Tender For Construction of Foot Over Bridge At Bassi Chowk (Bhoranj)(Sh:- Footing & Column Work Etc. And Febrication,Erection And Launching Welding,Primer Coating,Painting Complete Job In Superstructure (Mmsy)
Tender Value
59.01 Lakhs
Estimated cost
Bid Submission
26 Sep 2026
4 days left
EMD
1.18 Lakhs
Bank guarantee accepted
Document Fee
4000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hamirpur → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction of Foot Over Bridge At Bassi Chowk (Bhoranj)(Sh:- Footing & Column Work Etc. And Febrication,Erection And Launching Welding,Primer Coating,Painting Complete Job In Superstructure (Mmsy)
BOQ
| Sl. No. | Item Description |
| 1 | Substructure |
| 2 | Earth work in excavation for all types of road structure such as retaining walls ,breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil , ordinary rock , hard rock, chiseling/wedging out or rock (where blasting is prohibited ) as per drawings and construction of shoring and bracing removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts includin dressing of sides and bottom and back filling in trendches with excavated suitable approved material to the original surface in layers not exceeding 150mm (one hundred fifty millimetre ) compacted thickness including shoring an structting and pumping and bailling out water (surface and sub sol water) upto any depth and any quantum of water inclusing cleaning of slush which arise out during dewatering as per the direction of the Engineer-in-charge including entire carrriage of material within all leads and lfts and other incidentals.The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for including entire carrriage of material within all leads and lfts and other incidentals.The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. |
| 4 | Foundations, footings, bases for columns |
| 5 | Columns, piers, abutments, pillars, posts and struts |
| 6 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 cement : 6 fine sand : 12 graded stone aggregate 40 mm nominal size) as per directon of Engineer-in-Charge including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. |
| 7 | Mild steel/Tor steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars as per direction of Engineer- in -Charge, including entire carriage of materials in all leads and lifts and other incidentals. The rates are inclusive octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size)as per directon of Engineer-in-Charge including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. |
| 9 | Total |
| 10 | Superstructure |
| 11 | 1504070000 steel work welded in built up section trusses and framed work including cutting, hoisting,fixing in postion and applying a priming coat of red lead paint. In trussed steel bridge of any span and any height, rate including cost of temporary structure, arrangement for providing counter weight for launching truss, making of nose etc. including carriage of materials within all leads and lifts and other incidental as per the direction of Engineer.-in -charge. The rates includes octori, royality, Malkana, toll tax, Good service tax,building & other construction workers, welfare cess, royalty or any other tax levy or cess in respect of input for or output by this contract shall be payable by the contractor and Govt. shall not entertain any claim what so ever in this respect of the same. |
| 12 | 13.48.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads and lifts and other incidental as per the direction of Engineer-in -charge. The rates includes octori, royality, Malkana, toll tax, Good service tax,building & other construction workers, welfare cess, royalty or any other tax levy or cess in respect of input for or output by this contract shall be payable by the contractor and Govt. shall not entertain any claim what so ever in this respect of the same. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysSep 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender