Tender For Service Agreement For Expert Supervision, Inspection, Troubleshooting, Repair And Maintenance Services For Alfa Laval Make Packinox Heat Exchangers Installed Acrossindianoil Refineries
Tender Overview
Project Description
Tender for Service Agreement For Expert Supervision, Inspection, Troubleshooting, Repair And Maintenance Services For Alfa Laval Make Packinox Heat Exchangers Installed Acrossindianoil Refineries
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Sep-2026 | Amendment-1 | Date | 15-Oct-2026 |
| 2 | 16-Oct-2026 | Amendment-2 | Date | 30-Oct-2026 |
| 3 | 30-Oct-2026 | Amendment-3 | Date | 06-Nov-2026 |
| 4 | 06-Nov-2026 | Amendment-4 | Date | 13-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SERVICE AGREEMENT FOR EXPERT SUPERVISION, INSPECTION, TROUBLESHOOTING, REPAIR AND MAINTENANCE SERVICES FOR ALFA LAVAL MAKE PACKINOX HEAT EXCHANGERS INSTALLED ACROSS INDIANOIL REFINERIES |
| 2 | Deputation charges for 1 (one) Supervisor unless specificallymentioned.The UNIT of Measurement (UOM) -1 DAY means supervision of 1 supervisor per shift of 8 hours duty. |
| 3 | Deputation of 2 (two) Welders, if any repair job is required ininstalled packinox exchangers.The UNIT of Measurement (UOM) -1 DAY means charges for 1 (one) welder for 08 Hrs Shift for repair job. |
| 4 | Charges for preparation work prior to actual site job for plan,engineering and reports.The UNIT of Measurement (UOM) -EA (EACH) means lumpsum charges for preparatory work for each visit/mobilization. |
| 5 | Submission of Inspection, Repair, Hydrotest/Pneumatic Test Reports & Final Job Completion Report by M/s Alfa Laval within 30 Days of Job Completion for all Packinox Heat Exchangers undergone for maintenance/repair job.The UNIT of Measurement (UOM) -EA (EACH) means lumpsum charges for submission of final report for each visit/mobilization. |
| 6 | All consumables required for repair of packinox exchangers will be in scope of M/s Alfa Laval only. This includes any specificEquipment/Materials, T-Shape Stainless Steel blocking pieces,Stainless Steel spacers, Grinding Wheel, Material for channel repair etc.The UNIT of Measurement (UOM) -EA (EACH) means lumpsum charges for consumables used for the repair of packinox heat exchangers as per requirement of site. |
| 7 | To & Fro transportation air fare (economy class) towards mobilization and demobilization of expert from France airport to Nearest Airport shall be reimbursed at actual on submission of documentary evidence per trip (To & Fro) per person. The details shall be as mentioned in Special Consiitons of Contract -Technical of the tender. The UNIT of Measurement (UOM) -EA (EACH) means charges for each Visit. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender