnecting from existing pipeline, fixing and connecting the new assembly, testing for leakage and satisfactory operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 18 | Supply, fixing and testing of pressure gauge of 100 mm dia, suitable for working pressure of 14 kg/cm², complete with isolation/stop cock, including brass nipple, fittings, connection accessories and necessary jointing materials, including taking down and removal of existing unserviceable pressure gauge and fittings, disconnecting from existing pipeline, fixing and connecting the new gauge, testing for leakage and accuracy of pressure indication, complete all as specified and as directed by the Engineer-in-Charge. |
| 19 | Supply, fixing and testing of pressure switch, suitable for fire-fighting pressurised pipeline, complete with necessary mounting and connection accessories, including brass nipple, isolation/stop cock, fittings, nuts, bolts, wiring/terminal connections and other necessary jointing materials, including taking down and removal of existing unserviceable pressure switch, disconnecting existing connections, fixing and connecting the new pressure switch, setting/adjustment of pressure cut-in and cut-out as required, and testing for proper operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 20 | Supply and fixing in repair/replacement of first-aid fire hose reel, wall-mounted, swinging type, complete with hose reel drum, wall mounting bracket, 20 mm dia gate valve/stop cock and 20 mm dia × 30 m long high-pressure hose reel tubing of thermoplastic Type-II hose conforming to IS 12585 and ISI marked, complete with gunmetal shut-off nozzle of 5 mm bore, including hose connections, clamps, fasteners and necessary jointing accessories, taking down and removal of existing unserviceable hose reel, fixing and connecting the new hose reel to the existing fire-fighting pipeline, testing for leakage and satisfactory operation, complete all as specified and as directed by the Engineer-in-Charge. |
| 21 | Supply, fixing and testing of manual call point (resettable type), suitable for 24 V DC working voltage, complete with push button, breakable glass, chain, hammer and necessary mounting and connection accessories, finished in red colour, including taking down and removal of existing unserviceable manual call point, disconnecting existing wiring, fixing and connecting the new unit, testing for proper operation and satisfactory operation with the fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. |
| 22 | Supply and fixing in repair/replacement of addressable electronic sounder, horizontal type, single stage, continuous normal operation, suitable for the existing addressable fire alarm system, complete with necessary mounting, addressing and connection accessories, including taking down and removal of existing unserviceable sounder, disconnecting existing wiring, fixing and connecting the new sounder, programming/addressing as required and testing for proper operation with the fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. |
| 23 | Supply and fixing in repair/replacement of addressable/conventional type photoelectric/optical smoke detector, complying with and type certified to EN 54, conforming to IS 11360, complete with detector base and in-built intelligence, suitable for the existing fire alarm system, including suitable fixing and connection arrangements, taking down and removal of existing unserviceable detector, disconnecting existing wiring, fixing and connecting the new detector, addressing/programming where applicable and testing for proper operation with the fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. |
| 24 | Supply and fixing in repair/replacement of addressable/conventional type flame detector with UV/IR detection capacity, complying with and type certified to EN 54, suitable for the existing fire alarm system, complete with detector base, in-built intelligence and relay type module, including the cost of relay type module to form a complete set, with suitable fixing and connection arrangements, including taking down and removal of existing unserviceable flame detector, disconnecting existing wiring, fixing and connecting the new detector and relay module, addressing/programming wherever applicable, necessary testing and commissioning for satisfactory operation with the existing fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. |
| 25 | Supply and fixing in repair/replacement of addressable/conventional type multisensor detector having heat and smoke combination, complying with and type certified to EN 54, conforming to IS 11360, complete with detector base and in-built intelligence, suitable for the existing fire alarm system, including suitable fixing and connection arrangements, taking down and removal of existing unserviceable detector, disconnecting existing wiring, fixing and connecting the new detector, addressing/programming wherever applicable and testing for proper operation with the existing fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. |
| 26 | Supply and fixing in repair/replacement of addressable/conventional type heat detector, rate-of-rise cum fixed-temperature type, conforming to IS 2175, complete with detector base and in-built intelligence, suitable for the existing fire alarm system, including suitable fixing and connection arrangements, taking down and removal of existing unserviceable heat detector, disconnecting existing wiring, fixing and connecting the new detector, addressing/programming wherever applicable and testing for proper operation with the existing fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 27 | Supply and fixing in repair/replacement of addressable/conventional type heat detector, rate-of-rise cum fixed-temperature type, conforming to IS 2175, complete with detector base and in-built intelligence, suitable for the existing fire alarm system, including suitable fixing and connection arrangements, taking down and removal of existing unserviceable heat detector, disconnecting existing wiring, fixing and connecting the new detector, addressing/programming wherever applicable and testing for proper operation with the existing fire alarm system, complete all as specified and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender