Tender For Construction Work Of Drain From Maharishi Valmiki Temple To Christmas Cemetery On Roorkee Road.
Tender Overview
Project Description
Tender for Construction Work Of Drain From Maharishi Valmiki Temple To Christmas Cemetery On Roorkee Road.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Sep-2026 | Drawing | Technical Bid | 06-Oct-2026 |
| 2 | 17-Sep-2026 | Revised Tender Documents | Technical Bid | 06-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 2 | Excavation by mechanical means(Hydraulic excavator) / manual means in foundationtrenches or drains (not exceeding 1.5 m in width or 10sqm on plan), including dressing of sides and rammingof bottoms, for all lift, including getting out the excavatedsoil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. |
| 3 | 1:5:10 (1 cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources). SI.No.4.1.10/2023/DSR |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting concrete, to improve durability and workability without impairing stre Including pumping of concrete to site of laying, curing, carriage for all leau excluding the cost of centering, shuttering, finishing and reinforcement asrection of the engineer-in-charge, for the following grades of concrete.: |
| 5 | Note: Extra cement up to 10% minimum specified cement content in design mix shall be payable separa... In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. |
| 6 | 5.33.1 All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg/cum. SI.No.5.33.1.1/2023/DSR |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting concrete, to improve durability and workability without impairing stre Including pumping of concrete to site of laying, curing, carriage for all leau excluding the cost of centering, shuttering, finishing and reinforcement asrection of the engineer-in-charge, for the following grades of concrete.: |
| 8 | Note: Extra cement up to 10% minimum specified cement content in design mix shall be payable separa... In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. |
| 9 | 5.33.2 All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg/cum. SI.No.5.33.2.1/2023/DSR. |
| 10 | Steel reinforcement of RCC work including streighteing, cutting, bending, placing in position & binding all complete upto plinth level. Thermo mechanically treated bars of grade Fe 500D or more. S.I. No. 5.22.6/DSR/2023 |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.....................5.9.2/DSR/2023 |
| 12 | S/F of sign Marble board (A.R.). |
| 13 | By mechanical Transport including loading,unloading and stacking upto 1 K.M. complete for all .lift................1.1.2/DSR/2023 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender