Tender For New Construction Work Of Missing Link Of Hamirpur Kalpi Road (Sh-91) Km 2 To Gangwa Dera Via Brahma Ka Dera Marg.
Tender Overview
Project Description
Tender for New Construction Work Of Missing Link Of Hamirpur Kalpi Road (Sh-91) Km 2 To Gangwa Dera Via Brahma Ka Dera Marg.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Sep-2026 | Machinery | Technical Bid | 25-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m & lead up to 5000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 (Carted Earth Work) |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 3 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm to water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement (M-30), thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 5000 m as per Technical Specification Clause 303.1. (Carted EW) |
| 6 | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 7 | Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9. |
| 8 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202,1203,1109. |
| 9 | Brick Masonry Work in 1:4 cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A). |
| 10 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 |
| 11 | Providing and Laying 350 mm Dia RCC Hume Pipe NP3 as per design in Single Row for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106./(G) 350 mm Dia |
| 12 | Providing and Laying 600 mm Dia RCC Hume Pipe NP3 as per design in Single Row for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / 600 mm dia |
| 13 | Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 |
| 14 | Reinforced cement concrete M15 grade Hectometer stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 |
| 15 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@0 % of total work amount S.No.1-9) CC Portion |
| 16 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2nd year (@0.25 % of total work amount S.No.1-9) CC Portion |
| 17 | Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3rd year (@0.50% of total work amount S.No.1-9) CC Portion |
| 18 | Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4th year(@0.75% of total work amount S.No.1-9) CC Portion |
| 19 | Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5th year (@1.00% of total work amount S.No.1-9) CC portion Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender