Tender For State Plan-State Plan-2026-2027- Energy Efficient- Supply And Installation Of Fcma Soft Starter For A 200 Hp Slip Ring Induction Motor, Supply And Installation Of 630 A Ssb Panel, And Supply And Laying Of Ug Cables Of Various Sizes, At The
Tender Overview
Project Description
Tender for State Plan-State Plan-2026-2027- Energy Efficient- Supply And Installation Of Fcma Soft Starter For A 200 Hp Slip Ring Induction Motor, Supply And Installation Of 630 A Ssb Panel, And Supply And Laying Of Ug Cables Of Various Sizes, At The Raw Water Pump House - Painkulam-Electrical Work-General Electrical Work
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Sep-2026 | Tender extension1 | Date | 22-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Working Charges |
| 2 | OD267967/2025-2026:Charges for the dismantling and removal of the old, rusted, and damaged sub-switch panel, along with the removal of old and damaged cables connecting the obsolete rheostat-type starter to the motor and sub-switch board. This also includes dismantling the old, unsafe and damaged rheostat-type SRIM starter. |
| 3 | OD267968/2025-2026:Charges for Supply and installation of FCMA soft starter with an inbuilt 400A Power on contactor, 250A Byapss Contactor, 250A Rotor control contactor, Sufficiently rated series reactor, 400A 3P MCCB as Incomer with shunt trip coil, MPR for Motor protection, ELR for earth leakage protection, VPR for voltage protection, and Sufficiently rated AL Busbars, and cable entry provisions |
| 4 | OD267974/2025-2026:Charges for Supply and installation Sub Switchboard (SSB), with an incomer of capacity 630A TPN SDF, Outgoing 400A TPN SDF,Spare provision for a 400A TPN SDF, VAF Metering, and Sufficiently rated AL Busbars, and cable entry provisions |
| 5 | OD267965/2025-2026:Charges for Supply and installation of 40kVAr heavy duty capacitor bank with 100A switch disconnector fuse unit (SDF) as incomer, equipped with adequately rated duty contactors, and inbuilt VPR for enhanced operational life. |
| 6 | OD267970/2025-2026:Charges for Supply and laying of 3.5x240 sq. mm AL UG cable single run from Sub Switchboard to starter panel |
| 7 | OD267973/2025-2026:Charges for Supply and laying of 3.5x185 sq. mm AL UG cable - 2 runs from starter to motor stator terminal box, and single run from the starter to slip ring terminals |
| 8 | OD267966/2025-2026:Charges for Supply and installation of angle frame stand to raise the height of the new starter panel by 1 mtr. |
| 9 | OD267971/2025-2026:Charges for Supply and termination of 3.5x240 sq. mm AL UG cable |
| 10 | OD267969/2025-2026:Charges for Supply and termination of 3.5x185 sq. mm AL UG cable |
| 11 | OD267972/2025-2026:Charges for Testing and commisioning of the all new installations Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 24 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 25 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender