Tender For maintenance Of electrical installation In Nrb At Chandigarh(Comprehensive Annual Maintenance Of Online Uninterrupted Power Supply Units Installed At Various Location In Honble Punjab And Haryana High Court, Sector-1, Chandigarh).(For The Y
Tender Overview
Project Description
Tender for maintenance Of electrical installation In Nrb At Chandigarh(Comprehensive Annual Maintenance Of Online Uninterrupted Power Supply Units Installed At Various Location In Honble Punjab And Haryana High Court, Sector-1, Chandigarh).(For The Year 2026-27)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Sep-2026 | Amendment | Technical Bid | 24-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing AMC for 5KVA (3Ph I/P-3Ph O/P) IGBT Online UPS with Isolation transformer with following specifications |
| 2 | Capacity 5KVA IGBT , isolation Tx, UPS, 60 min battery Backup.AC I/P 3Ph, 415V -20/+15%frequency 50HZ +/-10%O/P Voltage 415V AC three phase, 50HZ +/-0.01% (crystal controlled)Wave form SinewaveHarmonic Distortion Less than 3%Efficiency >93% for 192DCPower Factor 0.8laggingoverload 110% for 10 minute, 200% for 5cycleCrest factor >4:1Transient recovery Within 3 cycleprotection a)battery over load b) Battery under voltage, c) O/P AC over voltage d) O/P over load/ short circuitIndication Mains on, Load on battery, Battery low, inverter overload, load on mains,Battery boost, battery level graph, load level graph,Metering Digital meteringAmbient condition 0 degree C to 50 degree C, 95% RHMake: UnilineQTY 1 No. |
| 3 | Providing AMC for 10KVA (3Ph I/P-3Ph O/P) IGBT Online UPS with Isolation transformer with following specifications. |
| 4 | Capacity 10KVA IGBT , isolation Tx, UPS, 60 min battery Backup.AC I/P 3Ph, 415V -20% + 15%frequency 50HZ +/-10%O/P Voltage 415V AC three phase, 50HZ +/-0.01% (crystal controlled)Wave form SinewaveHarmonic Distortion Less than 3%Efficiency >93% for 192DCPower Factor 0.8laggingoverload 110% for 10 minute, 200% for 5cycleCrest factor >4:1 Transient recovery Within 3 cycleprotection a)battery over load b) Battery under voltage,c) O/P AC over voltage d) O/P over load/ short circuitIndication Mains on, Load on battery, Battery low, inverter overload, load on mains,Battery boost, battery level graph, load level graph,Metering Digital meteringAmbient condition 0 degree C to 50 degree C, 95% RHMake: UnilineQTY 4 Nos. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender