Educational and Research Institute Government Departments Closing in 18 days TDR #57549646

Bids Are invited for Operation And Maintenance Of Lifts (Elevators) - Complete System - Camc Of First Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine

Issued by Government Departments · Jodhpur, Rajasthan
Tender Value
36.28 Lakhs
Estimated cost
Bid Submission
07 Oct 2026
18 days left
EMD
30754
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jodhpur → Rajasthan
EMD Exemption
Not Available
Quantity
7

Project Description

Bids Are invited for Operation And Maintenance Of Lifts (Elevators) - Complete System - Camc Of First Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Camc Of Second Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Camc Of Third Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge.

BOQ

Sl. No. Item TitleItem Description
1CAMC of First YearCAMC of First Year
2Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
3Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
4Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
5Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
6CAMC of Second YearCAMC of Second Year
7Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
8Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
9Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
10Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
11CAMC of Third YearCAMC of Third Year
12Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Type-II with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of saf+C9:C11ety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
13Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 5 floor (Ground + 04 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
14Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), installed at Old Boys Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.
15Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.Comprehensive maintenance of TK Elevator Lift Make 13 Passengers lift serving 6 floor (Ground + 05 floors), Installed at PG Hostel with machine room type, with rated speed of 1M/s and rated load of 884 KG including all repairing, lubrication of all parts and components governed by following i/c C/W smooth, machine motor, controlled gear and other parts i/c worm gears and thrust bearing, break magnet coil, brake motor, brake shoes, Carbon brushed, winding of commentator’s rotary elements, contact - coil, resistance temperature for preparation of motor, all other machined parts using genuine parts for this purpose. Renewable of guide shoes, guide roller, wires rope and other necessary to ensure smooth and quite operation and adequate factor of safety to equalize the tension on all hoisting rope and replacement of conductor cable traveling cable, all governor, periodically examination and lubrication alignment of all necessary parts i/c traveling cable, main cable, safety device, car doors limit switch, landing door and car gate lock, car and CWT oil tank condition, all brakes, emergency brakes, Fire Manual Switch etc. as req, all electronics cards, start, stop, landing and push buttons, SMPS card, contractors, transformers, oil tank, choke, relays, Single switch preventer, main drive, VVVF, DoL & DcL switches, landing display and car display, couplings bush, door roller UPS, MCCB, MCB, electrical parts and electronics all parts inclusive of Lights, fans, batteries and all others parts as required for operation of lift and as instructed by Engineer-In-Charge.

AI Tender Summary

OUR REF NO 57549646
AUTHORITY Government Departments
TENDER VALUE 36.28 Lakhs
LAST DATE 07-10-2026
Authority
Authority Name All India Institute Of Medical Sciences
Work Description Bids Are invited for Operation And Maintenance Of Lifts (Elevators) - Complete System - Camc Of First Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Camc Of Second Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Camc Of Third Year , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Type-Ii With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Saf+C9:C11ety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 5 Floor (Ground + 04 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Old Boys Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge. , Comprehensive Maintenance Of Tk Elevator Lift Make 13 Passengers Lift Serving 6 Floor (Ground + 05 Floors), Installed At Pg Hostel With Machine Room Type, With Rated Speed Of 1M/S And Rated Load Of 884 Kg Including All Repairing, Lubrication Of All Parts And Components Governed By Following I/C C/W Smooth, Machine Motor, Controlled Gear And Other Parts I/C Worm Gears And Thrust Bearing, Break Magnet Coil, Brake Motor, Brake Shoes, Carbon Brushed, Winding Of Commentators Rotary Elements, Contact - Coil, Resistance Temperature For Preparation Of Motor, All Other Machined Parts Using Genuine Parts For This Purpose. Renewable Of Guide Shoes, Guide Roller, Wires Rope And Other Necessary To Ensure Smooth And Quite Operation And Adequate Factor Of Safety To Equalize The Tension On All Hoisting Rope And Replacement Of Conductor Cable Traveling Cable, All Governor, Periodically Examination And Lubrication Alignment Of All Necessary Parts I/C Traveling Cable, Main Cable, Safety Device, Car Doors Limit Switch, Landing Door And Car Gate Lock, Car And Cwt Oil Tank Condition, All Brakes, Emergency Brakes, Fire Manual Switch Etc. As Req, All Electronics Cards, Start, Stop, Landing And Push Buttons, Smps Card, Contractors, Transformers, Oil Tank, Choke, Relays, Single Switch Preventer, Main Drive, Vvvf, Dol & Dcl Switches, Landing Display And Car Display, Couplings Bush, Door Roller Ups, Mccb, Mcb, Electrical Parts And Electronics All Parts Inclusive Of Lights, Fans, Batteries And All Others Parts As Required For Operation Of Lift And As Instructed By Engineer-In-Charge.
Basic Detail
Tender No GEM/2026/B/8044362
Bidding Type Tender
Location
City Jodhpur
State Rajasthan
Key Dates
Publish Date 16 Sep 2026
Submission Date 07 Oct 2026
Open Date 08 Oct 2026
Finance
Tender Value 36.28 Lakhs
Tender Fee Ref. Documents
EMD 30754
Exemption Not Available
Document List
6ee8450c-1e35-4f12-98a9-44dbc16392b8.pdf
1789554972.xlsx
1789555348.pdf
1789555361.pdf
1789555380.pdf
LiftNIT_3be70801-ee13-4d50-93491789555771133_chandresh.pareek.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Oct 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

6ee8450c-1e35-4f12-98a9-44dbc16392b8.pdf

xlsx

1789554972.xlsx

pdf

1789555348.pdf

pdf

1789555361.pdf

pdf

1789555380.pdf

pareek

LiftNIT_3be70801-ee13-4d50-93491789555771133_chandresh.pareek.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders