Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 11 days TDR #57558556

Tender For Hiring Of Agencies For Steel Gas Pipeline Laying Works For Sundargarh-Jharsuguda (Rourkela) & Puri-Ganjam-Nayagarh Ga Of Gail Gas Limited On 18 Month annual rate contract

Issued by Boards / Undertakings / PSU · Ghaziabad, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Oct 2026
11 days left
EMD
20 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ghaziabad → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Hiring Of Agencies For Steel Gas Pipeline Laying Works For Sundargarh-Jharsuguda (Rourkela) & Puri-Ganjam-Nayagarh Ga Of Gail Gas Limited On 18 Month annual rate contract

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 17-Sep-2026 Corrigendum 01 Technical Bid 08-Oct-2026

BOQ

Name of Work:- HIRING OF AGENCIES FOR STEEL GAS PIPELINE LAYING WORKS FOR SUNDARGARH-JHARSUGUDA (ROURKELA) & PURI-GANJAM-NAYAGARH GA OF GAIL GAS LIMITED ON 18 MONTH ARC
Sl. No. Item Description
1LAYING / INSTALLATION OF CARBON STEEL PIPELINES
2\\"Receiving and taking over\\" as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3-Layer PE coated and bare linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes as per specification wherever required depending on site condition including execution of all works, \\"taking over\\", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, arrangement of all additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:
3Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.
4Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading / cleaning of work area. Shifting of all obstruction within the ROU/ pipeline corridor as per Pipeline route alignment underground utilities viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. co-ordination with concerned authorities and obtain permissions from these authorities.
5Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and to the entire satisfaction of Owner / Engineer-in-charge.
6Trenching to all depths and to a width to accomodate the carrier pipeline and/or optical fiber cable/cable conduit during lowering by excavation in all types of soils, pebbels, cobbles, boulders, structures and all type of rockey strata including raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further, built-up surface of any type including tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The cover of pipeline shall be in between 1.0 meter to 1.5 meters depending upon site conditions and shall be measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ relevant code, whichever is higher]. Dewatering of trenches if required as per site condition. Padding & Backfilling of the trench after lowering the pipeline.However,Raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by manually or using pneumatic machine and tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine and proper placement of all tiles/ slabs/ paver block/ curb stones etc. removed during excavation shall be paid as separate items mentioned else where in the SOR.
7Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling.
8Stringing of line pipes along pipeline trench / ROU provided on sand/soft soil bags including all supplies, manpower & machinary etc.
9Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.
10Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing, dewatering, swabbing, drying etc. of complete pipeline, supply of required quantity of corrosion inhibitor, if required including pre-testing of designated sections complete as per specification and approved by Engineer–in–charge to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to Contractor (rectification of defects in linepipe material not attributable to contractor shall be paid separately as per other item of schedule of rate), re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by Engineer-in-Charge. For swabbing, a combination of low density and high density Pigs shall be carried out till acceptance of the swabbing criteria as per specification. For DRYING of the underground pipeline section length, purging of nitrogen or by blowing of dehumidified compressed air to be carried out till acceptance of Owner/PMC and make ready for Commissioning of pipeline section.
11Carrying out installation of carrier line pipe at all minor crossing viz. road, cart track, pathway, water bodies etc. at designated depth by open cut (except at crossing by HDD method & cased crossing).
12Coating of field weld joints, long radius bends (R=3D), elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per PJS & Technical Specification compatible with 3 layer PE coating material of the line pipe.
13Installation of LR Bend (R=3D) of material equivalent to pipe material grade (API 5L Grade X-52 to X-56) ) and of all size, all thickness, all angle etc. suitable to connect / fit with intended steel pipeline to be laid, as per specification and their complete Installation with steel pipeline network of all size & thickness as per specification wherever required depending on site condition.
14Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings including laying of HDPE duct and providing required padding over and around the pipeline with sand/graded material approved by Engineer-In-Charge (in rocky areas) including padding around pipeline with suitable soil duly approved by EIC including supply of padding material, backfilling and its compaction to the satisfaction of concerned authorities with excavated earth / borrowed select soil including supply of borrowed select soil duly approved by EIC before backfilling and make ready for restoration to be done by Owner / concerned authorities.
15Supply of warning mat in multiple lot based on site condition/requirement and their installation over the entire length of the pipeline laid in open-cut trench as per specification. Warning mat for pipeline shall be supplied as per the technical specification enclosed in the bid document. The material of warning mat shall be of high density polyethylene and non-biodegradable type. It shall have non-toxic and anti-rodent properties.
16Supply and installation of slope breakers, wherever required or, as directed by Onwer / Engineer–in–charge.
17Crossing of all-foreign pipeline / HT line / cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies and obtaining NOC.
18Installation of bank protection & associated works along with supply of all types of backfill materials etc. duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner / EIC.
19Training and diversions of streams in steep slope area, wherever required.
20Leak detection, its rectification and successfully re-hydrotesting shall be carried out by Contractor with a view that completion of all activity for successful hydrotesting is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting and leak detection if defects found attributable to Contractor.
21All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.
22Final clean-up & restoration of right-of-use or area disturbed by contractor including obtaining NOC from respective land owner and statutory authorities during their construction activities for laying of pipeline works and disposal of debris and returning all surplus material to designated disposal areas / storage yard as and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer–in–charge.However, restoration of Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Pavor block / Tiled / Bricklined including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction and shall be paid as seprate items mention else where in the SOR.
23Restoration of land, facilities and boundary wall etc. and associated facilities dismantled/damaged by the Contractor during construction.
24Installation of all burried valves ( for line Isolation Purpose) inside the valve pit/Chamber and making provision to operate the valve ( This is excluding the SV stations and Tapp-Off Points, however payment for the same shall be governed through relevant SOR item available else where in SOR)
25Protective coating of 1000 micron thick two component (applied with the help of minimum three coats) liquid epoxy including supply of materials duly approved by Owner for all piping valves, fittings, structural steels etc. for buried installation and inside the valve pit as approved by the Engineer-in-charge.
26Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning.
27Hook-up work with existing pipelines.
28Obtaining work permits/ NOC from various statutory authorities having jurisdiction, before and after execution of the work, and complying with all stipulation/conditions/recommendation of the said authorities;
29Preparation of as-built drawings, pipe-book and other records as specified in the specifications. SOR shall be read in conjuction with job specific requirements, specifications, standards, drawings and other provision of contract document. All above works related to line pipe laying and installation for buried pipeline are as per following details given below:
30PIPELINE LAYING BY OPEN CUT METHOD
31For all types of soil including pebbels, cobbles, boulders, structures, PCC/RCC/build up surface etc.
32100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
33Notes to 1.1
34This item shall be applicable for the underground steel grid main pipeline & branch pipeline including underground/aboveground tap-off for distribution pipelines, valves, barred tees, insulating joints, bends (R=3D), flanges & fittings, accessories etc. and including fabrication, NDT, Testing , tie-in of valve assembly including radiography of tie-in joints as per Schematic Layout Drawings and technical Specification alongwith aboveground approach pipeline upto Insulating Joint (including installation of aboveground / underground insulating joint) for various stations.
35Supply of all valves, flanges, fittings, assorted pipes, barred tees & insulating Joints, etc. shall be paid by separate item mentioned elsewhere in SOR.
36In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR.
37Contractor shall not perform any pipeline activities along ROU without specified barricading as per Std. Drg. and other safety measures.
38Proposed pipeline route is passing through MDR/ Asphalt Road / concrete roads (RCC/PCC) etc. However, in case of non-availability of Perission along MDR/ Asphalt Road / concrete roads (RCC/PCC) etc., the pipeline route may change and this may also require a new tap-off point at suitable location on Pipeline . This may cause increase / decrease in SOR quantities.
39The rates shall be applicable for all locations / region/ charge area within & around the quoted part of the GA/Region.
40The above rate is excluding of crossings by HDD, Boring, moiling, open cut conventional Method mentioned under separate item.
41In congested area trenching may be done manually for pipeline laying. Further Contractor shall ensure that no tree/plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/tree/OFC /water pipe line /telephone line/sewage line/electric cable and other under ground utilities.
42The quantities mentioned above are tentative and may increase or decrease depending upon the site conditions/requirements. Items except above are covered separately.
43For Tie-in and other locations wherein NDT through X-ray is not feasible NDT by Gamma ray shall be permitted with due permission of EIC.
44PIPELINE LAYING/INSTALLATION BY HDD
45Complete work of laying of pipeline in restricted ROU along with adjacent road/nala (if minor road/nala/ Branch road having ROW less than 15 Meters falling under the laying profile and not considered under separate crossing) by HDD method including \\"Receiving and taking over\\" owner supplied 3LPE coated line pipes from owner's designated place to issue/dump site(s) and transportation to contractor's stock yard/work site including all handling, loading, uploading, aligning etc. supply of all contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage. Execution of, but not limited to, following works in accordance with specifications and instruction of engineer-in-charge and as per all provision of Contract Document.
46Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.
47Drilling to required depth from top of ground (min 1.5 mtrs.)including maintenance of drill hole in all types of soil including pebbels, cobbles, boulders, structures etc. and all types of rocky starta, all depth to accommodate the pipeline at all conditions encountered by approved HDD methods for providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.
48Laying of the pipeline by the approved HDD method including pipeline string prepration, welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions), welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for laying etc.
49Backfilling of the ditch/trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.
50Gauging, pigging, Cleaning, Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.2 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities.
51Carrying out cleaning, gauging (if applicable), water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period / or as concern authority latest guideline ; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM.
52Installation/laying of Coated Line Pipes as per following details:
53For all type of Soil including pebbels, cobbles, boulders, structures etc.
54100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
55For all types of rocky starta
56100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
57Notes to 1.2:
58Pipeline length are tentative and for various crossings/site locations wherein laying through open cut is not feasible. Tenderer are advised to visit the site for actual assessment of extent of laying and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
59Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.
60Contractor shall not perform any pipeline activities along ROU without specified barricading as per Std. Drg. and other safety measures.
61For payment of laying of pipeline length in hard rock by HDD, complete HDD tie in length as per approved profile for Hard rock/Rocky Strata HDD based on soil investigation and lab analysis report shall be considered payable as per the rates of SOR on meeting the following conditions-a) The contractor to arrange to carrying out soil investigation and lab analysis report at a maximum span of 25 meters in normal case (or more as per direction of EIC in case site conditions does not allow span less than 25 meter) for establishing the hard rock/Rocky Strata HDD.b) The contractor shall deploy and use Rock cutting machine/Rock cutting diamond cutter tool /Requisite rock cutting tool and all other accessries as required to make drill hole in rocky starta/Hard rock for HDD. The cost of rock cutting tool, diamond cutter etc. and all other accessries are inclusive in the above item rate and no separate payment shall be made.
62Quantity indicated above is tentative. Execution of pipeline laying through HDD method in rocky strata shall be jointly recorded inline with soil report/physically checking of starta by approved methodlogy. However no additional payment on account of additional survey,finalization of type of soil starta shall be made to the contractor. In case of any dispute, deceision of EIC shall be final and binding to the Contractor.
63Contractor have to submit HDD profile drawing clearly indicating the type of soil starta along with approved survey report/ physical verified data ..etc for GAIL GAS/PMC approval.
64Bidder is advised to visit the site for actual assessment of extent of laying and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
65Crossing (by HDD Method) FOR RIVER, OTHER WATER BODIES, ROAD & RAILWAY
66Complete work for installation of carrier pipeline (between the ROW limits as per approved drawing) by HDD method including \\"Receiving and taking over\\" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading, aligning etc. supply of all Contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage., Execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document.
67Pre-construction survey, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.; obtaining historical data/ scour depth (for river) from concerned authority, if required, ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.For road crossings,pre-construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing drawings for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for the crossing as well as utility crossings (if any) encountered during crossing prior to start the execution of work.
68In case of water body crossings / minor RiverDrilling to the required depth on the banks and bed including maintenance of drill hole in all types of soil starta ( ie; soft/hard soil, soft/hard rock....etc), all depth to accommodate the pipeline at all conditions of the waterbody crossings by HDD methods for providing with minimum cover either(i) 1.5m below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For small rivers with rocky bed with profile length less than 250 metersor (ii) 2.5m below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For other rivers.or(iii) 1.5 m below the bed level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For minor waterbody crossings.and(iii) In addition to point (i) & (ii), In case of multiple combined X-ing i.e. river alongwith road/ drain, minimum cover requirement as per specification/ concerned authority for each type of x-ing has also to be fulfilled.However, for all crossings minimum cover requirements shall comply to specifications of concirmed authority.
69For road/rail crossings, carrying out pre-construction survey based on site visit, topographical survey, geotechnical investigation to establish bed strata upto sufficient depth, collection of data (if required) from concerned Authority including design and detail engineering and making of HDD Profile drawings for crossing and getting their approval from concerned Authority/ Engineer-in-charge including carrying out liasioning & co-odrination works for crossings as well as utility/foreign pipeline crossings (if any) and obtaining work permit/ NOC from concerned Authority prior to start the execution of work. Assistance in ROU opening & closing and their maintainence/ management both side of the crossings.
70In case of road crossing/SH/NH, drilling to required depth from top of road including maintenance of drill hole in all types of soil starta (i.e; soft/hard soil, soft/hard rock including boulder, pebbels / cobbels etc), all depth to accommodate the pipeline at all conditions encountered during road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.
71Laying of the carrier pipeline (for both water body and elevated road / rail / structure crossing) by the approved HDD method across the crossing including, strings preparation of carrier , welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions) welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing as per specification/ concern authority code or guideline etc.
72For road/rail crossings, carrying out pre-construction survey based on site visit, topographical survey, geotechnical investigation to establish bed strata upto sufficient depth, collection of data (if required) from concerned Authority including design and detail engineering and making of HDD Profile drawings for crossing and getting their approval from concerned Authority/ Engineer-in-charge including carrying out liasioning & co-odrination works for crossings as well as utility/foreign pipeline crossings (if any) and obtaining work permit/ NOC from concerned Authority prior to start the execution of work. Assistance in ROU opening & closing and their maintainence/ management both side of the crossings.
73Carrying out complete work for installation/pulling/insertion of pre tested and field joint coated carrier pipeline accross the crossings (between the ROW limits as per approved HDD profile drawing of crossings) by HDD method.Including digging of entry & exit pit as per requirement of work and design criteria.
74For waterbodies/river crossings: Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata, all depth to accommodate the pipeline at all conditions of the crossings as per approved HDD profile and providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.
75Backfilling of the ditch / trench including restoration, clean-up of area, disposal of drilling fluid & waste, etc. to the designated place with entire satisfaction of EIC/RCM/ Concerned Authority and getting NOC from concerned authority.
76Carrying out cleaning, gauging (if applicable), water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period / or as concern authority latest guideline ; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM.
77Pigging, Cleaning, Post installation hydrotest,dewatering, swabbing, drying and tie-in with pipeline at either banks etc. all other works including pigging, cleaning, final hydrotesting as per technical specification etc. alongwith mainline works required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document; getting NOC from all concerned authority of the facilities crossed.For swabbing, a combination of low density and high density Pigs shall be carried out till acceptance of the swabbing criteria as per specification. For DRYING of the underground pipeline section length, purging of nitrogen or by blowing of dehumidified compressed air to be carried out till acceptance of Owner/PMC and make ready for Commissioning of pipeline section.
78Gauging, pigging, Cleaning, Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.2 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities.
79Details of Crossings (For all types of soil including pebbels, cobbles, boulders, structures, PCC/RCC/build up surface etc. Except rocky Strata)
80Crossing of pipeline as per approved HDD profile with Tie In upto 100 metres
81Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
82Crossing of pipeline as per approved HDD profile with Tie Length more than 100 meters but less than equal to 250 meters
83Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
84Details of Crossings (For all types of rocky Strata)
85Crossing of pipeline as per approved HDD profile with Tie In upto 100 metres
86Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
87Crossing of pipeline as per approved HDD profile with Tie Length more than 100 meters but less than equal to 250 meters
88Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
89Crossing of pipeline as per approved HDD profile with Tie Length more than 250 meters but less than equal to 500 meters
90Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meterscrossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
91Notes to 1.3
92Crossing width may vary as per site condition. Bidders are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
93Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.
94The Contractor has to quote on running meter basis for X-ing. No any extra payment shall be made against this item.
95Width of above crossings indicated are tentative and for multiple crossings. This shall be as per requirement at site for crossing at different locations.
96Length of the individual crossing may increase or decrease depending upon site condition/requirement , accordingly HDD rig capacity may increase (w.r.t. rig capacity as mentined in tender document , if any ) and contractor shall deploy the same as per decision of EIC.
97For river crossings Geo-technical investigation , bore log data ,hydrological and hydrographical survey of crossings, as required shall be carriedout by the successful bidder and submit the data/report for the same for GAIL GAS LTD / PMC for Approval . Contractor shall submit design calculation and all construction (profile) drawings in line with approved survey data for GAIL GAS LTD /PMC for approval. Work shall start only after approval of the above. However PMC/CLIENT shall not be held responsible for the change of strata if found to be variable. Contractor may ascertain the bore hole data by taking random samples,obtain historical data/ scour depth (in case of river) from concerned authority ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing if they feel the necessity.
98Providing end seal at both ends as per specification is included in above rates
99For payment of laying of pipeline length in hard rock by HDD, complete HDD tie in length as per approved profile for Hard rock/Rocky Strata HDD based on soil investigation and lab analysis report shall be considered payable as per the rates of SOR on meeting the following conditions-a) The contractor to arrange to carrying out soil investigation and lab analysis report at a maximum span of 25 meters in normal case (or more as per direction of EIC in case site conditions does not allow span less than 25 meter) for establishing the hard rock/Rocky Strata HDD.b) The contractor shall deploy and use Rock cutting machine/Rock cutting diamond cutter tool /Requisite rock cutting tool and all other accessries as required to make drill hole in rocky starta/Hard rock for HDD. The cost of rock cutting tool, diamond cutter etc. and all other accessries are inclusive in the above item rate and no separate payment shall be made.
100RAKING UP OF BUILT-UP SURFACE / HARD SURFACE
101Raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further, built-up surface of any type including tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly.
102Specified dia Thk (mm) Material Coating Type Length of each pipe(mm) NB
103100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
104RESTORATION OF ROADS
105Restoration of Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Pavor block / Tiled / Bricklined including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness :
106Restoration of Asphalt / Bituminous road upto 10 cm thickness
107Restoration of Asphalt / Bituminous road beyond 10 cm and upto 30 cm thickness
108Restoration of Concrete / Metal road upto 10 cm thickness
109Restoration of Concrete / Metal road beyond 10 cm and upto 30 cm thickness
110Restoration of red stone road / pavement / pavor block / tiled / bricklined upto 4 inch thickness
111Restoration of red stone road / pavement / pavor block / tiled / bricklined beyond 4 inch and upto 8 inch thickness
112BORROWED SELECT SOIL FOR BACKFILLING
113Additional work over and above item 1.0 for supply of specified and approved quality of borrowed local soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete.
114CONTINUOUS CONCRETE COATING (FOR CS PIPES)
115Supply of all consumables, materials and application of 60 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-35 for 4'' NB Line Pipe and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe for following sizes :-
116Specified OD 114.3 mm x 6.4 mm W.T.
117WATER BODY (RIVER / CANAL) X-INGS (BY OPEN CUT CONVENTIONAL METHOD)
118Complete work for installation of carrier pipe (between the limits as defined in approved drawing) including \\"Receiving and taking over\\" owner supplied corrosion coated line pipes from owner's designated places of issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ worksite including all handling, loading, unloading, etc. supply of all Contractor supplied material to worksite(s) including consumables, manpower, other resources and acquiring the required land for storage, fabrication, access for Contractor etc. and execution of, but not limited to, following works in accordance with specifications and instructions of Engineer-in-charge and as per all provision of Contract Document.
119For waterbody crossings: Pre-construction survey , obtaining scour depth (for river) from concerned authority (if required), necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.
120Following data shall be obtained from concern authority/ local sources (for river) to finalise scour depth :-
121Past Historical flood level datas indicating HFL to determine highest flood level.
122River flow data including velocity of water flow.
123Necessary information regarding type of soil and strata underneath the river bed.
124Trenching to the required depth and a width on the banks and bed including maintenance of trench in all types of strata, all depth to a width to accommodate the pipeline at all conditions of the water crossings by various methods for providing with minimum cover over top of the pipe at all point across the maximum possible width of water bed (as per drawing) either 1.5 mtrs. below the predicted scour profile expected during the life time of the pipeline or 2.5 mtrs. below the available lowest firm bed (if scour profile/ depth not available) of the water crossing by ascertaining bed level upto 50 mtrs. both the side from crossing location or the actual depth as decided by concerned Authority/ Engineer-in-charge whichever is more.
125Strings preparation of pipes, welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions), welding repair and retest, coating of field joints with Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing etc.
126Final strings preparation of pipes as per approved drawing & specification or as decided by Engineer-in-charge depending on site condition, repair of coating damages,coating of field joints, etc. as per respective technical specification.
127Continuous concrete weight coating of thickness 60 mm , minimum density 2245 kg/m3 of mininum grade M-20 (nominal mix) and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification.
128Backfilling of the trench including supply and padding by select backfill as required: re-storation of banks to original condition duly accepted by Competent Authority and getting NOC from concerned authority, restoration of disturbed area and clean-up etc.
129Supply & installation of warning mat on the entire length of the pipeline as per specification, supply of warning mat for pipeline as per the technical specification enclosed in the bid document.The material of warning mat shall be of high density polyethylene and non biodegradable type. It shall have non-toxic and anti rodent properties.
130Details of Water Body Crossing
131Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala Crossings for carrier pipeline of size 100 mm NB x 6.4mm Thk. of API 5L Grade X-52
132Note: (i) Width of the crossing is tentative and vary as per site condition.Crossing drawings are attached along with tender document for reference. Bidders are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length shall be as per codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
133(ii) Final length of string & cover from top of pipe for each crossing shall be decided by concerned Authority/ Engineer-in-charge.
134(iii) Payment for the length of final tied-in carrier pipeline string with mainline made for crossing laid by open cut conventional method are inclusive in the above item rate and no separate payment shall be made under other clause mentioned elsewhere.
135(iv) Stablisation of disturbed Bed & Bank shall be carried out as per standard drawings or as per requirement of the concerned authority without any extra cost to the owner.
136REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)
137Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of \\"receiving and taking over\\" by Contractor in the presence of Engineer-in-charge.
138Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:
139Specified OD, mm
140114.3\\"
141Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:
142114.3\\"
143Note : Quantity indicated above is tentative and may increase/decrease or delete as per site requirement.
144REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)
145Repair of Holiday in Coating (Noted and recorded at the time of \\"receiving and taking over\\")
146Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area.
147Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.
148PERMANENT MARKERS
149Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.
150Pipeline RCC boundary / route marker as per drawing
151Pipeline warning plate markers with post & foundations as per drawing
152Pipeline direction marker with post & foundations
153Pipeline KM with post & foundations
154Navigable Waterway Markers
155Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.
156LEAK / BURST (ATTRIBUTABLE TO OWNER)
157All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner/ Engineer-in-charge (EIC)
158For 4\\" NB Line
159Note:(i)This rate is applicable for manufacturing defects in Owner supplied material only.(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
160COMMISSIONING OF ENTIRE UNDERGROUND PIPELINE LENGTH AND STATIONS
161Commissioning assistanceCommissioning assistance during commissioning for underground pipeline length and stations including supply of manpower, equipments, tools & tackles, required consumables (nitrogen reqiured for purging if any etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.
162For 4\\" NB Line
163Note:-The quantities mentioned above for various pipeline sections at different locations.
164IDLE TIME PRESERVATION OF PIPELINE
165Preservation of pipeline sections and associated facilities (in event of delay in ROU acquisition, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.
166By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.
167For 4\\" NB Line
168For every additional period of one month or part thereof
169For 4\\" NB Line
170Note:-i) The quantities mentioned above for various pipeline sections at different locations within & around the GA..ii) All accessrious ie;Two nos. of dished end caps and two nos tappings of 3/4 inches,PG to be considered per section and rate for the same are inclusive.iii) If month is partially complete, payment shall be made on prorata basis.
171DIGITIZATION OF RADIOGRAPHY FILMS:
172Carrying out digitization of all radiographic films (mainline and terminal piping) in the form of digital images (which can then be archived safely for long life and electronic retrieval) complying to all the legal local rules, codes and international standards.Submission of digital images of radiographic film along with compatible software in 6 sets of CD/DVD/Pendrive for electronic viewing /retreival.
173For 4\\" NB Line
174Note:-The quantities mentioned above for various pipeline sections at different locations within & around the GA..
175TRIAL PITS
176Excavation of trial pits on pipeline route (min Size 1.5 Mtr x 1.0 Mtr.) or any other Location as per instruction of engineer incharge in all kinds of underground strata up to existing laid pipeline without damaging pipe coating.Barricating the trial pit area including application of warning tape /warning sign around the trial pit till the necessary checking & backfilling of same as per direction of Engineer Incharge.Cleaning of excavated pipe & other underground facilities including supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. for carryout the reffered work as per directions of the Engineer-in-charge.
177NOTE:- Quantity mentioned above is for the various locations within the GA and may increase/decrease or not to be executed based on site requirement.
178Pipeline Laying Liasioning & Co-odrination (including utility crossing) and obtaining permission / NOC from the statuatory / concerned authorities. Assistance in ROU / Pipeline Route Alignment Corridor opening & closing and their maintainence/ management.
179Submitting request for (after obtaining the letter from client) permission , follow up , assisting in site inspections / route suevey / site report making/making site inspection drawings, submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and collecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation, District administration, River Authority,SEZ etc. Obtaining work permits /NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Assistance in required length and width/restricted width of ROU opening & closing and their maintainence/ management both side of the crossings.
180For 4\\" NB Line
181NOTE-(i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage.(ii) The total quantities mentioned against the above SOR items are applicable for the works carried out as mentioned above for laid, tested & commissioned or preserved with nitrogen main steel pipeline section and quantity mentioned against each SOR item is for multiple/various crossings at different locations within the GA.(iii) 90% payment for the above item shall be made only after the certified length of executed, tested & commissioned or preserved with nitrogen main steel pipeline section by Engineer–in–charge (EIC)/ RCM. Rest 10% payment will be made after acceptance of the system by Owner/PMC and after closure of contract.
182GENERAL NOTE FOR ALL ABOVE SOR ITEMS -(i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC.(ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, bidders are requested to quote such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC.(iii) Laying/ installation of pipeline along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of pipeline … etc within the Geographical Area (GA).(iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.
183TEMPORARY CATHODIC PROTECTION WORKS
184Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protection [TCP] system using galvanic anodes to protect the external surface of the entire steel pipeline network approximately 15 kM in length, against soil- side corrosion for minimum 2 years or till commissioning of permanent CP system whichever is later. All work shall be carried out conforming to the Scope of work, Design Basis, Data Sheets, standard specification,and vendor list attached and provisions of GCC, SCC including Technical specifications, OWNER/CONSULTANT approved survey report/design package, including all materials, equipment's, consumables, start up/commissioning spares etc. including transportation, storage of materials at site, manpower, in line with direction of Engineeer in-charge.
185Soil resistivity Survey & soil/water chemical analysis
186Measurement of soil resistivity along the right of way of the main pipeline (At 500mtr Interval at depth of 1.5M, 2.5M & 3.5M) & collection of additional data like foreign pipeline, details of existing CP systems and anode beds, DC/AC power sources and systems using earth return path such as HVDC substations/earthing stations, Crossing and parallel running of electrified railways, underground power cables and other elements that may interfere with the CP system as per standard specifications and scope of work and submission of report& applicable NACE standard incuding preperation of Design, detailed engineering, preparation of design document, preparation of Test station schedule & Bill of Material.
187Collection of soil & water samples along ROW at depth of 1M, 2M & 3M at every 5 km interval (Min 03 sample at each location) for its chemical & microbial analysis along the pipeline route as per specification for corrosion survey for detection of SRB, ARB & Total dissolved H2S etc.
188Supply & Installation of pre-packed Mg Anode (5 Kg) with FACTORY CRIMPED tail cable 1Cx10 Sq.mm Unarmoured cable (with sufficient length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. Howevever min one anode is to be installed at every one kM with test staion.
189Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 20 Kg) for HT Line crossing with one cable including 1Cx25 Sq.mm armoured cable (with sufficient length), encapsulation kit termination of Anode tail cable in the TLP etc.
190Supply and installation of Test lead Points (TLP/Test stations) Small Size (300mm X 275mm X 230mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.
191Supply and installation of Test lead Points (TLP/Test stations) Big Size (475mm X 420mm X 350mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.
192Cable to pipe connection by thermit welding for 25,10 ,6 sq.mm copper cable including excavation and exposing piping , recoating with epoxy, testing etc.
193Supply & Installation of 3.7kA @30 cycles solid state Polarization cell, to be installed in the vicinity of AC transmission lines.
194Supply and installation of Zn Ribbon anode (Dia min. 12x14 mm with back fill in trench) can also be used for the grounding purpose to get lower grounding resistance.
195Supply and installation of pre-packed Cu-wire AC mitigator wire of MATCOR make or equivalent can also be used for the grounding purpose to get lower grounding resistance.
196Supply & Installation of Surge Diverter for at Insulating Joint (10/350 µS = 100kA)
197Supply and installation of GI Pipe earth electrode of 65 mm dia, 4.5 mm thickness & 3000mm long and earth pit back fill as per standard drawing Earthing of above ground cathodically unprotected pipeline at IJ Locations. Maximum allowed earth resistance shall be 2 ohms.
198Supply and Instllation of GI Strip (50X6) mm
199Supply and Instllation of GI Strip (25X3) mm
200Supply and Installation of Copper Strip (25X3) mm
201Supply, installation, testing & commissioning of Polarisation coupons each of total area of 100mm x 100mm having one side exposed area of 10 mm x 10 mm shall be provided along the pipeline at marshy areas and at vulnerable locations to monitor the external corrosion activity on the pipeline as per enclosed standard specification. Location of external Polarisation coupons & Number of magnetic devices for operation of magnetic switch shall be decided during detail engineering. The works related to collection of approximately 2-5 m of pipeline material (In pieces of 300 to 1000mm length) for fabrication of Polarisation coupons is in the scope of the Contractor.
202Supplying, laying, termination, ferruling & testing of all the cables of TCP system, Cu-Conductor, XLPE insulated, PVC sheathed, Armoured/Unarmoured as required.
2031Cx6 mm2 Armoured
2041Cx10 mm2 Armoured
2051Cx25 mm2 Armoured
206Monitoring of the TCP system, on a monthly basis, till commissioning of the permanent cathodic protection system or closure of contract, whichever is earlier.
207PIPING & MECHANICAL WORKS
208PLANT PIPING FOR UNDERGROUND/ ABOVEGROUND INSTALLATION
2091. Transportation including loading, unloading & handling of all piping items ( pipes, fittings, flanges & valves are free issue itmes except studs & nuts (Hot dipped galvanized as per ASTM A 153 or Equivalent), gaskets ( metallic spiral wound 300#/150# rating) from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings, insulation joints and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications & scope of work, drawings, specification as per site requirement and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.2. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, couplings, caps, plugs, gasket, stud bolts, nuts, U Clamps etc. as required for completion of job.3. Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by Gamma-ray (for sizes 2\\" and above ) , and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.4. Fixing/ Installation of weldolets, sockolets, flanges, vent and drain point connection etc., including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required. 5. Erection including prior cleaning, lifting, supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, hook up with Steel / MDPE along with Transition fitting etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc.
2106. Preparation of final bill of material based on piping GADs and Preparation of isometric and fabrication drawings.7. Carrying out Non-destructive testing as required. NDT for 2'' & above shall be paid as per separate itmes mentioned elsewhere in the SOR.8. Surface preparation before application of primer by means of sand/Copper Slag blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.9. Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specification tender specification i.e., 1 coat of inorganic zinc silicate coating @65-75 micron DFT/coat + 2 coats of Chlorinated Rubber Zinc Phosphate Primer @40 micron DFT/coat + 2 coats of chlorinated rubber finish paint @ 40 micron DFT/coat, total 225 micron DFT including supply of approved paints and primers, application of primer and paints, identification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc10. Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.
21111. Precommissioning & making operational all piping system and equipments and provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.12. Clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue material to Owner's designated plac(s); completing all works in all respects as per the AFC drawing, specifications, standards and other provisions of Contract and instruction of Engineer-in-charge.13. Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.14. Hook-up works including making provision for hooking up and carrying out shutdown activities at terminals if necessary.15. Complete Carbon Steel Piping Work with painting including all fittings, Flanges and supply of all required gaskets, studs bolts & nuts etc. as described above as per Inch-dia.
212Complete Carbon Steel Piping Work with painting and installation including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under item 1.0 above
213ASTM A106, Gr. B (Charpy), Seamless, BE 4\\" NB
214ASTM A106, Gr. B (Charpy), Seamless, BE 2\\" NB
215ASTM A106, Gr. B, Seamless, PE 1.5\\" NB
216ASTM A106, Gr. B, Seamless, PE 1\\" NB
217ASTM A106, Gr. B, Seamless, PE ¾\\" NB
2181) Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this.2) All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. 3) All coupling, nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under erection rate.4) NDT of Joints below 2\\" is to be included in above rate. However, payment of radiography of joints (2\\" and above) shall be paid seperately under SOR item for RADIOGRAPHY mentioned elsewhere in this SOR.
219SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES
220Complete work of supply of pipes, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to, the following items in accordance with relevant specifications indicated in clause of SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.
221Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.
222CARBON STEEL PIPES
223ASTM A106, Gr. B (Charpy), Seamless, BE (For 6\\" NB), S80
224ASTM A106, Gr. B (Charpy), Seamless, BE (For 4\\" NB), S80
225ASTM A106, Gr. B (Charpy), Seamless, BE (For 2\\" NB), XS
226ASTM A106, Gr. B, Seamless, PE (For 1\\" NB) , XS
227ASTM A106, Gr. B, Seamless, PE (For¾\\" NB), S160
228FLANGES
229Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], (For 6\\"), 300#
230Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], (For 4\\"),300#
231Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], (For 2\\"),300#
232Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.11), (For ¾\\" ), 300#
233Blind Flanges
234Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), (For 6\\"), 300#
235Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), (For 4\\"), 300#
236Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), (For 2\\"), 300#
237Blind Flanges (B-16.5, A105, 125 AARH, RF), (For ¾\\" ), 300#
238Spectacle Blind , 125 AARH, RF,300#/150#, 2 \\"
239Spectacle Blind , 125 AARH, RF,300#/150# , 4''
240ELBOW
24190° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW, (For 4\\", S80)
24290° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW, (For 2\\", XS)
24345° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), (For 4\\", S80)
24445° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), (For 2\\", XS)
245Equal Tee (A234, Gr. WPB (Charpy), B-16.9), BW, Thickness match with pipe thickness ( For 4\\")
246Equal Tee (A234, Gr. WPB (Charpy), B-16.9),BW ,Thickness match with pipe thickness ( For 2\\")
247Unequal Tee (A234, Gr. WPB (Charpy), B-16.9), BW ,Thickness match with pipe thickness) (For 6\\" x 4\\")
248Unequal Tee (A234, Gr. WPB (Charpy), B-16.9), BW ,Thickness match with pipe thickness) (For 10\\" x 4\\")
249Unequal Tee (A234, Gr. WPB (Charpy), B-16.9), BW, Thickness match with pipe thickness) (For 4\\"x 2\\")
250SOCKOLET
251SOCKOLET (A105, MSS-SP, 6000#) ,6\\" x ¾\\" , ( Thk-S80 x S160)
252SOCKOLET (A105, MSS-SP, 6000#) ,4\\" x ¾\\" , ( Thk-S80 x S160)
253SOCKOLET (A105, , MSS-SP, 6000#) , 2\\" x ¾\\", ( Thk-XS x S160)
254BARRED TEE (As per Standard Specification and Data Sheets enclosed)
255BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,8\\" x 4\\"
256BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,6\\" x 4\\"
257BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,4\\" x 4\\"
258INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed)
259INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed) ,6\\" ,300#
260INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed) ,4\\" ,300#
261INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed) ,2\\" ,300#
262Reducer (A 234 Gr. WPB (Charpy), BW)
263Reducer (A 234 Gr. WPB (Charpy), BW), S80 x XS, ( For 4\\"x2\\")
264Note:i) All butt welded fittings end shall generally match with connecting pipe wall thickness however in case of misalignment Contractor shall have to do end preparation without any extra cost.
265ii) All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.
266Supply of Valves
267Complete work of supply of valves including all taxes,duties,transportation and inspection charges but not limited to ,the following items in accordance with relevant Specifications & relevant Data Sheets indicated in scope of work indicated in SCC, drawings, specification and instructions of EIC and as perall provisions of the CONTRACT DOCUMENT.
268Plug Valves
269Butt Welded End (As per PMS & Datasheet), 2\\",300#
270Supply of Ball Valves
2716\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
2724\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
2732\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
2743/4\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
2754\\" Ball Valve, Flange ended (FE) , Full bore (FB) , 300#
2762\\" Ball Valve, Flange ended (FE) , Full bore (FB) , 300#
277Note: i).Order for above items shall be placed only after approval from EIC. Refer data sheet & TS of Ball valves.ii). Quantities mentioned are tentative and may increase or decrease during execution of work depending upon site requirement. Contractor required to supply materials after assessing the site requirement and in multiple lot or as per Release Order/ Sub Purchase Order wise. All material either in multiple lot or as per Release Order/ Sub Purchase Order wise or as decided by EIC shall be supplied by bidder within the price.
278ERECTION OF VALVES ( As per P & ID )
279Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.
280Flanged/ Welded Valves (Full Bore/ Reduced Bore)
281Ball / Plug Valves,6\\",300#
282Ball / Plug Valves,4\\",300#
283Ball / Plug Valves,2\\",300#
284Sockolet Welded Valve
285(Ball / Plug / Valves),¾\\", 800#
286RADIOGRAPHY
287Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.
288Radiography by Gamma Rays,4\\"
289Radiography by Gamma Rays,2\\"
290FIELD INSTRUMENTS
291Supply of Pressure Gauges inclusive of supply of erection accessories as per data sheet.
292Installation, Calibration, Testing & Commissioning of Pressure Gauges inclusive of supply of necessary piping materials/tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing as per standard
293Supply of Miscellaneous items
294Pipeline locator as per specification indicated in the tender
295ERECTION OF SKIDS & OTHER EQUIPMENTS
296Handling, including lifting, transportation from Company's stores to Contractor's work-shop for fabrication or/ and to worksite for field fabrication, assembly of parts/ sub-assemblies, erection for all Metering skids/DRS/MRS/Compressors, equipments supplied by company above ground/ underground at all elevation/ depth, fixing of foundation bolts, welding wherever required, aligning, grouting, hooking-up, cleaning and flushing by water draining, drying by compressed air, providing all mountings, ancilliary, enabling works as required and completing in all respect as per drawings, specification and instruction of Engineer-in-charge. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, finish coat of painting including rub down & touch up of shop primer/ paint scrapping of shop primer/ paint and further their painting after application of primer as per specification, wherever required by Company. The Includes Shifting of DRS / MRS along with all accessories from Company's stores to the desired location including Loading, Unloading, Transportation and fixing by the fasteners on foundation with suitable capacity Hydra / Crane. Placing the DRS/ MRS on Foundation including aligning with Inlet / Outlet piping. Erection of all accessories of DRS / MRS such as Solar panels, Venting pipe, Junction box etc. Providing required Manpower during commissioning of DRS / MRS along with tools, tackles.
297MRS ( steel inlet) /DRS Skids (with empty weight upto 2 Ton along with accessories such as solpar panel, Venting Pipe, Junction box etc- DRS/ MRS skids of all types
298MRS ( steel inlet) /DRS Skids (with empty weight above 2 Ton & upto 6 TON i.e DRS of capacity ranging from 2500 SCMH to 10000 SCMH, DRS/ MRS skid of all types
299NOTES-1) Payment of above ground Piping fabrication works cover in above SOR items shall be paid under SOR item no. 18.0 (including its notes ) 2) The quantity mentioned against above SOR item are for multiple equipment having different weight and weight of each eqipment shall be maximum upto 10.0 MT. The each equipment shall be installed at different location within the GA.
300FIRE FIGHTING (Portable Extinguishers)
301Fire Fighting Equipment
302Supply, installation and commissioning of the following fire fighting equipment:
30375 kg capacity DCP type (trolley mounted)
30410 kg capacity DCP fire extinguisher (trolley mounted)
3054.5 kg capacity CO2 fire extinguisher (portable) as per IS:2878
3066 Nos. Sand Buckets with stand & canopy
307NOTE:1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of Engineer-in-charge. The unit rate shall be operated to work out the final payment to the contractor.
3082) In each area, quantities given against individual item may be utilise/ used for other consumer in same area.
3093) The rates shall be applicable for all underground/ aboveground piping system and associated stations/ terminals.
310Note:(i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC.(ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, rates are inclusive for such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC.(iii) Installation of all underground/ aboveground piping system along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of existing piping system … etc with in the Geographical Area (GA).(iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.
311CIVIL WORKS
312EARTH WORK IN EXCAVATION/ SITE GRADING AND BACKFILLING
313Earth work in excavation /site grading in all kinds of soil including soft rock in any plan dimension up to required depth including backfilling of excavated earth at any location in layers of 300mm and compacted up to 95% to its MDD at all heights and depths. Surplus and unserviceable earth shall be disposed up to any lead in all conditions. Soil to be levelled and neatly dressed complete in all respect as per scope of work, detailed construction drawings, technical specifications and direction of the Engineer-in-Charge.
314Note:-1. This Rate shall be applicable only for excavation which are not included as a part of respective SOR Item.2.The Contractor shall take into account the provision for excess excavation required for necessary working space, cutting in slopes etc., which may be required for excavation and other allied works and refilling the side slopes and working space in layers as per requirement.3.Rate to include cost of all labour, tools, tackles, equipment, hire charges, shoring, bailing and pumping out water as required etc. with all bye works and sundry works complete in all respects.4.NET CUM of excavated quantity in CUM shall be measured for payment.5. To be read in conjunction with Particular Job Specification.
315BRICK WORK
316Providing and laying brick work with brick class designation M-5.0 of IS:1077 in Cement Mortar 1:4 (1cement : 4 sand) in steps, load bearing structures, drains, or at any other location at all depths & height for all leads including providing required finishes, curing, scaffolding, etc., complete as per specifications and drawings with all bye-works as per direction of the Engineer-in-charge.
317Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, excavation, PCC M10, plastering with 15 mm thick cement plaster on exposed faces with 1:4 cement mortar( 1 cement : 4 Sand) , painting with bitumen etc. as per requirement with all bye-works and sundry works complete as per drawings.2. To be read in conjunction with Particular Job Specification.
318PLAIN CEMENT CONCRETE
319Supplying and laying plain cement concrete of grade M 10 with stone aggregate 40mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, mass concrete works, chambers, cable trench, under floors and any other locations, at all levels and locations (which are not covered as part of composite items) as per drawings, specifications and directions of the Engineer-in-charge.
320Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.
321REINFORCED CEMENT CONCRETE
322Providing and laying Reinforced Cement Concrete of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, beam, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall etc. including excavation, PCC M10 in mud mat, shuttering, construction joints, bitumen painting on surfaces in contact with soil,supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-in-charge.
323Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.
3241. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete.
3252. To be read in conjunction with Particular Job Specification.
326REINFORCEMENT STEEL
327Supplying and Fabricating and Fixing in position HYSD Steel Reinforcements/ TMT Grade Fe-415/Fe 500D conforming to IS1786-2008 at all levels and positions including the Cost of transportation, Straightening, Cutting, Bending, Cranking, Binding, Welding, Provision of necessary Chairs and Spacers, Preparation of bar bending schedule, getting the same approved by EIC etc., complete as per Drawings and Specifications and including Cost of binding wire, Labour etc., all complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. The Chairs and Spacer Bars provided will not be measured for payment.
328Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.3. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as steel Reinforcement, binding wire and other minor construction materials, testing etc. all bye works and sundry works. 4.Chairs, Laps, Spacers, Wastage etc. shall be to contractor's account.5.To be read in conjunction with Particular Job Specification.
329CONCRETE PAVEMENT
330Providing and laying reinforced cement concrete pavement 150 mm thick in M-25 grade with 20 mm and down grade crushed stone aggregate in pavement, including earthwork in excavation, preparation of base (i.e. compacted subgrade, 200 thk sand and 100 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen sand mix filler material etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.
331150mm thick in Pavements in Process Areas (Type - I)
332Note :-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, providing and fixing reinforcement steel, shuttering, earthwork in excavation and backfilling using serviceable earth in all conditions, preparation of base, etc. with all bye works and sundry works. Cost of works towards pipe supports & sleepers being raised from pavement is covered under respective RCC items.2. To be read in conjunction with Particular Job Specification.
333VALVE PITConstruction and handing over of RCC Valve Pit as per tender drawing, technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per tender drawing.
334RCC Valve pit of internal Dimensions 2.1m x1.5m: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
335RCC VALVE PIT - 2.0 m x 1.9 m with RCC cover: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects. Must be able to support a maximum load of 25 tons, its design has to be such as to allow top side to be filled with the same material as the surface, roadway of pavement (concrete, asphalt, slabs etc.). as per Drawing attached.
336RCC Valve pit of internal Dimensions 1.2m x1.5m: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
337RCC Valve pit of internal Dimensions 1 m x1 m: Construction and handing over of RCC Valve pit with steel cover /RCC cover as directed by engineer In charge including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
338STEEL STRUCTURAL WORKS
339Steel structure Fabrication
340Supplying, Fabricating & Erecting in position steel structures including single/double leaf gate fabricated out of MS Girders, channels, Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform, Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, etc. of any size/dia for required design including cutting, welding, bolting, hoisting, fixing in position, including application of one coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at site .The work is to be completed in all respect as per specification ,scope of work, detailed construction drawings and directions of the Engineer-in-charge.
341Note :[ Rate to include cost of all labour, nut, bolts, tools, tackles, hire charges royalties, levies, transportation, scrap value, gas cutting, welding, other consumables, paints, compressed air, water, electric power etc. all complete.]
342Providing and fixing Fencing Structure
343Supplying, fabricating & fixing steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per enclosed drawing, technical specifications,scope of works and directions of the Engineer-In-Charge.
344Fencing height 2.1m
345Fencing height 1.5m
346Notes: 1.The quantities indicated are estimated values and hence are approximate. Final payment will be made based on actual quantities to be certified by the Purchaser.2.The cost of MS bolts (permanent and service), washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants, etc., as required for the work are included in the rates.3.All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with 4.Time schedule, are inclusive in the rates5.All accessories like MS tower bolts, MS Pivot, MS Wheels, MS Tee section, locking arrangement etc. shall be measured by weight only.6.Contractor shall ensure proper alignment and smooth operation of Gate
347SUPPLY OF NITROGEN: Supply and assistance in Purging nitrogen for Existing U/G pipline system
348Purging of Nitrogen for existing underground pipeline network to the specified acceptance criteria before carrying out shutdown/hotwork, providing assistance during the complete duration of shutdown/hotwork operations for entire pipeline network system including supply of all equipment, man-power, consumables (including pigs & nitrogen required for purging/filling ) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-charge.
349Supply of Transition Fittings
350PE to CS of size 125DN x 4 inch
351PE to CS of size 63DN x 2 inch
352Supply of GI sleeve of medium grade as per instruction of the Engineer-In-Charge
353GI Sleeve - 4'' NB as per IS 1239
354GI Sleeve - 8'' NB as per IS 1239
355HOT TAPPING WORKS
356Arranging the approved specialised agency along with hot tapping machine with all its accessories, cutting tool etc. for hot tapping works, obtaining all permissions/ clearances/ permits from Owner/ concerned authorities, submitting all procedures for approval & obtaining approval there on prior to start of works, carrying out hot tapping works including installation of split tees & full bore ball valve with support on existing pipeline of 12\\", 10”, 8\\" 6\\" and 4\\" , supply and installation of Spectacle and blind (as per requirement) and construction of Valve pit post hot tapping installation. However, construction of Valve pit shall be paid separately as per respective item.Item also includes supply of all materials i.e. Full encirclement Split Tee ( ASTM A 234 GR.WPB (charpy) , Rating 300# , min. Sch 40 /6.4 mm thk x min. Sch 40/6.4 mm thk ), Full bore ball valves ( API 6D, Body & Ball material - A216 Gr.WCB/A234 Gr.WPB (Charpy) , Stem material- AISI 4140 , Rating- 300#, Ends--One side BW other side flanged, Full bore), Galvanized studs and nuts, metallic gaskets and all associated accessories as per specification . Approval to be obtained for specialised agency to carry out the Hot-tapping who has prior experience in carrying out Hot-tapping. The item also includes, identifying the depth and cover existing pipeline at the prescribed location, excavation, Consumables for welding & testing requirements, tools, tackles, skilled and unskilled manpower, safety and firefighting system etc, carrying out NDT i.,e (i) UT check to measure the actual thickness & laminations check of run pipe, (ii) DPT testing root run welding for both longitudinal & circumferential root welding, (iii) Magnetic particle testing after completion of entire welding to check discontinuities such as cracking, porosity on surface & sub-surface and Hydrostatic testing for fitting , valve & tapping machine assembly and carrying out all works as per the requirements of specification, other provisions of contract document and instructions of Engineer-in-charge. Final restoration of area to its original to the entire satisfaction of Engineer-in-charge.
357Run Pipe NB (Inches) x Branch Pipe NB (Inches)
3588\\" x 4\\" (With Split Tee) (300#)
3594\\"x2\\" (With Split Tee) (300#)
360NOTE- Quantity mentioned above is for the various locations on charged pipelines within the GA and may increase/decrease or not to be executed based on site requirement.
361HOT WORK
362Complete shutdown work required for interconnection with existing underground pipelines including fabrication of piping section having the portion of run pipes of 8''/4\\" NB, Tees , Elbow, Bend etc with branch pipe of 8\\"/6\\"/4\\"/2 NB size as instructed by EIC(total fabricated length shall not be increasing by 6 mtrs) , welding , NDT, Coating , cleaning with Air , Excavation of Pit , back filling, restoration of Pit , removal of coating from line pipes including run pipe/s , re-coating etc for hooking up of 8\\"/6\\"/4\\"/2\\" NB line pipe. supply of required quantity of nitrogen for purging till acceptance of PMC/Owner and used for other activities for main line / Run pipe of 8''/4\\" NB as per instruction of Engineer In Charge . Other wokrs which are required additionally will be paid as per seperate SOR mentioned else where.
363For 10\\" NB Line
364For 8\\" NB Line
365For 4\\" NB Line
366NOTE-1. Quantity mentioned above is for the various locations within the GA and may increase/decrease or not to be executed based on site requirement.2. Above item covers all work required to be complete the hot work including supply of nitrogen as per requirement.
367LAYING / INSTALLATION OF CARBON STEEL PIPELINES
368\\"Receiving and taking over\\" as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3-Layer PE coated and bare linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes as per specification wherever required depending on site condition including execution of all works, \\"taking over\\", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, arrangement of all additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:
369Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.
370Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading / cleaning of work area. Shifting of all obstruction within the ROU/ pipeline corridor as per Pipeline route alignment underground utilities viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. co-ordination with concerned authorities and obtain permissions from these authorities.
371Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and to the entire satisfaction of Owner / Engineer-in-charge.
372Trenching to all depths and to a width to accomodate the carrier pipeline and/or optical fiber cable/cable conduit during lowering by excavation in all types of soils, pebbels, cobbles, boulders, structures and all type of rockey strata including raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further, built-up surface of any type including tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The cover of pipeline shall be in between 1.0 meter to 1.5 meters depending upon site conditions and shall be measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ relevant code, whichever is higher]. Dewatering of trenches if required as per site condition. Padding & Backfilling of the trench after lowering the pipeline.However,Raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by manually or using pneumatic machine and tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine and proper placement of all tiles/ slabs/ paver block/ curb stones etc. removed during excavation shall be paid as separate items mentioned else where in the SOR.
373Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling.
374Stringing of line pipes along pipeline trench / ROU provided on sand/soft soil bags including all supplies, manpower & machinary etc.
375Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.
376Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing, dewatering, swabbing, drying etc. of complete pipeline, supply of required quantity of corrosion inhibitor, if required including pre-testing of designated sections complete as per specification and approved by Engineer–in–charge to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to Contractor (rectification of defects in linepipe material not attributable to contractor shall be paid separately as per other item of schedule of rate), re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by Engineer-in-Charge. For swabbing, a combination of low density and high density Pigs shall be carried out till acceptance of the swabbing criteria as per specification. For DRYING of the underground pipeline section length, purging of nitrogen or by blowing of dehumidified compressed air to be carried out till acceptance of Owner/PMC and make ready for Commissioning of pipeline section.
377Carrying out installation of carrier line pipe at all minor crossing viz. road, cart track, pathway, water bodies etc. at designated depth by open cut (except at crossing by HDD method & cased crossing).
378Coating of field weld joints, long radius bends (R=3D), elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per PJS & Technical Specification compatible with 3 layer PE coating material of the line pipe.
379Installation of LR Bend (R=3D) of material equivalent to pipe material grade (API 5L Grade X-52 to X-56) ) and of all size, all thickness, all angle etc. suitable to connect / fit with intended steel pipeline to be laid, as per specification and their complete Installation with steel pipeline network of all size & thickness as per specification wherever required depending on site condition.
380Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings including laying of HDPE duct and providing required padding over and around the pipeline with sand/graded material approved by Engineer-In-Charge (in rocky areas) including padding around pipeline with suitable soil duly approved by EIC including supply of padding material, backfilling and its compaction to the satisfaction of concerned authorities with excavated earth / borrowed select soil including supply of borrowed select soil duly approved by EIC before backfilling and make ready for restoration to be done by Owner / concerned authorities.
381Supply of warning mat in multiple lot based on site condition/requirement and their installation over the entire length of the pipeline laid in open-cut trench as per specification. Warning mat for pipeline shall be supplied as per the technical specification enclosed in the bid document. The material of warning mat shall be of high density polyethylene and non-biodegradable type. It shall have non-toxic and anti-rodent properties.
382Supply and installation of slope breakers, wherever required or, as directed by Onwer / Engineer–in–charge.
383Crossing of all-foreign pipeline / HT line / cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies and obtaining NOC.
384Installation of bank protection & associated works along with supply of all types of backfill materials etc. duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner / EIC.
385Training and diversions of streams in steep slope area, wherever required.
386Leak detection, its rectification and successfully re-hydrotesting shall be carried out by Contractor with a view that completion of all activity for successful hydrotesting is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting and leak detection if defects found attributable to Contractor.
387All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.
388Final clean-up & restoration of right-of-use or area disturbed by contractor including obtaining NOC from respective land owner and statutory authorities during their construction activities for laying of pipeline works and disposal of debris and returning all surplus material to designated disposal areas / storage yard as and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer–in–charge.However, restoration of Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Pavor block / Tiled / Bricklined including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction and shall be paid as seprate items mention else where in the SOR.
389Restoration of land, facilities and boundary wall etc. and associated facilities dismantled/damaged by the Contractor during construction.
390Installation of all burried valves ( for line Isolation Purpose) inside the valve pit/Chamber and making provision to operate the valve ( This is excluding the SV stations and Tapp-Off Points, however payment for the same shall be governed through relevant SOR item available else where in SOR)
391Protective coating of 1000 micron thick two component (applied with the help of minimum three coats) liquid epoxy including supply of materials duly approved by Owner for all piping valves, fittings, structural steels etc. for buried installation and inside the valve pit as approved by the Engineer-in-charge.
392Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning.
393Hook-up work with existing pipelines.
394Obtaining work permits/ NOC from various statutory authorities having jurisdiction, before and after execution of the work, and complying with all stipulation/conditions/recommendation of the said authorities;
395Preparation of as-built drawings, pipe-book and other records as specified in the specifications. SOR shall be read in conjuction with job specific requirements, specifications, standards, drawings and other provision of contract document. All above works related to line pipe laying and installation for buried pipeline are as per following details given below:
396PIPELINE LAYING BY OPEN CUT METHOD
397For all types of soil including pebbels, cobbles, boulders, structures, PCC/RCC/build up surface etc.
398150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
399100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
400For all types of rocky starta
401150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
402100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
403Notes to 1.1
404This item shall be applicable for the underground steel grid main pipeline & branch pipeline including underground/aboveground tap-off for distribution pipelines, valves, barred tees, insulating joints, bends (R=3D), flanges & fittings, accessories etc. and including fabrication, NDT, Testing , tie-in of valve assembly including radiography of tie-in joints as per Schematic Layout Drawings and technical Specification alongwith aboveground approach pipeline upto Insulating Joint (including installation of aboveground / underground insulating joint) for various stations.
405Supply of all valves, flanges, fittings, assorted pipes, barred tees & insulating Joints, etc. shall be paid by separate item mentioned elsewhere in SOR.
406In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR.
407Contractor shall not perform any pipeline activities along ROU without specified barricading as per Std. Drg. and other safety measures.
408Proposed pipeline route is passing through MDR/ Asphalt Road / concrete roads (RCC/PCC) etc. However, in case of non-availability of Perission along MDR/ Asphalt Road / concrete roads (RCC/PCC) etc., the pipeline route may change and this may also require a new tap-off point at suitable location on Pipeline . This may cause increase / decrease in SOR quantities.
409The rates shall be applicable for all locations / region/ charge area within & around the quoted part of the GA/Region.
410The above rate is excluding of crossings by HDD, Boring, moiling, open cut conventional Method mentioned under separate item.
411In congested area trenching may be done manually for pipeline laying. Further Contractor shall ensure that no tree/plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/tree/OFC /water pipe line /telephone line/sewage line/electric cable and other under ground utilities.
412The quantities mentioned above are tentative and may increase or decrease depending upon the site conditions/requirements. Items except above are covered separately.
413For Tie-in and other locations wherein NDT through X-ray is not feasible NDT by Gamma ray shall be permitted with due permission of EIC.
414Payment items above under Rocky strata shall be made wherever hard rock of single piece exceeding 1.5 meter in any direction within the trecnch dimension with respect to length, width & depth and removal only by pneumatic chisel/ drill/ rock-breaker.Trenching in rockey starta shall be done by rock breaking tool / rock hammer. Supply and installation of rock shield as per specification including padding through sand / soft soil shall be done as per diection of EIC. Bidder to quote accordingly.
415PIPELINE LAYING/INSTALLATION BY HDD
416Complete work of laying of pipeline in restricted ROU along with adjacent road/nala (if minor road/nala/ Branch road having ROW less than 15 Meters falling under the laying profile and not considered under separate crossing) by HDD method including \\"Receiving and taking over\\" owner supplied 3LPE coated line pipes from owner's designated place to issue/dump site(s) and transportation to contractor's stock yard/work site including all handling, loading, uploading, aligning etc. supply of all contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage. Execution of, but not limited to, following works in accordance with specifications and instruction of engineer-in-charge and as per all provision of Contract Document.
417Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.
418Drilling to required depth from top of ground (min 1.5 mtrs.)including maintenance of drill hole in all types of soil including pebbels, cobbles, boulders, structures etc. and all types of rocky starta, all depth to accommodate the pipeline at all conditions encountered by approved HDD methods for providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.
419Laying of the pipeline by the approved HDD method including pipeline string prepration, welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions), welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for laying etc.
420Backfilling of the ditch/trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.
421Gauging, pigging, Cleaning, Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.2 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities.
422Carrying out cleaning, gauging (if applicable), water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period / or as concern authority latest guideline ; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM.
423Installation/laying of Coated Line Pipes as per following details:
424For all type of Soil including pebbels, cobbles, boulders, structures etc.
425150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
426100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
427For all types of rocky starta
428150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
429100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
430Notes to 1.2:
431Pipeline length are tentative and for various crossings/site locations wherein laying through open cut is not feasible. Tenderer are advised to visit the site for actual assessment of extent of laying and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
432Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.
433Contractor shall not perform any pipeline activities along ROU without specified barricading as per Std. Drg. and other safety measures.
434For payment of laying of pipeline length in hard rock by HDD, complete HDD tie in length as per approved profile for Hard rock/Rocky Strata HDD based on soil investigation and lab analysis report shall be considered payable as per the rates of SOR on meeting the following conditions-a) The contractor to arrange to carrying out soil investigation and lab analysis report at a maximum span of 25 meters in normal case (or more as per direction of EIC in case site conditions does not allow span less than 25 meter) for establishing the hard rock/Rocky Strata HDD.b) The contractor shall deploy and use Rock cutting machine/Rock cutting diamond cutter tool /Requisite rock cutting tool and all other accessries as required to make drill hole in rocky starta/Hard rock for HDD. The cost of rock cutting tool, diamond cutter etc. and all other accessries are inclusive in the above item rate and no separate payment shall be made.
435Quantity indicated above is tentative. Execution of pipeline laying through HDD method in rocky strata shall be jointly recorded inline with soil report/physically checking of starta by approved methodlogy. However no additional payment on account of additional survey,finalization of type of soil starta shall be made to the contractor. In case of any dispute, deceision of EIC shall be final and binding to the Contractor.
436Contractor have to submit HDD profile drawing clearly indicating the type of soil starta along with approved survey report/ physical verified data ..etc for GAIL GAS/PMC approval.
437Bidder is advised to visit the site for actual assessment of extent of laying and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
438Crossing (by HDD Method) FOR RIVER, OTHER WATER BODIES, ROAD & RAILWAY
439Complete work for installation of carrier pipeline (between the ROW limits as per approved drawing) by HDD method including \\"Receiving and taking over\\" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading, aligning etc. supply of all Contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage., Execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document.
440Pre-construction survey, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.; obtaining historical data/ scour depth (for river) from concerned authority, if required, ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.For road crossings,pre-construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing drawings for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for the crossing as well as utility crossings (if any) encountered during crossing prior to start the execution of work.
441In case of water body crossings / minor RiverDrilling to the required depth on the banks and bed including maintenance of drill hole in all types of soil starta ( ie; soft/hard soil, soft/hard rock....etc), all depth to accommodate the pipeline at all conditions of the waterbody crossings by HDD methods for providing with minimum cover either(i) 1.5m below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For small rivers with rocky bed with profile length less than 250 metersor (ii) 2.5m below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For other rivers.or(iii) 1.5 m below the bed level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For minor waterbody crossings.and(iii) In addition to point (i) & (ii), In case of multiple combined X-ing i.e. river alongwith road/ drain, minimum cover requirement as per specification/ concerned authority for each type of x-ing has also to be fulfilled.However, for all crossings minimum cover requirements shall comply to specifications of concirmed authority.
442For road/rail crossings, carrying out pre-construction survey based on site visit, topographical survey, geotechnical investigation to establish bed strata upto sufficient depth, collection of data (if required) from concerned Authority including design and detail engineering and making of HDD Profile drawings for crossing and getting their approval from concerned Authority/ Engineer-in-charge including carrying out liasioning & co-odrination works for crossings as well as utility/foreign pipeline crossings (if any) and obtaining work permit/ NOC from concerned Authority prior to start the execution of work. Assistance in ROU opening & closing and their maintainence/ management both side of the crossings.
443In case of road crossing/SH/NH, drilling to required depth from top of road including maintenance of drill hole in all types of soil starta (i.e; soft/hard soil, soft/hard rock including boulder, pebbels / cobbels etc), all depth to accommodate the pipeline at all conditions encountered during road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.
444Laying of the carrier pipeline (for both water body and elevated road / rail / structure crossing) by the approved HDD method across the crossing including, strings preparation of carrier , welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions) welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing as per specification/ concern authority code or guideline etc.
445For road/rail crossings, carrying out pre-construction survey based on site visit, topographical survey, geotechnical investigation to establish bed strata upto sufficient depth, collection of data (if required) from concerned Authority including design and detail engineering and making of HDD Profile drawings for crossing and getting their approval from concerned Authority/ Engineer-in-charge including carrying out liasioning & co-odrination works for crossings as well as utility/foreign pipeline crossings (if any) and obtaining work permit/ NOC from concerned Authority prior to start the execution of work. Assistance in ROU opening & closing and their maintainence/ management both side of the crossings.
446Carrying out complete work for installation/pulling/insertion of pre tested and field joint coated carrier pipeline accross the crossings (between the ROW limits as per approved HDD profile drawing of crossings) by HDD method.Including digging of entry & exit pit as per requirement of work and design criteria.
447For waterbodies/river crossings: Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata, all depth to accommodate the pipeline at all conditions of the crossings as per approved HDD profile and providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.
448Backfilling of the ditch / trench including restoration, clean-up of area, disposal of drilling fluid & waste, etc. to the designated place with entire satisfaction of EIC/RCM/ Concerned Authority and getting NOC from concerned authority.
449Carrying out cleaning, gauging (if applicable), water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period / or as concern authority latest guideline ; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM.
450Pigging, Cleaning, Post installation hydrotest,dewatering, swabbing, drying and tie-in with pipeline at either banks etc. all other works including pigging, cleaning, final hydrotesting as per technical specification etc. alongwith mainline works required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document; getting NOC from all concerned authority of the facilities crossed.For swabbing, a combination of low density and high density Pigs shall be carried out till acceptance of the swabbing criteria as per specification. For DRYING of the underground pipeline section length, purging of nitrogen or by blowing of dehumidified compressed air to be carried out till acceptance of Owner/PMC and make ready for Commissioning of pipeline section.
451Gauging, pigging, Cleaning, Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.2 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities.
452Details of Crossings (For all types of soil including pebbels, cobbles, boulders, structures, PCC/RCC/build up surface etc. Except rocky Strata)
453Crossing of pipeline as per approved HDD profile with Tie In upto 100 metres
454Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 150 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
455Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
456Crossing of pipeline as per approved HDD profile with Tie Length more than 100 meters but less than equal to 250 meters
457Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 150 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
458Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil) Except rocky Strata
459Crossing of pipeline as per approved HDD profile with Tie Length more than 250 meters but less than equal to 500 meters
460Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meterscrossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of under ground strata (including soft/hard soil ) Except rocky Strata
461Details of Crossings (For all types of rocky Strata)
462Crossing of pipeline as per approved HDD profile with Tie In upto 100 metres
463Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 150 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
464Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
465Crossing of pipeline as per approved HDD profile with Tie Length more than 100 meters but less than equal to 250 meters
466Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / Minor River / Nala / NH / SH / MDR / RAIL etc. having ROW more than 15 meters crossings for carrier pipeline of size 100 NB x 6.4mm Thk. of API 5L Grade X - 52 in all type of rocky strata
467Notes to 1.3
468Crossing width may vary as per site condition. Bidders are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
469Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.
470The Contractor has to quote on running meter basis for X-ing. No any extra payment shall be made against this item.
471Width of above crossings indicated are tentative and for multiple crossings. This shall be as per requirement at site for crossing at different locations.
472Length of the individual crossing may increase or decrease depending upon site condition/requirement , accordingly HDD rig capacity may increase (w.r.t. rig capacity as mentined in tender document , if any ) and contractor shall deploy the same as per decision of EIC.
473For river crossings Geo-technical investigation , bore log data ,hydrological and hydrographical survey of crossings, as required shall be carriedout by the successful bidder and submit the data/report for the same for GAIL GAS LTD / PMC for Approval . Contractor shall submit design calculation and all construction (profile) drawings in line with approved survey data for GAIL GAS LTD /PMC for approval. Work shall start only after approval of the above. However PMC/CLIENT shall not be held responsible for the change of strata if found to be variable. Contractor may ascertain the bore hole data by taking random samples,obtain historical data/ scour depth (in case of river) from concerned authority ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing if they feel the necessity.
474Providing end seal at both ends as per specification is included in above rates
475For payment of laying of pipeline length in hard rock by HDD, complete HDD tie in length as per approved profile for Hard rock/Rocky Strata HDD based on soil investigation and lab analysis report shall be considered payable as per the rates of SOR on meeting the following conditions-a) The contractor to arrange to carrying out soil investigation and lab analysis report at a maximum span of 25 meters in normal case (or more as per direction of EIC in case site conditions does not allow span less than 25 meter) for establishing the hard rock/Rocky Strata HDD.b) The contractor shall deploy and use Rock cutting machine/Rock cutting diamond cutter tool /Requisite rock cutting tool and all other accessries as required to make drill hole in rocky starta/Hard rock for HDD. The cost of rock cutting tool, diamond cutter etc. and all other accessries are inclusive in the above item rate and no separate payment shall be made.
476RAKING UP OF BUILT-UP SURFACE / HARD SURFACE
477Raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further, built-up surface of any type including tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly.
478Specified dia Thk (mm) Material Coating Type Length of each pipe(mm) NB
479150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
480100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
481RESTORATION OF ROADS
482Restoration of Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Pavor block / Tiled / Bricklined including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness :
483Restoration of Asphalt / Bituminous road upto 10 cm thickness
484Restoration of Asphalt / Bituminous road beyond 10 cm and upto 30 cm thickness
485Restoration of Concrete / Metal road upto 10 cm thickness
486Restoration of Concrete / Metal road beyond 10 cm and upto 30 cm thickness
487Restoration of red stone road / pavement / pavor block / tiled / bricklined upto 4 inch thickness
488Restoration of red stone road / pavement / pavor block / tiled / bricklined beyond 4 inch and upto 8 inch thickness
489BORROWED SELECT SOIL FOR BACKFILLING
490Additional work over and above item 1.0 for supply of specified and approved quality of borrowed local soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete.
491CONTINUOUS CONCRETE COATING (FOR CS PIPES)
492Supply of all consumables, materials and application of 60 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-35 for 4'' NB Line Pipe and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe for following sizes :-
493Specified OD 114.3 mm x 6.4 mm W.T.
494WATER BODY (RIVER / CANAL) X-INGS (BY OPEN CUT CONVENTIONAL METHOD)
495Complete work for installation of carrier pipe (between the limits as defined in approved drawing) including \\"Receiving and taking over\\" owner supplied corrosion coated line pipes from owner's designated places of issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ worksite including all handling, loading, unloading, etc. supply of all Contractor supplied material to worksite(s) including consumables, manpower, other resources and acquiring the required land for storage, fabrication, access for Contractor etc. and execution of, but not limited to, following works in accordance with specifications and instructions of Engineer-in-charge and as per all provision of Contract Document.
496For waterbody crossings: Pre-construction survey , obtaining scour depth (for river) from concerned authority (if required), necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.
497Following data shall be obtained from concern authority/ local sources (for river) to finalise scour depth :-
498Past Historical flood level datas indicating HFL to determine highest flood level.
499River flow data including velocity of water flow.
500Necessary information regarding type of soil and strata underneath the river bed.
501Trenching to the required depth and a width on the banks and bed including maintenance of trench in all types of strata, all depth to a width to accommodate the pipeline at all conditions of the water crossings by various methods for providing with minimum cover over top of the pipe at all point across the maximum possible width of water bed (as per drawing) either 1.5 mtrs. below the predicted scour profile expected during the life time of the pipeline or 2.5 mtrs. below the available lowest firm bed (if scour profile/ depth not available) of the water crossing by ascertaining bed level upto 50 mtrs. both the side from crossing location or the actual depth as decided by concerned Authority/ Engineer-in-charge whichever is more.
502Strings preparation of pipes, welding, testing, 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions), welding repair and retest, coating of field joints with Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing etc.
503Final strings preparation of pipes as per approved drawing & specification or as decided by Engineer-in-charge depending on site condition, repair of coating damages,coating of field joints, etc. as per respective technical specification.
504Continuous concrete weight coating of thickness 60 mm , minimum density 2245 kg/m3 of mininum grade M-20 (nominal mix) and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification.
505Backfilling of the trench including supply and padding by select backfill as required: re-storation of banks to original condition duly accepted by Competent Authority and getting NOC from concerned authority, restoration of disturbed area and clean-up etc.
506Supply & installation of warning mat on the entire length of the pipeline as per specification, supply of warning mat for pipeline as per the technical specification enclosed in the bid document.The material of warning mat shall be of high density polyethylene and non biodegradable type. It shall have non-toxic and anti rodent properties.
507Details of Water Body Crossing
508Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala Crossings for carrier pipeline of size 100 mm NB x 6.4mm Thk. of API 5L Grade X-52
509Note: (i) Width of the crossing is tentative and vary as per site condition.Crossing drawings are attached along with tender document for reference. Bidders are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length shall be as per codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.
510(ii) Final length of string & cover from top of pipe for each crossing shall be decided by concerned Authority/ Engineer-in-charge.
511(iii) Payment for the length of final tied-in carrier pipeline string with mainline made for crossing laid by open cut conventional method are inclusive in the above item rate and no separate payment shall be made under other clause mentioned elsewhere.
512(iv) Stablisation of disturbed Bed & Bank shall be carried out as per standard drawings or as per requirement of the concerned authority without any extra cost to the owner.
513REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)
514Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of \\"receiving and taking over\\" by Contractor in the presence of Engineer-in-charge.
515Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:
516Specified OD, mm
517114.3\\"
518Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:
519114.3\\"
520Note : Quantity indicated above is tentative and may increase/decrease or delete as per site requirement.
521REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)
522Repair of Holiday in Coating (Noted and recorded at the time of \\"receiving and taking over\\")
523Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area.
524Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.
525PERMANENT MARKERS
526Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.
527Pipeline RCC boundary / route marker as per drawing
528Pipeline warning plate markers with post & foundations as per drawing
529Pipeline direction marker with post & foundations
530Pipeline KM with post & foundations
531Navigable Waterway Markers
532Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.
533LEAK / BURST (ATTRIBUTABLE TO OWNER)
534All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner/ Engineer-in-charge (EIC)
535For 6\\" NB Line
536For 4\\" NB Line
537Note:(i)This rate is applicable for manufacturing defects in Owner supplied material only.(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
538COMMISSIONING OF ENTIRE UNDERGROUND PIPELINE LENGTH AND STATIONS
539Commissioning assistanceCommissioning assistance during commissioning for underground pipeline length and stations including supply of manpower, equipments, tools & tackles, required consumables (nitrogen reqiured for purging if any etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.
540For 6\\" NB Line
541For 4\\" NB Line
542Note:-The quantities mentioned above for various pipeline sections at different locations.
543IDLE TIME PRESERVATION OF PIPELINE
544Preservation of pipeline sections and associated facilities (in event of delay in ROU acquisition, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.
545By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.
546For 6\\" NB Line
547For 4\\" NB Line
548For every additional period of one month or part thereof
549For 6\\" NB Line
550For 4\\" NB Line
551Note:-i) The quantities mentioned above for various pipeline sections at different locations within & around the GA..ii) All accessrious ie;Two nos. of dished end caps and two nos tappings of 3/4 inches,PG to be considered per section and rate for the same are inclusive.iii) If month is partially complete, payment shall be made on prorata basis.
552DIGITIZATION OF RADIOGRAPHY FILMS:
553Carrying out digitization of all radiographic films (mainline and terminal piping) in the form of digital images (which can then be archived safely for long life and electronic retrieval) complying to all the legal local rules, codes and international standards.Submission of digital images of radiographic film along with compatible software in 6 sets of CD/DVD/Pendrive for electronic viewing /retreival.
554For 6\\" NB Line
555For 4\\" NB Line
556Note:-The quantities mentioned above for various pipeline sections at different locations within & around the GA..
557TRIAL PITS
558Excavation of trial pits on pipeline route (min Size 1.5 Mtr x 1.0 Mtr.) or any other Location as per instruction of engineer incharge in all kinds of underground strata up to existing laid pipeline without damaging pipe coating.Barricating the trial pit area including application of warning tape /warning sign around the trial pit till the necessary checking & backfilling of same as per direction of Engineer Incharge.Cleaning of excavated pipe & other underground facilities including supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. for carryout the reffered work as per directions of the Engineer-in-charge.
559NOTE:- Quantity mentioned above is for the various locations within the GA and may increase/decrease or not to be executed based on site requirement.
560Pipeline Laying Liasioning & Co-odrination (including utility crossing) and obtaining permission / NOC from the statuatory / concerned authorities. Assistance in ROU / Pipeline Route Alignment Corridor opening & closing and their maintainence/ management.
561Submitting request for (after obtaining the letter from client) permission , follow up , assisting in site inspections / route suevey / site report making/making site inspection drawings, submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and collecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation, District administration, River Authority,SEZ etc. Obtaining work permits /NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Assistance in required length and width/restricted width of ROU opening & closing and their maintainence/ management both side of the crossings.
562For6'& 4\\" NB Line
563NOTE-(i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage.(ii) The total quantities mentioned against the above SOR items are applicable for the works carried out as mentioned above for laid, tested & commissioned or preserved with nitrogen main steel pipeline section and quantity mentioned against each SOR item is for multiple/various crossings at different locations within the GA.(iii) 90% payment for the above item shall be made only after the certified length of executed, tested & commissioned or preserved with nitrogen main steel pipeline section by Engineer–in–charge (EIC)/ RCM. Rest 10% payment will be made after acceptance of the system by Owner/PMC and after closure of contract.
564GENERAL NOTE FOR ALL ABOVE SOR ITEMS -(i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC.(ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, bidders are requested to quote such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC.(iii) Laying/ installation of pipeline along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of pipeline … etc within the Geographical Area (GA).(iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.
565TEMPORARY CATHODIC PROTECTION WORKS
566Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protection [TCP] system using galvanic anodes to protect the external surface of the entire steel pipeline network approximately 15 kM in length, against soil- side corrosion for minimum 2 years or till commissioning of permanent CP system whichever is later. All work shall be carried out conforming to the Scope of work, Design Basis, Data Sheets, standard specification,and vendor list attached and provisions of GCC, SCC including Technical specifications, OWNER/CONSULTANT approved survey report/design package, including all materials, equipment's, consumables, start up/commissioning spares etc. including transportation, storage of materials at site, manpower, in line with direction of Engineeer in-charge.
567Soil resistivity Survey & soil/water chemical analysis
568Measurement of soil resistivity along the right of way of the main pipeline (At 500mtr Interval at depth of 1.5M, 2.5M & 3.5M) & collection of additional data like foreign pipeline, details of existing CP systems and anode beds, DC/AC power sources and systems using earth return path such as HVDC substations/earthing stations, Crossing and parallel running of electrified railways, underground power cables and other elements that may interfere with the CP system as per standard specifications and scope of work and submission of report& applicable NACE standard incuding preperation of Design, detailed engineering, preparation of design document, preparation of Test station schedule & Bill of Material.
569Collection of soil & water samples along ROW at depth of 1M, 2M & 3M at every 5 km interval (Min 03 sample at each location) for its chemical & microbial analysis along the pipeline route as per specification for corrosion survey for detection of SRB, ARB & Total dissolved H2S etc.
570Supply & Installation of pre-packed Mg Anode (5 Kg) with FACTORY CRIMPED tail cable 1Cx10 Sq.mm Unarmoured cable (with sufficient length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. Howevever min one anode is to be installed at every one kM with test staion.
571Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 20 Kg) for HT Line crossing with one cable including 1Cx25 Sq.mm armoured cable (with sufficient length), encapsulation kit termination of Anode tail cable in the TLP etc.
572Supply and installation of Test lead Points (TLP/Test stations) Small Size (300mm X 275mm X 230mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.
573Supply and installation of Test lead Points (TLP/Test stations) Big Size (475mm X 420mm X 350mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.
574Cable to pipe connection by thermit welding for 25,10 ,6 sq.mm copper cable including excavation and exposing piping , recoating with epoxy, testing etc.
575Supply & Installation of 3.7kA @30 cycles solid state Polarization cell, to be installed in the vicinity of AC transmission lines.
576Supply and installation of Zn Ribbon anode (Dia min. 12x14 mm with back fill in trench) can also be used for the grounding purpose to get lower grounding resistance.
577Supply and installation of pre-packed Cu-wire AC mitigator wire of MATCOR make or equivalent can also be used for the grounding purpose to get lower grounding resistance.
578Supply & Installation of Surge Diverter for at Insulating Joint (10/350 µS = 100kA)
579Supply and installation of GI Pipe earth electrode of 65 mm dia, 4.5 mm thickness & 3000mm long and earth pit back fill as per standard drawing Earthing of above ground cathodically unprotected pipeline at IJ Locations. Maximum allowed earth resistance shall be 2 ohms.
580Supply and Instllation of GI Strip (50X6) mm
581Supply and Instllation of GI Strip (25X3) mm
582Supply and Installation of Copper Strip (25X3) mm
583Supply, installation, testing & commissioning of Polarisation coupons each of total area of 100mm x 100mm having one side exposed area of 10 mm x 10 mm shall be provided along the pipeline at marshy areas and at vulnerable locations to monitor the external corrosion activity on the pipeline as per enclosed standard specification. Location of external Polarisation coupons & Number of magnetic devices for operation of magnetic switch shall be decided during detail engineering. The works related to collection of approximately 2-5 m of pipeline material (In pieces of 300 to 1000mm length) for fabrication of Polarisation coupons is in the scope of the Contractor.
584Supplying, laying, termination, ferruling & testing of all the cables of TCP system, Cu-Conductor, XLPE insulated, PVC sheathed, Armoured/Unarmoured as required.
5851Cx6 mm2 Armoured
5861Cx10 mm2 Armoured
5871Cx25 mm2 Armoured
588Monitoring of the TCP system, on monthly basis, till commissioning of the permanent cathodic protection system or closure of contract whichever is earlier.
589PIPING & MECHANICAL WORKS
590PLANT PIPING FOR UNDERGROUND/ ABOVEGROUND INSTALLATION
5911. Transportation including loading, unloading & handling of all piping items ( pipes, fittings, flanges & valves are free issue itmes except studs & nuts (Hot dipped galvanized as per ASTM A 153 or Equivalent), gaskets ( metallic spiral wound 300#/150# rating) from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings, insulation joints and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications & scope of work, drawings, specification as per site requirement and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.2. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, couplings, caps, plugs, gasket, stud bolts, nuts, U Clamps etc. as required for completion of job.3. Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by Gamma-ray (for sizes 2\\" and above ) , and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.4. Fixing/ Installation of weldolets, sockolets, flanges, vent and drain point connection etc., including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required. 5. Erection including prior cleaning, lifting, supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, hook up with Steel / MDPE along with Transition fitting etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc.
5926. Preparation of final bill of material based on piping GADs and Preparation of isometric and fabrication drawings.7. Carrying out Non-destructive testing as required. NDT for 2'' & above shall be paid as per separate itmes mentioned elsewhere in the SOR.8. Surface preparation before application of primer by means of sand/Copper Slag blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.9. Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specification tender specification i.e., 1 coat of inorganic zinc silicate coating @65-75 micron DFT/coat + 2 coats of Chlorinated Rubber Zinc Phosphate Primer @40 micron DFT/coat + 2 coats of chlorinated rubber finish paint @ 40 micron DFT/coat, total 225 micron DFT including supply of approved paints and primers, application of primer and paints, identification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc10. Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.
59311. Precommissioning & making operational all piping system and equipments and provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.12. Clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue material to Owner's designated plac(s); completing all works in all respects as per the AFC drawing, specifications, standards and other provisions of Contract and instruction of Engineer-in-charge.13. Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.14. Hook-up works including making provision for hooking up and carrying out shutdown activities at terminals if necessary.15. Complete Carbon Steel Piping Work with painting including all fittings, Flanges and supply of all required gaskets, studs bolts & nuts etc. as described above as per Inch-dia.
594Complete Carbon Steel Piping Work with painting and installation including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under item 1.0 above
595ASTM A106, Gr. B (Charpy), Seamless, BE 4\\" NB
596ASTM A106, Gr. B (Charpy), Seamless, BE 2\\" NB
597ASTM A106, Gr. B, Seamless, PE 1.5\\" NB
598ASTM A106, Gr. B, Seamless, PE 1\\" NB
599ASTM A106, Gr. B, Seamless, PE ¾\\" NB
6001) Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this.2) All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. 3) All coupling, nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under erection rate.4) NDT of Joints below 2\\" is to be included in above rate. However, payment of radiography of joints (2\\" and above) shall be paid seperately under SOR item for RADIOGRAPHY mentioned elsewhere in this SOR.
601SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES
602Complete work of supply of pipes, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to, the following items in accordance with relevant specifications indicated in clause of SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.
603Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.
604CARBON STEEL PIPES
605ASTM A106, Gr. B (Charpy), Seamless, BE (For 4\\" NB), S80
606ASTM A106, Gr. B (Charpy), Seamless, BE (For 2\\" NB), XS
607ASTM A106, Gr. B, Seamless, PE (For 1\\" NB) , XS
608ASTM A106, Gr. B, Seamless, PE (For¾\\" NB), S160
609FLANGES
610Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], (For 4\\"),300#
611Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], (For 2\\"),300#
612Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.11), (For ¾\\" ), 300#
613Blind Flanges
614Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), (For 4\\"), 300#
615Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), (For 2\\"), 300#
616Blind Flanges (B-16.5, A105, 125 AARH, RF), (For ¾\\" ), 300#
617Spectacle Blind , 125 AARH, RF,300#/150#, 2 \\"
618Spectacle Blind , 125 AARH, RF,300#/150# , 4''
619ELBOW
62090° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW, (For 4\\", S80)
62190° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW, (For 2\\", XS)
62245° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), (For 4\\", S80)
62345° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), (For 2\\", XS)
624Equal Tee (A234, Gr. WPB (Charpy), B-16.9), BW, Thickness match with pipe thickness ( For 4\\")
625Equal Tee (A234, Gr. WPB (Charpy), B-16.9),BW ,Thickness match with pipe thickness ( For 2\\")
626Unequal Tee (A234, Gr. WPB (Charpy), B-16.9), BW ,Thickness match with pipe thickness) (For 10\\" x 4\\")
627Unequal Tee (A234, Gr. WPB (Charpy), B-16.9), BW, Thickness match with pipe thickness) (For 4\\"x 2\\")
628SOCKOLET
629SOCKOLET (A105, MSS-SP, 6000#) ,4\\" x ¾\\" , ( Thk-S80 x S160)
630SOCKOLET (A105, , MSS-SP, 6000#) , 2\\" x ¾\\", ( Thk-XS x S160)
631BARRED TEE (As per Standard Specification and Data Sheets enclosed)
632BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,8\\" x 4\\"
633BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,6\\" x 4\\"
634BARRED TEE (As per Standard Specification and Data Sheets enclosed) ,4\\" x 4\\"
635INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed)
636INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed) ,4\\" ,300#
637INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed) ,2\\" ,300#
638Reducer (A 234 Gr. WPB (Charpy), BW)
639Reducer (A 234 Gr. WPB (Charpy), BW), S80 x XS, ( For 4\\"x2\\")
640Note:i) All butt welded fittings end shall generally match with connecting pipe wall thickness however in case of misalignment Contractor shall have to do end preparation without any extra cost.
641ii) All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.
642Supply of Valves
643Complete work of supply of valves including all taxes,duties,transportation and inspection charges but not limited to ,the following items in accordance with relevant Specifications & relevant Data Sheets indicated in scope of work indicated in SCC, drawings, specification and instructions of EIC and as perall provisions of the CONTRACT DOCUMENT.
644Plug Valves
645Butt Welded End (As per PMS & Datasheet), 2\\",300#
646Supply of Ball Valves
6474\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
6482\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
6493/4\\" Ball Valve, Butt Welded (BW) , Full bore (FB) , 300#
6504\\" Ball Valve, Flange ended (FE) , Full bore (FB) , 300#
6512\\" Ball Valve, Flange ended (FE) , Full bore (FB) , 300#
652Note: i).Order for above items shall be placed only after approval from EIC. Refer data sheet & TS of Ball valves.ii). Quantities mentioned are tentative and may increase or decrease during execution of work depending upon site requirement. Contractor required to supply materials after assessing the site requirement and in multiple lot or as per Release Order/ Sub Purchase Order wise. All material either in multiple lot or as per Release Order/ Sub Purchase Order wise or as decided by EIC shall be supplied by bidder within the price.
653ERECTION OF VALVES ( As per P & ID )
654Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.
655Flanged/ Welded Valves (Full Bore/ Reduced Bore)
656Ball / Plug Valves,6\\",300#
657Ball / Plug Valves,4\\",300#
658Ball / Plug Valves,2\\",300#
659Sockolet Welded Valve
660(Ball / Plug / Valves),¾\\", 800#
661RADIOGRAPHY
662Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.
663Radiography by Gamma Rays,4\\"
664Radiography by Gamma Rays,2\\"
665FIELD INSTRUMENTS
666Supply of Pressure Gauges inclusive of supply of erection accessories as per data sheet.
667Installation, Calibration, Testing & Commissioning of Pressure Gauges inclusive of supply of necessary piping materials/tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing as per standard
668Supply of Miscellaneous items
669Pipeline locator as per specification indicated in the tender
670ERECTION OF SKIDS & OTHER EQUIPMENTS
671Handling, including lifting, transportation from Company's stores to Contractor's work-shop for fabrication or/ and to worksite for field fabrication, assembly of parts/ sub-assemblies, erection for all Metering skids/DRS/MRS/Compressors, equipments supplied by company above ground/ underground at all elevation/ depth, fixing of foundation bolts, welding wherever required, aligning, grouting, hooking-up, cleaning and flushing by water draining, drying by compressed air, providing all mountings, ancilliary, enabling works as required and completing in all respect as per drawings, specification and instruction of Engineer-in-charge. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, finish coat of painting including rub down & touch up of shop primer/ paint scrapping of shop primer/ paint and further their painting after application of primer as per specification, wherever required by Company. The Includes Shifting of DRS / MRS along with all accessories from Company's stores to the desired location including Loading, Unloading, Transportation and fixing by the fasteners on foundation with suitable capacity Hydra / Crane. Placing the DRS/ MRS on Foundation including aligning with Inlet / Outlet piping. Erection of all accessories of DRS / MRS such as Solar panels, Venting pipe, Junction box etc. Providing required Manpower during commissioning of DRS / MRS along with tools, tackles.
672MRS ( steel inlet) /DRS Skids (with empty weight upto 2 Ton along with accessories such as solpar panel, Venting Pipe, Junction box etc- DRS/ MRS skids of all types
673MRS ( steel inlet) /DRS Skids (with empty weight above 2 Ton & upto 6 TON i.e DRS of capacity ranging from 2500 SCMH to 10000 SCMH, DRS/ MRS skid of all types
674NOTES-1) Payment of above ground Piping fabrication works cover in above SOR items shall be paid under SOR item no. 18.0 (including its notes ) 2) The quantity mentioned against above SOR item are for multiple equipment having different weight and weight of each eqipment shall be maximum upto 10.0 MT. The each equipment shall be installed at different location within the GA.
675FIRE FIGHTING (Portable Extinguishers)
676Fire Fighting Equipment
677Supply, installation and commissioning of the following fire fighting equipment:
67875 kg capacity DCP type (trolley mounted)
67910 kg capacity DCP fire extinguisher (trolley mounted)
6804.5 kg capacity CO2 fire extinguisher (portable) as per IS:2878
6816 Nos. Sand Buckets with stand & canopy
682NOTE:1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of Engineer-in-charge. The unit rate shall be operated to work out the final payment to the contractor.
6832) In each area, quantities given against individual item may be utilise/ used for other consumer in same area.
6843) The rates shall be applicable for all underground/ aboveground piping system and associated stations/ terminals.
685Note:(i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC.(ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, rates are inclusive for such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC.(iii) Installation of all underground/ aboveground piping system along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of existing piping system … etc with in the Geographical Area (GA).(iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.
686CIVIL WORKS
687EARTH WORK IN EXCAVATION/ SITE GRADING AND BACKFILLING
688Earth work in excavation /site grading in all kinds of soil including soft rock in any plan dimension up to required depth including backfilling of excavated earth at any location in layers of 300mm and compacted up to 95% to its MDD at all heights and depths. Surplus and unserviceable earth shall be disposed up to any lead in all conditions. Soil to be levelled and neatly dressed complete in all respect as per scope of work, detailed construction drawings, technical specifications and direction of the Engineer-in-Charge.
689Note:-1. This Rate shall be applicable only for excavation which are not included as a part of respective SOR Item.2.The Contractor shall take into account the provision for excess excavation required for necessary working space, cutting in slopes etc., which may be required for excavation and other allied works and refilling the side slopes and working space in layers as per requirement.3.Rate to include cost of all labour, tools, tackles, equipment, hire charges, shoring, bailing and pumping out water as required etc. with all bye works and sundry works complete in all respects.4.NET CUM of excavated quantity in CUM shall be measured for payment.5. To be read in conjunction with Particular Job Specification.
690BRICK WORK
691Providing and laying brick work with brick class designation M-5.0 of IS:1077 in Cement Mortar 1:4 (1cement : 4 sand) in steps, load bearing structures, drains, or at any other location at all depths & height for all leads including providing required finishes, curing, scaffolding, etc., complete as per specifications and drawings with all bye-works as per direction of the Engineer-in-charge.
692Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, excavation, PCC M10, plastering with 15 mm thick cement plaster on exposed faces with 1:4 cement mortar( 1 cement : 4 Sand) , painting with bitumen etc. as per requirement with all bye-works and sundry works complete as per drawings.2. To be read in conjunction with Particular Job Specification.
693PLAIN CEMENT CONCRETE
694Supplying and laying plain cement concrete of grade M 10 with stone aggregate 40mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, mass concrete works, chambers, cable trench, under floors and any other locations, at all levels and locations (which are not covered as part of composite items) as per drawings, specifications and directions of the Engineer-in-charge.
695Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.
696REINFORCED CEMENT CONCRETE
697Providing and laying Reinforced Cement Concrete of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, beam, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall etc. including excavation, PCC M10 in mud mat, shuttering, construction joints, bitumen painting on surfaces in contact with soil,supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-in-charge.
698Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.
6991. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete.
7002. To be read in conjunction with Particular Job Specification.
701REINFORCEMENT STEEL
702Supplying and Fabricating and Fixing in position HYSD Steel Reinforcements/ TMT Grade Fe-415/Fe 500D conforming to IS1786-2008 at all levels and positions including the Cost of transportation, Straightening, Cutting, Bending, Cranking, Binding, Welding, Provision of necessary Chairs and Spacers, Preparation of bar bending schedule, getting the same approved by EIC etc., complete as per Drawings and Specifications and including Cost of binding wire, Labour etc., all complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. The Chairs and Spacer Bars provided will not be measured for payment.
703Note:-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.2. To be read in conjunction with Particular Job Specification.3. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as steel Reinforcement, binding wire and other minor construction materials, testing etc. all bye works and sundry works. 4.Chairs, Laps, Spacers, Wastage etc. shall be to contractor's account.5.To be read in conjunction with Particular Job Specification.
704CONCRETE PAVEMENT
705Providing and laying reinforced cement concrete pavement 150 mm thick in M-25 grade with 20 mm and down grade crushed stone aggregate in pavement, including earthwork in excavation, preparation of base (i.e. compacted subgrade, 200 thk sand and 100 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen sand mix filler material etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.
706150mm thick in Pavements in Process Areas (Type - I)
707Note :-1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, providing and fixing reinforcement steel, shuttering, earthwork in excavation and backfilling using serviceable earth in all conditions, preparation of base, etc. with all bye works and sundry works. Cost of works towards pipe supports & sleepers being raised from pavement is covered under respective RCC items.2. To be read in conjunction with Particular Job Specification.
708VALVE PITConstruction and handing over of RCC Valve Pit as per tender drawing, technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per tender drawing.
709RCC Valve pit of internal Dimensions 2.1m x1.5m: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
710RCC VALVE PIT - 2.0 m x 1.9 m with RCC cover: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects. Must be able to support a maximum load of 25 tons, its design has to be such as to allow top side to be filled with the same material as the surface, roadway of pavement (concrete, asphalt, slabs etc.). as per Drawing attached.
711RCC Valve pit of internal Dimensions 1.2m x1.5m: Construction and handing over of RCC Valve pit with RCC cover including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
712RCC Valve pit of internal Dimensions 1 m x1 m: Construction and handing over of RCC Valve pit with steel cover /RCC cover as directed by engineer In charge including all civil works i.e. excavation, piping supports for pedestals with insert plates as required, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per Drawings , Technical specification and direction of engineer-in-charge complete in all respects.
713STEEL STRUCTURAL WORKS
714Steel structure Fabrication
715Supplying, Fabricating & Erecting in position steel structures including single/double leaf gate fabricated out of MS Girders, channels, Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform, Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, etc. of any size/dia for required design including cutting, welding, bolting, hoisting, fixing in position, including application of one coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at site .The work is to be completed in all respect as per specification ,scope of work, detailed construction drawings and directions of the Engineer-in-charge.
716Note :[ Rate to include cost of all labour, nut, bolts, tools, tackles, hire charges royalties, levies, transportation, scrap value, gas cutting, welding, other consumables, paints, compressed air, water, electric power etc. all complete.]
717Providing and fixing Fencing Structure
718Supplying, fabricating & fixing steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per enclosed drawing, technical specifications,scope of works and directions of the Engineer-In-Charge.
719Fencing height 2.1m
720Fencing height 1.5m
721Notes: 1.The quantities indicated are estimated values and hence are approximate. Final payment will be made based on actual quantities to be certified by the Purchaser.2.The cost of MS bolts (permanent and service), washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants, etc., as required for the work are included in the rates.3.All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with 4.Time schedule, are inclusive in the rates5.All accessories like MS tower bolts, MS Pivot, MS Wheels, MS Tee section, locking arrangement etc. shall be measured by weight only.6.Contractor shall ensure proper alignment and smooth operation of Gate
722SUPPLY OF NITROGEN: Supply and assistance in Purging nitrogen for Existing U/G pipline system
723Purging of Nitrogen for existing underground pipeline network to the specified acceptance criteria before carrying out shutdown/hotwork, providing assistance during the complete duration of shutdown/hotwork operations for entire pipeline network system including supply of all equipment, man-power, consumables (including pigs & nitrogen required for purging/filling ) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-charge.
724Supply of Transition Fittings
725PE to CS of size 125DN x 4 inch
726PE to CS of size 63DN x 2 inch
727Supply of GI sleeve of medium grade as per instruction of the Engineer-In-Charge
728GI Sleeve - 4'' NB as per IS 1239
729GI Sleeve - 8'' NB as per IS 1239
730HOT TAPPING WORKS
731Arranging the approved specialised agency along with hot tapping machine with all its accessories, cutting tool etc. for hot tapping works, obtaining all permissions/ clearances/ permits from Owner/ concerned authorities, submitting all procedures for approval & obtaining approval there on prior to start of works, carrying out hot tapping works including installation of split tees & full bore ball valve with support on existing pipeline of 12\\", 10”, 8\\" 6\\" and 4\\" , supply and installation of Spectacle and blind (as per requirement) and construction of Valve pit post hot tapping installation. However, construction of Valve pit shall be paid separately as per respective item.Item also includes supply of all materials i.e. Full encirclement Split Tee ( ASTM A 234 GR.WPB (charpy) , Rating 300# , min. Sch 40 /6.4 mm thk x min. Sch 40/6.4 mm thk ), Full bore ball valves ( API 6D, Body & Ball material - A216 Gr.WCB/A234 Gr.WPB (Charpy) , Stem material- AISI 4140 , Rating- 300#, Ends--One side BW other side flanged, Full bore), Galvanized studs and nuts, metallic gaskets and all associated accessories as per specification . Approval to be obtained for specialised agency to carry out the Hot-tapping who has prior experience in carrying out Hot-tapping. The item also includes, identifying the depth and cover existing pipeline at the prescribed location, excavation, Consumables for welding & testing requirements, tools, tackles, skilled and unskilled manpower, safety and firefighting system etc, carrying out NDT i.,e (i) UT check to measure the actual thickness & laminations check of run pipe, (ii) DPT testing root run welding for both longitudinal & circumferential root welding, (iii) Magnetic particle testing after completion of entire welding to check discontinuities such as cracking, porosity on surface & sub-surface and Hydrostatic testing for fitting , valve & tapping machine assembly and carrying out all works as per the requirements of specification, other provisions of contract document and instructions of Engineer-in-charge. Final restoration of area to its original to the entire satisfaction of Engineer-in-charge.
732Run Pipe NB (Inches) x Branch Pipe NB (Inches)
7338\\" x 4\\" (With Split Tee) (300#)
7346\\"x4\\" (With Split Tee) (300#)
735NOTE- Quantity mentioned above is for the various locations on charged pipelines within the GA and may increase/decrease or not to be executed based on site requirement.
736HOT WORK
737Complete shutdown work required for interconnection with existing underground pipelines including fabrication of piping section having the portion of run pipes of 8''/4\\" NB, Tees , Elbow, Bend etc with branch pipe of 8\\"/6\\"/4\\"/2 NB size as instructed by EIC(total fabricated length shall not be increasing by 6 mtrs) , welding , NDT, Coating , cleaning with Air , Excavation of Pit , back filling, restoration of Pit , removal of coating from line pipes including run pipe/s , re-coating etc for hooking up of 8\\"/6\\"/4\\"/2\\" NB line pipe. supply of required quantity of nitrogen for purging till acceptance of PMC/Owner and used for other activities for main line / Run pipe of 8''/4\\" NB as per instruction of Engineer In Charge . Other wokrs which are required additionally will be paid as per seperate SOR mentioned else where.
738For 8\\" NB Line
739For 6\\" NB Line
740For 4\\" NB Line
741NOTE-1. Quantity mentioned above is for the various locations within the GA and may increase/decrease or not to be executed based on site requirement.2. Above item covers all work required to be complete the hot work including supply of nitrogen as per requirement. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57558556
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 08-10-2026
Authority
Authority Name Gas Authority Of India Limited
Work Description Tender for Hiring Of Agencies For Steel Gas Pipeline Laying Works For Sundargarh-Jharsuguda (Rourkela) & Puri-Ganjam-Nayagarh Ga Of Gail Gas Limited On 18 Month annual rate contract
Basic Detail
Tender No GAIL GAS/NOIDA/2295/SG/2026-27/74
Bidding Type Tender
Location
City Ghaziabad
State Uttar Pradesh
Key Dates
Publish Date 17 Sep 2026
Submission Date 08 Oct 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 20 Lakhs
Exemption Available
Document List
9ab384a3-cd41-438d-8d5f-b930fce052a8.html
BOQ_339556.xls
Tender.pdf
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 08, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 11 days
Oct 08, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
html

9ab384a3-cd41-438d-8d5f-b930fce052a8.html

xls

BOQ_339556.xls

pdf

Tender.pdf

pdf

Tendernotice_1 (10).pdf