Tender For Estimate For Reconstruction/Relining Of Watercourses Of Outlet Rd 14651/44652///R Of New Tarmala Link Channel Part 2
Tender Overview
Project Description
Tender for Estimate For Reconstruction/Relining Of Watercourses Of Outlet Rd 14651/44652///R Of New Tarmala Link Channel Part 2
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-Sep-2026 | date extended 28 | Date | 28-Sep-2026 |
| 2 | 12-Oct-2026 | date extended 14 | Date | 14-Oct-2026 |
| 3 | 05-Oct-2026 | date extended 7 | Date | 07-Oct-2026 |
| 4 | 28-Sep-2026 | date extended 1 | Date | 01-Oct-2026 |
| 5 | 01-Oct-2026 | date extended 5 | Date | 05-Oct-2026 |
| 6 | 19-Oct-2026 | date extended 23 | Date | 23-Oct-2026 |
| 7 | 14-Oct-2026 | date extend........ | Date | 19-Oct-2026 |
| 8 | 29-Oct-2026 | date extended 6 | Date | 06-Nov-2026 |
| 9 | 27-Oct-2026 | date extended 29 | Date | 29-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods |
| 2 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. |
| 3 | Dressing of New Earthwork |
| 4 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. |
| 5 | Re-handling of earthwork recently executed |
| 6 | Dag belling single kassi stroke minimum 7.5 cm depth. |
| 7 | Dressing of Bed and preparation of sub grade for lining. |
| 8 | Earth work in excavation in foundations, trenches etc. in allkinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. |
| 9 | Dismentalling Of Brick Work |
| 10 | Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls |
| 11 | 10mm thick Cement Plaster 1:4 ( for side walls ) |
| 12 | 10mm thick Cement Plaster 1:4 ( for Floors& Top ) |
| 13 | Supply & laying Dry Brick Bats |
| 14 | Centering and shuttering for faces of concrete |
| 15 | RCC work hand mixed 1:2:4 for slab including steel reinforcement. |
| 16 | Fixing of RCC Frame in Nakka |
| 17 | Cement Concrete 1:3:6 for CONCRETE bed |
| 18 | Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes. |
| 19 | LDPE film of 100 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge. |
| 20 | Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect. |
| 21 | Providing & Laying Brick Ballast |
| 22 | Providing & laying Cement Concrete 1:6:12 |
| 23 | Providing laying precast concrete NP2 Plain end pipes and collar with reinforcement in trenches to correct gradient and alignment, cutting of reinforcement cement concrete plain end pipes, stinging in trenches, jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct gradients levels etc. complete in all respects 400mm dia |
| 24 | Filling contraction joints with special impervious hot pour . Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender