Tender For Supply, Installation, Testing And Commissioning And Handing Over At Site Of Multi Flex Two Tier Storage Systemunder Warehouse For The Project Administrative And Logistic Infrastructure Including Schools, Hospitals, Auditorium & Sports Faci
Tender Overview
Project Description
Tender for Supply, Installation, Testing And Commissioning And Handing Over At Site Of Multi Flex Two Tier Storage Systemunder Warehouse For The Project Administrative And Logistic Infrastructure Including Schools, Hospitals, Auditorium & Sports Facilitates At Sbo (Rambilli) Wp -7 , Supply, Installation,Testing And Commissioning Multi Flex Two Tier Storage System As Indicated At Part Ii Of Rfp. , Supply Of Multipurpose Crate Storage Bins (Bins Storage Plastic) As Indicated At Para 3.2 Of Part Ii Of Rfp. , Civil Work (Refers To Para 3 (3.12) And 6 Of Part Ii Of Rfp) , Standard Accessories (Refers To Para 12 Of Part Ii Of Rfp) , Technical Literature / Certificates / Documentation (Refers To Para 14 Of Part Ii Of Rfp) , Acceptance, Testing And Commissioning Charges (Refers To Para 15 Of Part Ii Of Rfp) , Any Other Item Such As Transportation, Insurance, Freight, Packing Etc , Notes: 1. Cost Of Item Listed At Sl 1 And 2 Are To Be Quoted In The Respective Rows Of The Price Bid Sheet. 2. Bidder Not Permitted To Include Cost Of Items Listed At Sl 3 To 7 With Sl 1 And 2 As Lumpsum Amount 3. Bidder Required To Mandatorily Quote For Sl 1 And 2 Failing Which Bid Shall Be Treated As Non Bonafide And Liable For Rejection. 4. L1 Will Be Determined Based On All Elements Of Costs Including Taxes And Duties, Etc. 5. Any Clarrifications Contact To So1(Gp3) Phone No.9246036272 And Email Id: [email protected] 6. Bidders Are Mandatorily To Quote Gst/ Taxes As Applicable Against Each Serials, Falling Which Bid Shall Be Treated As Non Bonafide And Liable For Rejection.
BOQ
| Sl. No. | Item Description |
| 1 | Supply, Installation,Testing and Commissioning Multi Flex Two Tier Storage System as indicated at Part II of RFP. |
| 2 | Supply of Multipurpose Crate Storage Bins (Bins Storage Plastic) as indicated at Para 3.2 of Part II of RFP. |
| 3 | Civil Work (Refers to Para 3 (3.12) and 6 of Part II of RFP) |
| 4 | Standard Accessories (Refers to Para 12 of Part II of RFP) |
| 5 | Technical Literature / Certificates / Documentation (Refers to Para 14 of Part II of RFP) |
| 6 | Acceptance, Testing and Commissioning charges (Refers to Para 15 of Part II of RFP) |
| 7 | Any other item such as transportation, insurance, freight, packing etc |
| 8 | Notes:1. Cost of item listed at Sl 1 and 2 are to be quoted in the respective rows of the price bid sheet. 2. Bidder NOT PERMITTED to include cost of items listed at Sl 3 to 7 with Sl 1 and 2 as lumpsum amount 3. Bidder required to mandatorily quote for Sl 1 and 2 failing which bid shall be treated as non bonafide and liable for rejection. 4. L1 will be determined based on all elements of costs including taxes and duties, etc.5. Any clarrifications contact to SO1(GP3) Phone No.9246036272 and Email ID: [email protected]. Bidders are mandatorily to quote GST/ Taxes as applicable against each serials, falling which bid shall be treated as non bonafide and liable for rejection. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender