Power Government Departments Closing in 9 days TDR #57541750

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate Wi

Issued by Government Departments · Mathura, Uttar Pradesh
Tender Value
10.20 Lakhs
Estimated cost
Bid Submission
26 Sep 2026
9 days left
EMD
10210
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mathura → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 8.5 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of 11 Mtr Long St Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of 11 Kv Xlpe Cable Size 3X70 Sq.Mm. Cable Form Store Center Mathura/Agra Including Cost Of Shifting Of Drum From Inside Of Store, Removing Of Cable From Drum And Re-Rolling Of Extra Removed Cable Including Loading & Unloading At Both Ends. , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Single Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Mounting Of 100 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X50 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X95 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X120 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Installation Of Distribution Box With Cl As Per Respo Norms , Laying 3X70 Sqmm Xlpe Cable In G.I. Pipe/Trench As Per Direction Of Supervising Engineer Work Includes Making Loops And Connecting The Xlpe Cable With Double Pole And Complete Commissing Of The Line As Per Respo Norms. , Providing & Fixing Of 11 Kv Cable Indoor/Outdoor Jointing Kit Of Size 3X120 Sq.Mm Outdoor Including Removal Of Insulation, Semi-Conductor Of The Cable End And Filling Of Cable Box Complete Work As Per Direction Of Supervising Engineer. , Making Of 11 Kv Guarding By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. (Work Includes All Labour, T&P Etc. Required For Proper Completion Of Work) As Per Respo Norms. , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor. , Dismentling Of Iron Scrap I.E. Conductor, St Pole, Pcc Pole, Transformers All. Wire Etc. And Its Carriage To J.E. Store/Store Center Mathura As Per Direction By Supervising Engineer.

BOQ

Sl. No. Item TitleItem Description
1Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.
2Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)
3Carriage of 11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)Carriage of 11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)
4Carriage of 11 KV XLPE Cable size 3x70 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.Carriage of 11 KV XLPE Cable size 3x70 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
5Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
6Erection of Single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
7Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
8Erection of Single pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Single pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
9Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)
10Mounting of 100 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)Mounting of 100 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)
11Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
12Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
13Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
14Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
15Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x50 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x50 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
16Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x95 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x95 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
17Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of Arial Bunch Conductor of Size 3x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
18Installation of 11 KV Fuse Set as per RESPO NormsInstallation of 11 KV Fuse Set as per RESPO Norms
19Installation of Distribution Box with Clamp as per RESPO NormsInstallation of Distribution Box with Clamp as per RESPO Norms
20Laying 3x70 sqmm XLPE Cable in G.I. Pipe/Trench as per direction of supervising engineer work includes Making loops and connecting the XLPE Cable with double pole and complete commissing of the line as per RESPO Norms.Laying 3x70 sqmm XLPE Cable in G.I. Pipe/Trench as per direction of supervising engineer work includes Making loops and connecting the XLPE Cable with double pole and complete commissing of the line as per RESPO Norms.
21Providing & Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x120 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer.Providing & Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x120 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer.
22Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms.Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms.
23Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
24Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.
25Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.
26Dismentling of Iron Scrap i.e. Conductor, ST Pole, PCC Pole, Transformers All. Wire etc. and its carriage to J.E. Store/Store Center Mathura as per direction by supervising engineer.Dismentling of Iron Scrap i.e. Conductor, ST Pole, PCC Pole, Transformers All. Wire etc. and its carriage to J.E. Store/Store Center Mathura as per direction by supervising engineer.

AI Tender Summary

OUR REF NO 57541750
AUTHORITY Government Departments
TENDER VALUE 10.20 Lakhs
LAST DATE 26-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 8.5 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of 11 Mtr Long St Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of 11 Kv Xlpe Cable Size 3X70 Sq.Mm. Cable Form Store Center Mathura/Agra Including Cost Of Shifting Of Drum From Inside Of Store, Removing Of Cable From Drum And Re-Rolling Of Extra Removed Cable Including Loading & Unloading At Both Ends. , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Single Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Mounting Of 100 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X50 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X95 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Size 3X120 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Installation Of Distribution Box With Cl As Per Respo Norms , Laying 3X70 Sqmm Xlpe Cable In G.I. Pipe/Trench As Per Direction Of Supervising Engineer Work Includes Making Loops And Connecting The Xlpe Cable With Double Pole And Complete Commissing Of The Line As Per Respo Norms. , Providing & Fixing Of 11 Kv Cable Indoor/Outdoor Jointing Kit Of Size 3X120 Sq.Mm Outdoor Including Removal Of Insulation, Semi-Conductor Of The Cable End And Filling Of Cable Box Complete Work As Per Direction Of Supervising Engineer. , Making Of 11 Kv Guarding By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. (Work Includes All Labour, T&P Etc. Required For Proper Completion Of Work) As Per Respo Norms. , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor. , Dismentling Of Iron Scrap I.E. Conductor, St Pole, Pcc Pole, Transformers All. Wire Etc. And Its Carriage To J.E. Store/Store Center Mathura As Per Direction By Supervising Engineer.
Basic Detail
Tender No GEM/2026/B/8028431
Bidding Type Tender
Location
City Mathura
State Uttar Pradesh
Key Dates
Publish Date 16 Sep 2026
Submission Date 26 Sep 2026
Open Date 27 Sep 2026
Finance
Tender Value 10.20 Lakhs
Tender Fee Ref. Documents
EMD 10210
Exemption Not Available
Document List
22323091-7fd3-41d7-93d3-9c98fc5eb007.pdf
1789125198.xlsx
1789124933.pdf
1789124956.pdf
1789124965.pdf
1789124971.pdf
1789125208.pdf
1789125211.pdf
ATC16_bc46d334-8277-4d4c-b97f1789125311816_EDC1MATHURABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Sep 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

22323091-7fd3-41d7-93d3-9c98fc5eb007.pdf

xlsx

1789125198.xlsx

pdf

1789124933.pdf

pdf

1789124956.pdf

pdf

1789124965.pdf

pdf

1789124971.pdf

pdf

1789125208.pdf

pdf

1789125211.pdf

pdf

ATC16_bc46d334-8277-4d4c-b97f1789125311816_EDC1MATHURABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders