Tender For Operation, Running, Maintenance And Watch And Ward Of 24.50 Mld Water Treatment Plant, Raw Water And Clear Water Pumping Machinery At Sector-32 Panchkula Including Repair Spare Parts Etc., Chemical Dosing Panchkula Complete In All Respect
Tender Overview
Project Description
Tender for Operation, Running, Maintenance And Watch And Ward Of 24.50 Mld Water Treatment Plant, Raw Water And Clear Water Pumping Machinery At Sector-32 Panchkula Including Repair Spare Parts Etc., Chemical Dosing Panchkula Complete In All Respect For A Period Of One Year.
BOQ
| Sl. No. | Item Description |
| 1 | Maintenance pumping machinery of different hp and Spare Repair of ACB, MCCB, CT Meters contactor, capacitors transformer, genset, including diesel and other lubricants i.e complete Machinery equipment and water test laboratory including equipment and material and SCADA system and maintenance charges at 24.50 MLD WTP sector-32 Panchkula complete in all respect as entire satisfaction of EIC. |
| 2 | Refilling of liquid/ gaseous chlorine in existing tonners of M.T department, dose of chlorination upto 2.00 PPM at source so as to give minimum does of 0.2 PPM at farthest point including cost of chlorine, transportation, carriage upto WTP Sector-32 Panchkula and Dosing in water as per requirement complete in all respect upto entire satisfaction of the EIC (for a period of 12 months |
| 3 | Supply and dosing of PAC/Alum @20 PPM at one time including cost of PAC/Alum transportation, carriage upto WTP Sector-32, Panchkula and Dosing in water as per requirement complete in all respect upto entire satisfaction of the Engineer-In- Charge for a period of 12 months |
| 4 | Running, operation, watch and ward i.e Manpower of Pump operator Casual Labour, Chemist, Specialist/plant supervisor, Electrician, PLC Plant operator, Mali-cum chowkidar/watchmen/security guard, sweeper etc. complete in all respect as entire satisfaction of Engineer In Charge |
| 5 | Maintenance of grass, lawns, hedges, trees and total campus area WTP- 24.50 MLD Sector-32 Panchkula as per requirement and as per HSR ITEM 26.6 complete in all respect upto entire satisfaction of the EIC |
| 6 | Additional necessary work to be done at site to make WTP functional as the WTP is lying defunctional / non functional since June-2023 due to non availability of Raw Water. i)Renovation of machinery i.e Raw Water and clear water Pump and motors along with vaccum pumps, . Mechanical Equipment, Flash Mixer, Clariflocculator Mechanism, Mixers of chemical, Pumps of Chemicals, Filter bed Valves actuators, Valves, Chlorination units – 4 nos. including pumping sets safety equipment,Pump sets for backwash, Renovation and replacement of faulty units of electrical equipments like main Electric panel, Starter panels, Power Factor Panel, Water Treatment Plant Electric Panel, PLC SCADA Panel, various electronic circuits, chips, Renovation of Transformer and DG set, Water tightness test on WTP RCC structures and carrying out leakage stoppage, Painting work including , (a) Buildings (b) Railings(c) Steel Structures, including steel bridges(d) On various sluice Gates (e) On RCC Walls, Desludging and dewatering of Water Treatment Plant and Removal of vegetation, weeds, sarkanda from filter beds. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender